Presentation is loading. Please wait.

Presentation is loading. Please wait.

(TeleSenigallia Pylon) P.I. Elio Paschini Data Manager:Pierluigi Penna CNR ISMAR Ancona PROGETTO BANDIERA RITMARE SP ’SISTEMI OSSERVATIVI‘ - WP3.AZ2.

Similar presentations


Presentation on theme: "(TeleSenigallia Pylon) P.I. Elio Paschini Data Manager:Pierluigi Penna CNR ISMAR Ancona PROGETTO BANDIERA RITMARE SP ’SISTEMI OSSERVATIVI‘ - WP3.AZ2."— Presentation transcript:

1 (TeleSenigallia Pylon) P.I. Elio Paschini Data Manager:Pierluigi Penna CNR ISMAR Ancona PROGETTO BANDIERA RITMARE SP ’SISTEMI OSSERVATIVI‘ - WP3.AZ2

2 Current Status of the Observatory Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015 UBICAZIONE: Senigallia (ANCONA) Operativa dal 1988 Massima profondità: 12 m Distanza dalla costa: -Da Senigallia 2.5 km Lat: 43 45.350 N Lon: 13 12.540 E Datum: WGS84 SITO WEB: rmm.an.ismar.cnr.it PARAMETRI OSSERVATI dal 26/10/2012 STAZIONE METEROLOGICA - Sensori meteo e Parametri misurati  +5m WindSonic 2-axis Gill Wind speed, Gust and direction;  +5m CS109 Campbell Scientific Air Temperature;  (next +5m CS215 Temperature-Relative Humidity) SENSORI OCEANOGRAFICI e parametri misurati  -2m CS450 Campbell Scientific Water Temperature  -2m CS450 Campbell Scientific Water Pressure (Sea Level)  (next -12m Sontek Argonaut XR Acoustic Doppler Current Profiler, Temperature, Pressure)  (next -6m OBS500 Turbidity sensor) MONITORAGGIO SISTEMA DI ACQUISIZIONE  Controllo presenza e livello segnale GPRS  Controllo tensione di carica e temperatura datalogger Sampling interval 20 sec Mean and record 10 min Sending data 1 Hour

3 Current Status of the Observatory Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015

4 Current Status of the Observatory Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015

5 Current Status of the Observatory Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015

6 Current Status of the Observatory Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015

7 Scientific and Technological Results Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015 SITO WEB: rmm.an.ismar.cnr.it

8 Data Management Real Time Sensors/parameters: Wind Speed, WindGust, Wind Direction, Air Temperature, Water Temperature, Water Level (next Water Current profiler 3 cells, Water Temperature, Water level) Data formats availability: MySql, Ascii, NetCDF, next Sos GeoNode (Starter kit GET-IT geonode Ancona ready) Manuals used for quality control: The RITMARE fixed sites network procedures for real-time DATA QC (SP5_WP3_AZ2_UO01_D03) Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015

9 Dissemination COPERNICUS, MyOcean, Jerico (6/2013-5/2015) The RITMARE Italian Fixed-point Observatory Network (IFON) for marine environmental monitoring: a case study (Special Issue - “Proceedings of the 3rd Italian GNOO Conference on operational oceanography, innovative technologies and applications”,submitted) observatory web-site: rmm.an.ismar.cnr.it Workshop Ritmare Sp5-Wp3, Trieste 27-28 October 2015


Download ppt "(TeleSenigallia Pylon) P.I. Elio Paschini Data Manager:Pierluigi Penna CNR ISMAR Ancona PROGETTO BANDIERA RITMARE SP ’SISTEMI OSSERVATIVI‘ - WP3.AZ2."

Similar presentations


Ads by Google