Design II (Final Project – a Capstone) Parish Center Design, Integrating program & form Program Statement: St. Patrick’s Roman Catholic in Mystic, CT is proposing a study of its existing structures and an overall master plan. A driving element of this is the removal and replacement of the Catholic Center, a 1956 structure that no longer functions adequately. This project is to: Create a Site Plan showing your proposed new Catholic Center; Provide Floor Plan and Elevation Designs of your solution; Provide evidence of your design exploration (story board); Present an effective presentation (a massing model is allowed). Project Details: The New Parish Center program is as follows: Final Presentations are Thursday, May12th. Due April 21 st Concept Site Layout Concept Floor Plan(s) Imagery Sketch (vignette) This means pen-sketch style architectural drawings showing your “big idea” and big-picture design solution. Due April 28 th Developed Site Layout Developed Floor Plan(s) Imagery Sketch (vignette) This means new and additional drawings that show reaction to your design exploration and the design “process”. Due May 5 th Blocked-out Final Site Plan Blocked-out Final Floor Plan(s) Blocked-out Final Elevations Blocked Massing Model This means you’ve started your final drawings and have brought plans, sections, and elevations up to pre-finished level. Due May 12 th (Final crits): Final Site Plan, (labeled neatly) Final Floor Plan(s), “ “ Final Elevation Views, “ “ Final Massing Model Story Board ( show design progress! ) Dress well and bring any guests you’d like to have attend. Lobby:Approx. 500 SF (sized for gathering) Men’s:2 toilets (1 HC), 2 urinals, 3 sinks Women’s:3 toilets (1HC), 3 sinks Hall:Approx. 1,200 SF for events Storage:For tables & chairs, size accordingly Office:Director140 SF Office:Assistant Director140 SF Office:Administrative Assistant120 SF Office:Christian Ed Director120 SF Kitchen:Commercial layout400 SF Pantry:Shelving for food etc.250 SF Storage:Cleaning equipment, etc.110 SF Vestibule:For recyclables, trash 50 SF Conference Rm:375 SF Meeting Rm:250 SF Nursery:300 SF Classroom Gr 1&2:250 SF Classroom Gr 3&4:250 SF Classroom Gr 5&6:250 SF Classroom Gr 7&8:250 SF Classroom HS & General:250 SF Youth / Media Rm:200 SF Workroom for Projects:225 SF Storage (class & workroom):100 SF Maintenance Room:100 SF Mechanical Room: (as required)
2
Site Location Mystic Drawbridge St. Patrick’s Catholic Church
3
Street Elevation Existing Parish Catholic Center
4
St. Patrick’s Site Plan Existing Parish Catholic Center (to be replaced) Existing St. Patrick’s Church Total Church Property (you can delete this boundary from the slide)
5
Site Aerial