Download presentation
Presentation is loading. Please wait.
Published byKelley Watts Modified over 8 years ago
1
Disaster Recovery on Steroids M Kent Linsenmann
2
Introduction Why How Solution Implementation Review
3
Why? No suitable long-term solution has been implemented Audits indentified lack of disaster recovery plan Business continuity requirements getting tighter
4
How? Available site infrastructure Town and desert locations Existing hardware technology at town location
6
Existing Resources Existing fibre cable to site Existing building for computer hardware Existing telephony equipment Existing Hitatchi SAN Storage (NSC55) Existing Hitatchi Blade Servers
7
Solution Create a site location to mirror town servers and storage Purchase DWDM Switch and Nortel DWDM Cards Upgrade cooling & electrical capabilities Purchase Hitachi universal replication (HUR) and shadow image capabilities
8
Implementation Purchase software and hardware on three year lease Add electrical panel and cooling HVAC Install servers and Array Connect DWDM switches Start Replication services Attach storage to servers for application development
10
Review Replicated 12 TB in12 hours Continuous replication of changes If replication connection fails, all changes are journaled for rapid synchronization
11
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.