Presentation is loading. Please wait.

Presentation is loading. Please wait.

December 9, 2015. 1)Business cards 2)Open Meeting Laws/Training 3)Q-Storming Questions 4)Other.

Similar presentations


Presentation on theme: "December 9, 2015. 1)Business cards 2)Open Meeting Laws/Training 3)Q-Storming Questions 4)Other."— Presentation transcript:

1 December 9, 2015

2 1)Business cards 2)Open Meeting Laws/Training 3)Q-Storming Questions 4)Other

3 1)Potential County Policy/Standards Updates 2)Transition Plan Updates 3)Self-Evaluation Document and Public Outreach Updates

4 1)Should the width of detectable warning surfaces be allowed to be included in the required clear width of pedestrian access routes?

5 Image borrowed from detectable-warning.com Clear Width

6 Image borrowed from alerttile.com Clear Width??

7

8 Identify locations of all APS units Need to field verify the clear space areas in front/beside APS Complete list of fully compliant APS and with compliant clear space

9 128 ST SW Vicinity Transition Plan Upgrades Project Construction begins 11/16/15 Construction sequence: NE  NW  SW  SE One quadrant under construction at any given time Working with contractor to maintain ADA compliant pedestrian traffic control Critical path delays (due to weather)

10 128 ST SW Vicinity Transition Plan Upgrades Project

11

12

13

14

15 We have not waited until the plan is done to start removing barriers. We’re proposing projects for 2016 and 2017 that will likely be high on any plan list. Removal of barriers at traffic signals is a high priority (advance walk but no APS even higher). It’s a win-win if we can leverage high priority projects with planned overlay projects.

16 Intersection APS / Curb Ramp Work OverlayScopeFunding 35 AVE SE @ 110 ST SE2016 APS Conduit & Foundations, Curb RampsOverlay / ADA Transition Upgrades 35 AVE SE @ 116 ST SE2016 APS Conduit & Foundations, Curb RampsOverlay / ADA Transition Upgrades 39 AVE SE @ 212 ST SE2016 APS Conduit & Foundations, Curb RampsOverlay / ADA Transition Upgrades 4 AVE W @ 108 ST SW20162018Full APS Installation & Curb RampsADA Transition Upgrades 4 AVE W @ 116 PL SW20162018Full APS Installation & Curb RampsADA Transition Upgrades 4 AVE W @ Center RD20162018Full APS Installation & Curb RampsADA Transition Upgrades 4 AVE W @ 120 ST SW20162018Full APS Installation & Curb RampsADA Transition Upgrades 4 AVE W @ Mariner Square20162018Full APS Installation & Curb RampsADA Transition Upgrades 4 AVE W @ Mariner Park & Ride20162018Full APS Installation & Curb RampsADA Transition Upgrades 148 ST SW @ 35 AVE W20172018Full APS Installation & Curb RampsADA Transition Upgrades 164 ST SW @ Alderwood Mall Pkwy2017N/AFull APS Installation & Curb RampsADA Transition Upgrades 35 AVE SE @ 110 ST SE20172016APS Poles, Pushbuttons, & WiringADA Transition Upgrades 35 AVE SE @ 116 ST SE20172016APS Poles, Pushbuttons, & WiringADA Transition Upgrades 39 AVE SE @ 212 ST SE20172016APS Poles, Pushbuttons, & WiringADA Transition Upgrades 4 AVE W @ 112 ST SW20172018Full APS Installation & Curb RampsADA Transition Upgrades 4 AVE W @ 124 ST SW20172018Full APS Installation & Curb RampsADA Transition Upgrades Beverly Park RD @ Shelby RD2017N/AFull APS Installation & Curb RampsADA Transition Upgrades Marine DR @ 27 AVE NE20172018Full APS Installation & Curb RampsADA Transition Upgrades S:\TES\PROPLNG\ADA\(3) Citizen Input and Public Involvement\3.2 ADAPROW Citizen Advisory Committee\Meeting Materials\ADAPROW Meeting Materials 2015_12_09

17 Content is set but graphics and format still need work. The Committee members will receive a link to an electronic copy for review on December 16th. Committee members can review as they wish (detailed or high-level), but reviews / comments need to be complete by January 12 th.

18

19

20 S:\TES\PROPLNG\ADA\(2) Self-Evaluation and Transition Plan\2.3 Self Evaluation The document is written to accommodate multiple audiences / levels of interest. The report provides a high-level overview. The appendices provide the nitty-gritty details. Let’s look at the report outline together.

21 Partnership with University of Washington / Northwest ADA Center

22 Public Outreach Goals and Objectives


Download ppt "December 9, 2015. 1)Business cards 2)Open Meeting Laws/Training 3)Q-Storming Questions 4)Other."

Similar presentations


Ads by Google