Download presentation
Presentation is loading. Please wait.
Published byKimberly Sparks Modified over 8 years ago
1
Public Input Meeting November 13, 2012
2
Meeting Schedule – Open House – 6:00-6:45 pm – Presentation – 6:45-7:15 pm – Open House – 7:15-8:00 pm
3
U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR Engineering, Inc. Corn Island Archaeology Redwing Ecological Services Introductions
4
Describe the intent of this Study Louisville Loop summary Examine potential path types Identify opportunities and constraints Outline future steps of the planning process Meeting Purpose
5
Louisville Loop Summary
6
This Study Will……. Evaluate Routes for a Conceptual Shared-Use Path – National Turnpike at Fairdale Road to Floyds Fork at Bardstown Road – Provide a Recommended Alignment for the Louisville Loop Identify Potential Ecological Restoration Opportunities – Pond Creek Watershed – Floyds Fork Watershed Identify Cultural Resources and Cultural Resource Interpretive Opportunities Identify potential routes for soft-surface trail opportunities Study Purpose
7
A conceptual shared-use path and ecological restoration plan from: Pond Creek Path Terminus at National Turnpike/Fairdale Road to Parklands of Floyds Fork Path Terminus at Bardstown Road Project Overview
8
Path Planning Goals Maximize transportation and recreation function by providing connectivity to neighborhoods, schools, workplaces, commercial districts, and parks. Achieve proper balance between path user experience and cost. Minimize disturbance to environmentally sensitive areas.
9
What Will the Path Look Like? Path Adjacent to RoadwaysPath Within Natural Areas
10
What Will the Path Look Like? Soft Surface Path Bike Lanes with Sidewalk
11
Overall Map- Preliminary Routes
12
Preliminary Route ‘A’
13
Preliminary Route ‘B’
14
Preliminary Route ‘C’
15
Preliminary Soft Surface Route
16
Preliminary Route Summary
17
Habitat Evaluation – Tree canopy age – Dominant native species – Invasive species – Disturbance – Size of habitat block – Restoration potential – T/E species requirements Ecological Resources - Approach
18
Stream Evaluation – Physical dimensions – Channel form – Aquatic habitat – Sedimentation – Bank stability – Riparian corridor – Watershed development – Restoration potential Ecological Resources - Approach
19
Upland Woods Ecological Resources - Existing Natural Habitats Shrub and Glade HabitatOpen Field Riparian Woods
20
Perennial Streams - Wilson Creek, Mud Creek, Fishpool Creek, Pennsylvania Run, Cedar Creek Tributary Streams Lakes – McNeely Lake, Silver Lake, Crystal Lake, Pay lakes Ponds Wetlands – around Wilson Creek and Mud Creek, low-lying depressions Ecological Resources - Existing Aquatic Features
21
Kentucky Glade Cress Ecological Resources - Existing Threatened / Endangered Species Habitat Kirtland’s Snake Louisville Crayfish Eggleston’s Violet
22
In-Stream Structures – Cross Vane Restoration Techniques Stream Restoration Bioengineering – Live Stakes Channel / Bank Reshaping Aquatic Habitat – Pools/Riffles In-Stream Structures – J-Hook
23
Bush Honeysuckle Removal - Before Restoration Techniques Riparian Corridor Restoration Native Tree and Shrub Planting Bush Honeysuckle Removal - After
24
Wilson Creek – invasive control, native plantings, trash cleanup Restoration Opportunities
25
Cedar Creek – invasive control, native plantings, streambank stabilization
26
Next Steps Develop Draft Recommended Alignment – Public Input – Cost Considerations – Safety – User Experience – Connectivity – Right-of-Way Acquisition Develop Final Plan Document – Path Recommendations Recommended alignment for shared-use path and soft-surface path Potential locations for trailheads and other facilities (restrooms, drinking fountains) Development of costs – Ecological resources summary and identification of restoration opportunities – Cultural resources summary and identification of interpretive opportunities
27
Comments from this meeting Public meeting regarding the Preliminary Final Plan (recommended alignment) Future Participation Opportunities winter 2013
28
Questions?
29
SLIDES AFTER THIS ARE NOT IN THE PRESENTATION
30
Enabled through Planning Assistance to States (Section 22 of Water Resources Development Act of 1974) The Planning Assistance States (PAS) Program, permits the Corps to use its technical planning expertise to supplement and support state and Indian tribe efforts to undertake broad, statewide, comprehensive water resources planning. Project Roles Funded annually through Congress 50% federal and 50% local cost share Study Funding
31
Completed Projects – CDC Wayfinding and Signage Master Plan – Louisville Loop Design Guidelines – Southwest Greenways Master Plan – Pond Creek Shared-Use Path and Ecological Restoration Plan Current Projects – Olmsted Parkways Shared-Use Path Design – Ohio River Levee Trail Extension – McNeely Lake Park Master Plan – McNeely Lake Park Access Road and Bicycle and Pedestrian Facilities Scoop on the Loop
32
Challenge: Barriers to Path Circulation Preston Hwy I-265 (Gene Snyder Fwy) and I-65CSX Railroad
33
Challenge: Cost Considerations Bridge Construction Steep TopographyUtility Relocations
34
Challenge: Land Ownership Narrow Road ROWPrivate Property
35
Challenge: Safety Concerns Vehicular TrafficDriveways
36
Challenge: Sensitive Environments Wooded Area in McNeely Park
37
Planned Roadway Projects with Bike Pedestrian Facilities – National Turnpike widening from Fairdale Rd. to S. Park Rd. – Mt. Holly Rd. Widening – Blue Lick Rd. widening from I-265 to Preston Hwy. – Interchange improvements at I-265 and Preston Hwy. – Preston Hwy. intersection improvements at Commerce Crossing/Cooper Chapel Rd. – Cooper Chapel Rd. Section I, II, & III – Beulah Church Rd. widening – Mt. Washington Rd. Section I & II Opportunity: Other Projects in Corridor
38
McNeely Lake Park Roadway Renaissance Zone Development
39
Opportunity: Corridors Utility CorridorsStream Corridors
40
Opportunity: Roadway and Railroad Crossings Gene Snyder Fwy (I-265)CSX Railroad Preston HwyI-65 Overpass
41
Opportunity: Destinations Employment Centers Commercial DistrictsSchools Neighborhoods
42
Opportunity: Destinations McNeely Lake Park Equestrian Facilities Fairmount Falls
43
Opportunity: Scenic Areas Farmland McNeely LakeForested Knobs
44
Opportunity: Cultural Interpretation Farmland McNeely LakeForested Knobs
45
Opportunity: Cultural Interpretation Farmland McNeely LakeForested Knobs
46
Opportunity: Cultural Interpretation Farmland McNeely LakeForested Knobs Pennsylvania Run Church and Cemetery
47
Opportunity: Cultural Interpretation Fishpools Plantation
48
Adjacent Loop Project: Pond Creek Corridor
49
Adjacent Loop Project: Parklands of Floyds Fork
50
Options for Ecological Restoration – Protection – Enhancement – Restoration/Rehabilitation – Creation Ecological Restoration
51
Goals of Restoration – Water Quality Improvements – Habitat – Diversity – Increased functional benefit to the natural and human environments. Ecological Restoration
52
Types of Resources that the Corridor Offers – Stream Corridors (Pond Creek, Floyds Fork, and tributaries – Woodlands – Agriculture and Pastures Next Steps – Path Segment Evaluation – Detailed Review of Alternative Corridors – Ecological Restoration Concept Development Ecological Restoration Pennsylvania Run in McNeely Park
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.