1
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. The Forum for Turkish-Japanese Business Partnership in Iraq MHI’s Activities in Iraq and Turkey July 5, 2012 Satoshi Uchida
2
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.1 1. Overview of MHI Established in 1884 Number of Employees: 32,494 (As of Mar. 2012) Annual Sales: US$ 35.3 Billion (April, 2011 ~ March, 2012) Power Systems US$12 Billion (34%) Combined Cycle Power Plant Flue Gas Desulfurization Air Conditioning Unit Diesel Generator Printing Machine Conventional Thermal Power Plant Giant Water Park Aircraft H- Ⅱ Rocket Cruise Ship Cable Stayed Bridge Wind Turbine Plant Automated People Mover Nuclear Power Plant
3
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.2 2. MHI Organization (as of January 2012) MHI President MHI President Global Strategic Planning & Operations HQ Global Strategic Planning & Operations HQ Technology & Innovation HQ Technology & Innovation HQ Power Systems HQ Corporate HQ Business Division Power Systems Project Management Division Power Systems Project Management Division Environmental & Chemical Plant Management Division Environmental & Chemical Plant Management Division Plant Engineering Division Plant Construction Division Engineering HQ Satoshi Uchida Senior General Manager Satoshi Uchida Senior General Manager
4
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.3 3 . MHI’s Activities in Iraq Hartha 4x200MW EPC 1982 Kirkuk Gas Compressor Station Basrah Fertilizer Complex Crude Oil Farm & Pileline Farm, Tuba Fertilizer Complex Kohr Al-Zubair
5
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.4 Six months after the contract During Commissioning After the Gulf War Entire destruction 4-1 . MHI’s Activities in Iraq: Hartha Power Plant Power Output Steam Turbine 4 x 200MW Total 800 MW Configuration 4 x Boiler & Steam Turbine Commercial Operation 1982 Hartha Power Plant was the first MHI EPC Project in Iraq. However, during Gulf War, the power plant was severely damaged by bombing strike.
6
© 2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.5 Rehabilitation Approach for Hartha 1st Step 2004 ~ 2006Supplied spare parts according to Hartha’s request through UNDP ※, whose fund was granted by Japan. ※ United Nations Development Programme 2nd Step2009 Jan~MarTrained Iraqi engineers and welders for the erection work at MHI Nagasaki in Japan. 2009 MayShipped Boiler Corner Panels to Hartha P/S. 2010 May Installed and welded Panels by trained engineers and welders. 3rd Step2012 July 2MHI Commercial Mangager visited Basrah Ministry of Electic To investigate Hartha P/S by MHI and EPC engineers ※ 2013Parts and equipment to be manufactured and supplied. 2014Construction work by EPC and MHI TA. ※ ※ subject to security guarantee and MHI’s internal approval. View of Hartha Power Plant 4-2 . MHI’s Activities in Iraq: Hartha Power Plant