1 1 Eagle P3 Project Update FasTracks Monitoring Committee Dec. 2, 2014

2 2 Today’s Agenda Design, construction & systems status Commuter rail vehicle Commuter rail maintenance facility East Rail Line Gold Line/NW Rail Structures Olde Town Transit Hub Public Information Efforts Questions Overhead contact system (OCS) is complete near the Denver Airport Station, as well as the track work and most of the platform

3 3 Design, Construction & Systems Design & Construction Civil design work almost 100 percent complete Safety certification of the designs is progressing well Construction is 67 percent complete and on schedule for revenue service in 2016 Last rail of East Line installed on Nov. 24 Systems Energizing testing from the Xcel grid complete at Argo and Sandown substations Crews place ballast along the commuter rail track near the Olde Town Arvada Station

4 4 Commuter Rail Vehicle All 50 car bodies from the base order and the 6 option cars for North Metro were delivered from Hyundai Rotem in Korea to the assembly plant in Philadelphia Remaining 10 cars are being fabricated in South Korea First four cars arrived at Union Station on Nov. 21 Public can view the cars at an open house scheduled Dec. 3- 6 from 11 a.m. to 7 p.m. at Union Station commuter rail platform

5 5 Maintenance Facility Denver has issued temporary certificate of occupancy for building DTO staff have relocated to the facility to prepare for operations and maintenance training Commuter rail vehicles will be stored at the facility starting Dec. 7 The building structure is complete; track and power installation under way

6 6 East Rail Line Station canopies complete at Peoria, underway at 38th/Blake and Central Park Roadway reconstruction underway on Chambers Road, Smith Road reopened to 2-way traffic Installation of glass on 38th/Blake pedestrian bridge starting soon Trackwork completed Nov. 24, overhead wire installation moving westward from Dahlia Workers install canopies on the 38th/Blake Station platform

7 7 Gold Line/NW Rail Crossing and roadway construction complete on Tennyson Street in Arvada OCS pole installation underway along Gold Line Crossing and roadway construction on Olde Wadsworth in Arvada coming in early 2015 64th Avenue bridge to begin soon over BNSF Railway and NW Rail CRT track in Adams County Pedestrian underpass at Westminster Station

8 8 Structures East Rail Line: All 19 bridge structures completed Gold Line: 4 of 7 bridge structures completed; Moffat Flyover Bridge and Kipling freight and commuter rail bridges moving toward completion Northwest Rail: 3 of 6 bridge structures completed; Clear Creek Bridge well under way, Jersey Cutoff begun, 64th Avenue road bridge scheduled to start construction early 2015 Independent Design Check (IDC) being completed 56th Avenue Bridge

9 9 Olde Town Transit Hub Groundbreaking of the transit hub at the Olde Town Arvada Station took place Nov. 13 Arvada taking lead on constructing plaza and 650- space parking and bus transfer structure to open in time for Gold Line revenue service; RTD, Arvada and plaza garage contractor to coordinate on traffic impacts to ensure all businesses will be accessible Track installation and roadway work is well underway at the Olde Town Arvada Station area

10 10 Q3 Public Information Efforts Project tours: 23 tours totaling 385 attendees Website page views: 79,801 Stakeholder contacts: 568 personal touches via phone, email or in-person Printed newsletter distribution: 2,000 English, 500 Spanish Email newsletter distribution: 21,021 Individual notifications by door hanger, flyer or email: 49,736 Business impact mitigation, digital detour mapping to locate businesses Upcoming events: Commuter rail vehicle open house Wed-Sat, 11 a.m. – 7 p.m. CRMF Opening/LEED celebration: Summer 2015 PI team member Christina Zazueta conducts public construction tour of the Gold Line

11 11 DBE/SBE/WIN A track laborer hired in September brings DTP’s project hiring through the WIN Program to a total of 48 participants DBE/SBE commitments have exceeded goals as of October 2014 (see chart) DTP hosted an Appreciation Luncheon for members of the Mentor/Protégé program and personnel from RTD’s Civil Rights office to recognize the hard work each of the mentor/protégé companies has put in during the program Disadvantaged and Small Business Enterprises Through October

12 12 Questions? For more information on RTD’s Eagle P3 Project:www.rtd-fastracks.com/ep3_2