Download presentation
Presentation is loading. Please wait.
Published byDouglas Stokes Modified over 8 years ago
1
Andy Blue WP3 - Glasgow Update Andy Blue
2
WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today QA –Hybrid bonding program for ABCn130 ATLAS 12 –analysis for v2 /64 bit compilation Shopping List –Needs/Wants…
3
Andy Blue WP3 Meeting 2 nd Module Since Last meeting –FZ1 sensor wire bonded –Received DC-DC converters end of last week (thanks Peter) –Issue with powering Noticed m shunts had not been disabled Also shorting of hybrid power bonds to sensor bonds –Happened on previous sensor –Bonds from Hybrid bonding too high and shorting sensor bonds –Should be fixed by today
4
Andy Blue WP3 Meeting QA – Bonding program Hybrid bonding program –V2 completed for ABCn130 –For now it has the bond numbers in order circling the 4 sides of 1 chip –When first program written by Mike I can update to all 20 chips possibly send round to bonding sites with Glass asic trials? Start Finish
5
Andy Blue WP3 Meeting ATLAS 12 Most of my work has been on analysis code for ALIBAVA CCE testing of ATLAS12 sensors –Code came from Ljubljana Doesn’t seem to “like” V2 style.dat files Or 64 bit compilation –Most issues sorted (modernising variables types in the main) –Began to look at data from Glasgow CCE test set up
6
Andy Blue WP3 Meeting Shopping List Short term (till April) –GPIB cables (bought) –Connecters for ATLAS 12 CCE setup (bought) Long Term –Thermal Shock Chamber ~£32k (commercial option) –Environmental chamber/Chiller ~£12k –Storage Cabinet ~£10k –Refurbished Scroll pump ~ £1.3k –N2/air automatic switchover unit £1k –RC code printer + software £500 * –Inspection microscope £?? * I have a few ideas on how to database parts for the assembly and the ability to track times and positions of scans (as well as links to online information)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.