Download presentation
Presentation is loading. Please wait.
Published byArron Morrison Modified over 8 years ago
1
Walking / Working Surfaces Line crossings, stairs, walkways, and workspaces are clear and unobstructed. Pedestrian aisles are clearly marked and clear of obstructions. Work Platforms are in good repair; inclines/declines properly marked. Guardrails in place on working platforms or other floor openings as required. All floor areas free of water, oil, debris, or other potential slip hazards. No hoses, electrical cords, or other equipment on floors in walking areas. Fire Safety / Emergency Equipment Fire extinguisher and hoses properly inspected, not damaged, and accessible. Sprinkler systems free of damage with at least 18” of clearance between sprinklers and material storage. Emergency procedures posted as appropriate on each operator board, team area, etc. Emergency numbers posted on all telephones. Exit doors marked, lighted signs operational, exit path clears of obstructions. Emergency eyewash stations properly inspected, clean and accessible. Verify plant phones have the EMERGENCY sticker on phone.
2
Walking / Working Surfaces Comments: _________________________ Observer’s Name: _________________________ Fire Safety / Emergency Equipment Comments: _________________________ Observer’s Name: _________________________
3
Electrical Safety & Lockout NEW - No Extension Cords >6 foot being used in permanent applications. Electrical panels, conduit, and other equipment in good condition. Identify trash, paper, liquid bottles, combustibles on top of electrical cabinets No loose or exposed wiring. Lockout placards in place on equipment panels, energy source identifiers on control devices, placards legible and properly inspected for current years color. Verify panel doors closed and secured (cannot be opened without tool/key). Verify extension cords are not being overused – could an electrical receptacle be added Verify no daisy chains (extension cord plugged into extension cord plugged into a receptacle). Verify electrical panels are kept clear (36 inches). Verify lockout placard for equipment has had its annual inspection (color coded sticker) Hazardous Materials All containers have either a manufacturers label or plant transfer container label in place. NEW-Label is legible, if hand written, marker has not warn off. Areas that use flammable materials are properly marked, and grounding cables/straps in place as required. Quantities and containers of flammable materials such as aerosols or paint are stored in approved flammable storage cabinets. NEW-No combustible materials inside of flammable cabinet (paper, cardboard, gloves, pig matting, etc.) Verify employees have been trained on the chemicals on their operations (signed operator book).
4
Hazardous Materials Comments: _________________________ Observer’s Name: _________________________ Electrical Safety & Lockout Comments: _________________________ Observer’s Name: _________________________
5
Machinery / Equipment Safe Guards All guards for moving equipment are in place. Operator interface safety devices in their proper position and functioning (mats, light screens, palm buttons, etc. Guarding for robot and automated equipment cells properly secured with nuts/bolts or provided with electrical interlocks. E-stop controls properly identified. NEW – Verify that any pneumatic, hydraulic, chemical, water, etc pipes are properly labeled and have direction of flow. Operator Instructions / Safe Operating Procedures Operator board information is current: Chemical Information PPE requirements Emergency Procedures Employee assigned to job has reviewed and signed off on job requirements on board. NEW – Verify that the teams SOT is current and complete. Safe operating procedures posted for power equipment/fixed tools as required. Drivers: Verify driver is properly wearing seat belt Verify pre-op in completed Verify driver is traveling in proper direction for visibility Verify load is nestled against the back rest when transporting (material should not be transport on tips of forks) Verify material is secured and properly stacked while being transported
6
Operator Instructions / Safe Operating Procedures Comments: _________________________ Observer’s Name: _________________________ Machinery / Equipment Safe Guards Comments: _________________________ Observer’s Name: _________________________
7
Housekeeping and Sanitation Work areas organized and free of trash/debris. Trash and recycling receptacles provided as required. Verify that work benches, work cabinets, electrical panels, parts racks, and other surfaces clean of debris and dust buildup. No obvious leaks or spills / dry floors. HVAC vents appear well maintained. Area restrooms are clean & properly stocked. Hot water is available in sinks and restrooms. Hand & Portable Tools All tools in good repair and in proper locations. Small tool balancers are operational with inspection tags in place Hanging fixtures, tool rails, etc are equipped with safety cables and have been inspected. Portable and fixed ladders and stairs have been inspected and tagged. NEW - Are proper guards in place for rotating tools (either a mutilation socket or a rubber spindle guard)?
8
Hand & Portable Tools Comments: _________________________ Observer’s Name: _________________________ Housekeeping and Sanitation Comments: _________________________ Observer’s Name: _________________________
9
Material Storage / Stacking NEW-Material on pallets on high shelves is banded/wrapped. NEW-All pull out draws are either interlocked, bolted to floor, or braced to prevent tip over. All material storage containers are in good condition and free of visible damage. Material racks stored next to operations or aisles are properly tiered. Material racks that are loaded or unloaded by fork trucks or other mechanical devices are properly anchored. Fork trucks and other mobile equipment has Operator PM completed. Verify material is not double stacked or over 5 feet high along pedestrian aisles Verify material is not protruding into aisles Verify stacked material is stable Verify stated material has at least 18” clearance from any fixed overhead structure Verify material is not blocking doors or electrical panels Attendees
10
Additional Attendees: _________________________ Material Storage / Stacking Comments: _________________________ Observer’s Name: _________________________
11
Name: Name Name: Question Employee Do you understand the safety requirements of your job? (Chemicals, PPE, Tool/Equipment safety) Do you know the location of your group safety information? Verify that employee understands evacuation and take shelter procedures. What was your last safety talk / communication? What do you feel is the most probable injury for your group/area? Do you have any safety concerns? Give me an example of a “safe” behavior you observed today. Enhanced Safety Observation Tour Leadership / Employee Observations Name: Name Name: Question Employee Do you understand the safety requirements of your job? (Chemicals, PPE, Tool/Equipment safety) Do you know the location of your group safety information? Verify that employee understands evacuation and take shelter procedures. What was your last safety talk / communication? What do you feel is the most probable injury for your group/area? Do you have any safety concerns? Give me an example of a “safe” behavior you observed today. Enhanced Safety Observation Tour Leadership / Employee Observations
12
Employee Observations Comments: _________________________ Observer’s Name: _________________________ Employee Observations Comments: _________________________ Observer’s Name: _________________________
13
Dock Safety NEW- Verify that trailer wheels are flush with the dock (in back position) Verify that Key Surrender Process is being utilized Verify that two chocks are in place Verify trailer jack-stands are in place and snug to trailer Verify dock lights inside/outside are working properly Verify that the trailer manufacture date is in compliance with the trailer guidelines (10 years) Verify orange crush zone procedures are being followed Cranes & Hoists Do all cranes and hoists in the area have the current inspection tag (orange/green) Are the operator controls clearly defined and legible Do the rail systems have the capacity ratings labeled properly Do the rails have a secondary end stop that has the appropriate safety cable? Are all safety cables to the rail systems in place? If the system has a hook, does it have a safety latch / is it damaged?
14
Dock Safety Comments: _________________________ Observer’s Name: _________________________ Cranes & Hoists Comments: _________________________ Observer’s Name: _________________________
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.