Presentation is loading. Please wait.

Presentation is loading. Please wait.

State and Local Project Planning – GIS is the Key to Success West Virginia GIS 2016 Dr. Yueming Wu, GIS Manager West Virginia DOT Nate Reck, Gov’t Solutions.

Similar presentations


Presentation on theme: "State and Local Project Planning – GIS is the Key to Success West Virginia GIS 2016 Dr. Yueming Wu, GIS Manager West Virginia DOT Nate Reck, Gov’t Solutions."— Presentation transcript:

1 State and Local Project Planning – GIS is the Key to Success West Virginia GIS 2016 Dr. Yueming Wu, GIS Manager West Virginia DOT Nate Reck, Gov’t Solutions Director GeoDecisions

2 Topics/Discussions Statewide Trans. Improvement Plan (STIP) - Efforts at WVDOT MPO/RPO TIP Management - Miami-Dade TIP/LRTP Workflow Management System Integration WVDOT’s Plans Moving Forward Access / Identity Apps Services DesktopWebDevice Server Online Content and Services Portal

3 WVDOT’s STIP Program

4 WVDOT’s STIP What is STIP? - The DOT’s Capital Plan for Projects for the next 6 Years What is WVDOT’s Process? - Manual Handshake Between the MPOs and DOT - Create and send “Cut Sheets” to MPOs for Public Comment - MPO Manages own TIP based on the STIP Current Technology and Shortcomings? - Mainly MS Access and Excel - Soon to be CPMS as part of the overall ERP implementation - STIP Book is created and maps are part of that. Very manual.

5 WVDOT – STIP Project STIP Public Viewer (Phase 1) - Display and Query STIP Projects - Provide Information on the STIP Program - Mobile-Friendly Map Viewer - Summary Reports - Project Info - Funding Streams - Share and Print Maps Powered By:

6 WVDOT – STIP Project STIP Power User Engine (Phase 2) - Design and wireframe power version - Ad-Hoc Search Capabilities - More Financial Information - Dynamic Map Layers and Services - More Powerful GIS Tools - Reporting Engine - Layer Theming on the Fly Powered By:

7 TIP/LRTP Management and Workflows MPO/RPO TIP Management

8 WV’s MPO/RPO TIP/LRTP Process What is TIP and LRTP at the MPO/Local Planning Level? - MPO Manages own TIP based on the STIP - Public comment and involvement, amendments, etc. What is WVDOT’s Role? - TIP, included into STIP, is submitted by WVDOT to FHWA & FTA for approval - Push down projects to the MPO - Most MPOs do not have local funding to do projects outside the STIP from the DOT Current Technology and Shortcomings? - MS Excel - TELUS

9 GeoDecisions Solution for TIP/LRTP Management Powered By:

10 Functions / Tools TIP and LRTP Management - New Project Creations - Amendments - Agency Level Permissions and Control Map Engine for Display/Query Reporting Engine for Analysis and Project Reports Import of DOT Projects Audit Log of Changes/Access Benefit: Time Savings and Paperless!! Powered By:

11 STIP/TIP/LRTP Workflows WVDOT’s Vision

12 WV’s Desired Workflow for STIP Mgmt. Completely Electronic Workflow Solution Between the MPOs and WVDOT - Remove the need to create and send cut sheets and spec sheets - Online commenting and management of the whole lifecycle of a STIP/LRTP project - Push data via one system and data model between all entities - Model it on the workflows in the Online Grants Management System at WVDOT - Checkpoints and Notifications at Each Workflow Step - Look to possibly use Workflow Manager from Esri or another solution

13 Statewide ERP Implementation & Enterprise LRS WVDOT’s System Integration

14 Enterprise LRS is being built at WVDOT 6 95 6 6 773 265 376

15 Esri Roads & Highways Implementation

16 WVDOT’s EPR Project Our Advanced Solution w/ Integrated Systems (wvOASIS) Goals - Replace multiple outdated, stand-alone system w/ one integrated ERP System - Standardize business processes & practices across the state - Facilitate timely access to information for daily business

17 17 Major wvOASIS Components

18 18

19 WVDOT Future ERP System Overview

20 System Integration

21 Path Forward

22 Continue the Development of the Phase 2 Power User Version for Internal Use Develop a Mapping Plugin for the CPMS System that is part of the ERP implementation - To define projects and validate them Pilot a Completely Electronic Workflow Solution with one of the MPOs and WVDOT - Remove the need to create and send cut sheets and spec sheets - Online commenting and management of the whole lifecycle of a STIP/LRTP project

23 Path Forward Mobile Data Collection for Field Surveys of Projects and Photos

24 Questions? Thank You! Dr. Yueming Wu, GIS Manager West Virginia DOT Yueming.Wu@wv.gov Nate Reck, Gov’t Solutions Director GeoDecisions nreck@geodecisions.com


Download ppt "State and Local Project Planning – GIS is the Key to Success West Virginia GIS 2016 Dr. Yueming Wu, GIS Manager West Virginia DOT Nate Reck, Gov’t Solutions."

Similar presentations


Ads by Google