Download presentation
Presentation is loading. Please wait.
Published byDaniela Baker Modified over 8 years ago
2
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe TOCK Scientific Secretary:Sami CHEMLI Jean-Philippe TOCK (Alternate) Administrative support:Stefanie Sapountzi
3
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Outline Objective and Scope Mandate & Priority definition Interfaces / Reporting Membership Meetings and organisation Actions 3
4
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Objective and Scope 4 Long Shutdown 2 (LS2) Team José Miguel JIMENEZProject Coordinator Jean-Philippe TOCKProject Office Manager Katy FORAZProject Planning Coordinator Mirko POJERProject PLAN Data Quality Manager Lisette Van Den BOOGAARDProject Finance Officer Thomas OTTOLS2 Safety Support Officer for LHC Ana-Paula BERNARDESLS2 Safety Support Officer for Injectors Stefanie SAPOUNTZILS2 Committee Administrative Support Samy CHEMLILS2 Committee Scientific Secretary
5
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Objective and Scope The LS2 Committee is: THE executive committee dealing with all technical and organisational aspect of the LS2 (2019-20), including EYETS 2016-17 and YETS 2017-18 periods. It includes the accelerators themselves as well and the associated transfer lines and facilities. It covers all activities carried out and resources needed in the context of the LS2 period over the whole CERN accelerator facilities. 5
6
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Objective and Scope It will : Examine and define the safety conditions taking into account co-activities; Monitor all the activities entering in this scope and corresponding schedules (EYETS, YETS, LS2): Closely monitor and continuously optimise the schedule to ensure best use of resources and minimise impact of any unforeseen event. Examine and decide changes of activities and priorities. Follow-up the quality control; It is : THE information channel towards all departments, groups and experiments concerned by the LS2; The place to introduce and assess any new proposal recommended by the LMC or IEFC involving work during the EYETS 2016-17, YETS 2017-18 and LS2 (2019-20). 6
7
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Objective and Scope 7 Long Shutdown 2 (LS2) Project Project Scope & Mandate of LS2 coordinator (1/2) The project scope covers all activities carried out and resources needed in the context of Long Shutdown 2 over the whole CERN accelerator facilities. Long Shutdown 2 “Period” (LS2) EYETS 2016-17 YETS 2017-18 “LS2” 2019-2020
8
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Long Shutdown 2 (LS2) Project Project Scope & Mandate of LS2 coordinator (1/2) The project scope covers all activities carried out and resources needed in the context of Long Shutdown 2 over the whole CERN accelerator facilities. The mandate of the project coordinator includes: Prior to the start of the LS2, the definition of main works to be achieved over the LS2 and of potential options based on priorities given to activities. This study shall highlight in particular LS2 duration and resources needed for each option and be presented to the Directorate by Q3-2016 for final decision; The definition of a CERN-wide “resource-loaded planning”, ensuring the compatibility of resources and planning across the LHC Machine and LHC Experiments; 8 José Miguel Jimenez, LS2 Coordinator
9
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Long Shutdown 2 (LS2) Project Project Scope & Mandate of LS2 coordinator (2/2) The preparation, coordination and follow-up till completion of all LS2 activities in the frame of the LIU, HL-LHC Projects and other CERN approved projects. Work packages will define: The work absolutely essential to achieve the LS2 objectives (activities which will bear a Priority 1-2), which execution will be closely followed up by the LS2 Coordinator; The work which can be postponed to the LS3 (activities which will bear a Priority >2), which impact on LS3 will be assessed by the LS2 Coordinator. The flexibility to use the end-of-year technical stops before and after the LS2 to decrease the load of the LS2 is left at the discretion of the LS2 coordinator and is also part of the scope of the project. 9 José Miguel Jimenez, LS2 Coordinator
10
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Objective and Scope 10 LS1 Post Mortem LS2 Day PLAN is made available PLAN iteration LS2 Day Consolidated List of tasks EYETS to Director A&T LS2 Day Consolidated List of tasks YETS to Director A&T Final validation LS2 LS2 Committee (LSC) Main milestones for 2016: New iteration of PLAN tool EYETS / YETS / LS2 Consolidated list of tasks EYETS to Director A&T LS2 Readiness Review
11
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Long Shutdown 2 (LS2) Project “Priority” definition 1. Safety 2. Activities needed to reach 300fb -1 during run 3 Includes high priorities of the LHC Detectors 3. HL-LHC & LIU projects 4. Approved projects 4a. Approved project if budgeted* Pending Accelerator Consolidation Day Arbitrations for the MTP 2016-2020 5. Approved studies 6. Others 11
12
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Interfaces / Reporting The LS2C reports to the director of the A&T Sector and to the Enlarged Directorate. The LSC shall assess any new proposal recommended by the LMC or IEFC which involves work during LS2 Period in order to decide if this can be incorporated into the overall shutdown schedule and if, as a result, it is necessary to suppress or delay other activities. 12
13
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Membership Proposal: Director of A&T Sector Department Heads and DSOs HSE Unit Head and Group Leaders (or Deputy) CSAP (LHC, SPS and PS) chairpersons Group Leaders (or Deputy) of the A&T sector LHC, SPS and PS complex Coordinators LHC Experiments Technical Coordinators 13
14
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Meetings and organisation In 2016, LS2C will meet monthly (last Friday of the month except today) from 10:00 to 12:00 14 Standard agenda : - Safety (on request) - Reports from projects/facilities (rotation) - Special topics - AOB
15
1 st of April 2016 http://indico.cern.ch/event/ABCDED/ 1 st LS2C Actions Validate the Membership Topics for next meetings (draft) 27/05CMS Pixel readiness 24/06Safety Coordination 29/07Decaling campaign Results from PLAN exercise 30/09Prevessin Computer Farm update Needs for Services (Baracks/chantier) 28/10Feedback LIU-Hilumi on YETS 25/11Last update from LHC Experiments on YETS Propose new topics 15
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.