1
Cumulative Hydrologic Impact Assessment
2
Quality Assurance \ Quality Control Panel
3
“CHIA QA\QC” FINAL REPORT February 5, 2007 – PURPOSE – PANEL MEMBERS – PROCEDURE – PANEL TIMELINE – DEP’S CHIA GUIDANCE DOCUMENT – PANEL’S GENERAL RECOMMENDATIONS FOR CHIAS
4
PANEL RECOMMENDATIONS REGARDING TREND STATION DATA, EQUIS DATA, AND WCMS
5
PANEL RECOMMENDATIONS SPECIFIC TO THE CHIA GUIDELINE SECTIONS Location\Introduction Recommendations Geology Recommendations – Hydrologic Concerns Recommendations Baseline Water Conditions Recommendations Material Damage Limits Recommendations – A consensus was not reached on material damage limits and recommendations to improve the CHIAs. Each panel member will submit their final recommendations on this issue in their individual written opinions. Material Damage Potential Recommendations Cumulative Impacts in the CIA Recommendations Evaluation of the Hydrologic Reclamation Plan (HRP) Recommendations Material Damage Finding Recommendations CHIA Map Recommendations Monitoring Recommendations
6
Any referenced water data or sample sites should be located on a map and identified
7
Rationale for monitoring plans needs to be included
8
Monitoring plans need to include more detail defining the process – INDIVIDUAL COMMENTS » Appendix A » APPENDIX B