1 | Project Briefing Bruce Highway Upgrade Caloundra Road Interchange to Sunshine Motorway NCHD-3074 and NCHD-3075 North Coast District | 03 September.

Similar presentations


Presentation on theme: "1 | Project Briefing Bruce Highway Upgrade Caloundra Road Interchange to Sunshine Motorway NCHD-3074 and NCHD-3075 North Coast District | 03 September."— Presentation transcript:

1 1 | Project Briefing Bruce Highway Upgrade Caloundra Road Interchange to Sunshine Motorway NCHD-3074 and NCHD-3075 North Coast District | 03 September 2015

2 2 | Agenda 1.Welcome- District Director ( Doug Wass) 2.Project Overview- Project Director ( Gavin Soward) 3.Project Scope and Procurement- Director Infrastructure Procurement ( Steve How Lum) 4.Questions

3 3 | Our values

4 4 | Diversity and inclusion We have a responsibility to ensure our employee pool reflects and better serves the diverse nature of the Queensland community. Diversity brings different perspectives into the workplace. An inclusive workplace ensures employees feel confident and supported to contribute and participate fully in the workforce. Diverse and inclusive teams: -generate new ideas -challenge the status-quo -introduce fresh ways of looking at problems -offer a wider range of potential solutions.

5 5 | We connect Queenslanders… We get people and industry moving We plan, we invest We deliver, we manage We regulate We help, we educate

6 6 |

7 7 | Project Overview Project Director Gavin Soward

8 8 | Project location

9 9 | Project overview Six laning of Bruce Highway (including corridor planning for eight lanes) between the Caloundra Road and Sunshine Motorway interchanges Upgrades to the Caloundra Road and Sunshine Motorway interchanges to replace the existing at-grade ramp intersections Two lane service road on the western side of the Bruce Highway Rationalisation of existing highway access with upgraded ramp arrangements.

10 10 | Project need AADT 42 000 AADT 63 000 AADT 43 000

11 11 | Project benefits Provides a safer highway network Reduction in delays for vehicles and improved travel times Improves capacity for the Bruce Highway Upgrades existing interchanges Provides an alternative route for local traffic and a cycling route between Steve Irwin Way and Tanawha Tourist Drive, by a new western service road Removes the at-grade Sunshine Motorway westbound connection to the Bruce Highway northbound entry ramp Replaces the existing deteriorated concrete pavement on the Bruce Highway. Posted speed returned to 110km/hr.

12 12 | Funding $1.134 billion Bruce Highway Upgrade Project Caloundra Road to Sunshine Motorway Funded on an 80:20 basis under the Infrastructure Investment Program with the Australian Government contributing $907.2 million and the Queensland Government contributing $226.8 million Estimated construction budget of $500 million (excluding GST).

13 13 | Environment 21 April 2015 - Referred the project to the Department of the Environment (DOE) under the Environmental Protection and Biodiversity Conservation (EPBC) Act 1999 18 May 2015 – DOE deemed the project a controlled action and  issued an information request.  requires an additional public consultation phase.  prepared a recommendation for the federal Minister for the Environment post review of the additional information, public comments to approve with conditions or to not approve the action. The Department of Transport and Main Roads will provide further information during this process.

14 14 | Project Risks Traffic management  Bruce Highway 62,000 (Annual Average Daily Traffic - AADT)  Caloundra Rd 29,000 (AADT)  Sunshine Motorway 39,000 (AADT)  Service roads and commercial vehicles. Design and construction management  Staging  Environment  New bridges and demolition of existing bridges  Geotechnical  Flooding. Stakeholder management.

15 15 | Challenges for proponents Minimising impact on vegetation in the South West corner of Caloundra Road Interchange (CRI) through Beerwah State Forest Traffic management during construction Improved access for the tourist precinct.

16 16 | Caloundra Road Interchange

17 17 | Director (Infrastructure Procurement) Steve How Lum

18 18 | Probity A Probity Advisor has been appointed to oversee the tender and procurement process. Mr Greg Edmonds Project Procure 144 Edward Street Brisbane Qld 4001 Tel: 07 3211 0275 Email: g.edmonds@projectprocure.com.au

19 19 | Key Dates 3 September 2015 Release RFP 1 October 2015 Close RFP 30 October 2015 Notify shortlisted tenderers for Stage 1 2 November 2015 Stage 1 commences 14 March 2016 Stage 1 closes July 2016 Contract Award Mid 2020 Construction completed

20 20 | Procurement methodology Benefits of an Early Contractor Involvement (ECI) process: Contribution for Stage One work to unsuccessful tenderer Interactive process Develop innovative solutions Knowledge of risks and the project Competition Early engagement.

21 21 | Tendering Prequalification levels ̶ Constructors R5 / B4 / F-Open ̶ Designers BD3, HE3, HD3, TE3, GE3. Joint Venture (JV) requirements ̶ only undertake work for which they are appropriately prequalified ̶ Three varieties of unincorporated JVs ̶ Prequalification applications ̶ Roles of each of the venturers must be defined.

22 22 | Early contractor involvement Project Briefing Stage One Contracts Stage Two Contract Shortlisting Period Request for Proposal Period Phases 1 and 2Stage 1Stage 2

23 23 | Selection criteria – Stage One Mandatory criteria highlights Prequalification requirements Joint Ventures Code compliance: Building Code 2013 Queensland Code of Practice for the Building and Construction Industry (July 2013) Accredited under the Australian Government Building and Construction WHS accreditation scheme Receipt of notice to tenderers Page limits.

24 24 | Phase One evaluation criteria Written responses Evaluation criteria Proposal format.

25 25 | Phase Two Presentations to the project team Shortlisting to two tenderers.

26 26 | Stage One Two tenderers invited to enter into a Stage One contract Tenderers prepare Stage Two offer The Department will embed senior designers 16 weeks duration.

27 27 | Stage One Weekly design meetings with project team Risk analysis and risk apportionment workshops Variation benchmarking workshops Cost planning workshops Mid-term presentation Final presentation Commercial meetings.

28 28 | Stage Two Workplace Relations Management Plan (WRWP)

29 29 | Procedural matters Queries during the tendering stage directed to bhup-cr2sm@tmr.qld.gov.au Recommend register two email addresses for receipt of Notice to Tenderers (NTT).

30 30 | Summary Issue Request For Proposal (RFP): 3 September 2015 Prequalification levels  Contractor R4/ B4 / F-Open  Designer BD3, GE3, HE3, HD3, TE3 RFP Closing Date: 1:00pm, 1 October 2015 Award two ECI Stage one contracts: 2 November 2015 Award Stage Two contract: July 2016.

31 31 | Questions?