NoProjectCapitalDescriptionPlace 1Wastewater treatment plantVND 1,350bn Build a new wastewater treatment plant, 2 phases: + Phase 1: Capacity of up to.

Similar presentations


Presentation on theme: "NoProjectCapitalDescriptionPlace 1Wastewater treatment plantVND 1,350bn Build a new wastewater treatment plant, 2 phases: + Phase 1: Capacity of up to."— Presentation transcript:

1

2 NoProjectCapitalDescriptionPlace 1Wastewater treatment plantVND 1,350bn Build a new wastewater treatment plant, 2 phases: + Phase 1: Capacity of up to 100,000m³/day + Phase 2: Capacity of up to 150,000m³/day Binh Chanh Dist. 2 System for sewerage and drainage VND 7,699bn -Rainwater collection system with length of 187 km - Wastewater collection system with length of 9km Dist.: Binh Tan, Tan Phu and Binh Chanh 3 Dyke on the left bank of Saigon River (the remaining part) from Cau Ngang ditch to Thu Thiem new township VND 200bnLength of 8,200m; underground sewers along the dyke. Urban landscape upgrade and environmental protection (in the tender process) Dist.2 and Thu Duc

3 NoProjectCapitalDescriptionPlace 4 Dyke system from Vam Thuat to Kinh Lo VND 4,674bnLength of 34km, height of +3m, the same width as that of land transport Bình Thanh, Dist., Nha be Dist., and Dist.1, Dist.4, Dist.7 5 Kinh River Barrage VND 873bnWidth of 30m, depth -15. two- sewer width of 30m, max - 6, flat valve door. Nha Be Dist., 6 Tan Thuan Barrage VND 528bnWidth of 100m, depth of -5,5. Dockside level 4, one-sewer width of 30m, max - 4, flat valve door. Dist.4 and Dist.7

4 NoProjectCapitalDescriptionPlace 7 Ben Nghe Barrage VND 171bnWidth of 140m, depth -7, one- sewer width of 30m, max -4, flat valve door, bridge 18m HL 93 Nha Be Dist., 8 Phu Xuan Barrage VND 582bnWidth of 140m, depth -7, one- sewer width of 30m, max -4, flat valve door, bridge 18m HL 93 Nha Be Dist., 9 Vam Thuat Barrage VND 375bnWidth of 60m, depth of -4. two- sewer width of 30m, max -3, flat valve door. Dist.12

5 NoProjectCapitalDescriptionPlace 10 Dredging some main sewer and drainage systems VND 999bnTotal length of 78.2km, depth from -4 to -6m, bottom width following general design Dist.7, Dist.8, Dist.12, Go Vap, Hoc Mon, Cu Chi, Tan Binh, Binh Chanh, Tan Phu, Binh Tan.

6 THANK YOU FOR LISTENING