Download presentation
Presentation is loading. Please wait.
Published byCatherine Regina Haynes Modified over 8 years ago
1
What do donors want ? Tamsin Vernon and Yvan Biot Climate Change Adaptation Team 12 April 2007 1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Policy and Research Division
2
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Adaptation: the $ 6 million question(s) … Local manifestations of climate change ? Limits to autonomous adaptation ? What are the options ? Short term: deal with current variability Long term: deal with trend What is it going to cost in addition to aid ?
3
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Climate Risk Assessment 1. Fiduciary risk risk of not achieving intended outcomes 2. Adaptation options Own programmes Development plans of partners (governments, others) 3. Avoid maladaptation 4. What is it going to cost Own programmes Poverty reduction
4
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Mandate G8 – Gleneagles … develop and implement 'best practice' guidelines for screening (…) investments in climate sensitive sectors … … how those risks can best be managed, in consultation with host governments and local communities Stern Review Doing something now will cost less than paying for the damage Draft UK Climate Change Bill International Climate Change Work Programme Cross-departmental DFID’s Third White Paper
5
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA How do we use the results ? Own programmes Retro-fit existing programmes Mainstream adaptation in pipelines Dedicated adaptation programmes Strategic content of country and regional assistance programmes Risk management Advise partners Climate change negotiations UNFCCC – future framework G8, EU CEIF
6
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Where are we ? Pilot Studies (ORCHID) Screening toolOptionsCosts
7
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Timeline Phase 1: Bangladesh, China, India, Kenya Phase 2: Ethiopia, Tanzania, Ghana Preliminary analysis: Summer 07 Draft 1: March 08
8
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA Prerequisites for success Accurate Value for money Maximize economies of scale Minimize transaction costs Share information Develop international standards Work with development partners (governments, donors, others)
9
1 Palace Street, London SW1E 5HE Abercrombie House, Eaglesham Road, East Kilbride, Glasgow G75 8EA A Common Platform ? Exchange information o Tools Set of ? Budget support; sector wide approaches ? o Results Options Costs and benefits from adaptation Develop a standard screening tool o Paris spirit harmonisation, alignment o Multilateral Development Banks o ? OECD ?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.