July 2008 Construction is underway on TDS’ fiber-optic network in Monticello, Minn.
2
The first dig, July 10, 2008.
3
Digging begins – the directional drilling machine (above) bores holes where the fiber-optics will soon be laid.
4
With the directional drill in the ground, this Telcom Construction employee uses the “Digitrack” (just in front of the orange stake) to help steer and track the drill head.
6
Members of the construction crew measure the depth of existing facilities (cable, water, gas, etc.) to avoid interrupting current services while digging.
7
This reel of Innerduct will soon be inserted into the holes made by the directional drilling machine; the fiber will then be inserted through it.
8
Employees peel the Innerduct off the reel, readying it for insertion into the ground.
9
This worker check his list, confirming construction is progressing according to plan.
10
In the background, crews work on excavating new holes; in the foreground, existing utilities are flagged and cones mark where holes have been dug.
11
On-site, Dave Wittwer, president and CEO of TDS Telecom, meets with the construction team, July 21, 2008.
12
For more information, visit: www.tdstelecom.com/monticellofiber www.tdstelecom.com/monticellofiber