Presentation is loading. Please wait.

Presentation is loading. Please wait.

PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010.

Similar presentations


Presentation on theme: "PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010."— Presentation transcript:

1 PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010

2 Welcome to the presentation of the Draft Master Plan for Pleasant View Park. Agenda  Welcome & Introductions  Review  Parks History  Public Process  Design Workshop Review & Results  Presentation of Draft Master Plan  Phasing & Costs  Next Steps  Public Comment  Comment Form & Plans PLEASANT VIEW PARK DRAFT MASTER PLAN

3 Design Workshop Review and Results

4 PLEASANT VIEW PARK DRAFT MASTER PLAN Design Workshop Review  Guiding Principles  Goal = Consensus  All may not agree 100% but all can support enough to not sabotage.

5 PLEASANT VIEW PARK DRAFT MASTER PLAN Design Workshop Review  Basic Assumptions

6 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work VALUES  Something For Everyone (4 dots)  Safety (3 dots)  Aesthetics (2 dots)  Public (1dot)  Diversity (1dot)  Themed (1dot)

7 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work INTERESTS  Neighborhood – Picnic Areas (7 dots)  Hikers – Thru Trails (5 dots)  Dog Folks – Neat & Contained (5 dots)  Families & Kids – Rec. at Park not HGS (4 dots)  Sports – Established Facilities Needed (4 dots)  Kids – Play (4 dots)

8 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work DESCRIPTIVE WORDS  Water feature – fountain, drinking fountain (7 dots)  Trees (7 dots)  Walking Trails (4 dots)  Multi Use (3 dots)  Relaxing (2 dots)  Meadow-like (2 dots)

9 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work IMPORTANT QUESTIONS  Plan of action  Schedule  Costs  Funding  Safety  Facilities

10 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Blank Plan

11 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 1

12 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 2

13 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 3

14 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 1 Plan

15 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 2 Plan

16 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 3 Plan

17 PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Kid’s Workshop

18 PLEASANT VIEW PARK DRAFT MASTER PLAN

19 Project Phasing Phase 1  Final Design & Construction Drawings  Demolition & Salvage  Grading & Drainage  Create berms & mounds  Walkways  Irrigation  Turf & Trees

20 PLEASANT VIEW PARK DRAFT MASTER PLAN Project Phasing Phase 2 – Completion  Final Design & Construction Drawings  Fence  Gazebo & Restrooms  Tennis & Multi-sport Courts  Backstop  Playground Infrastructure, Equipment & Fall Zone  Park Furnishings  Trees & shrub beds

21 PLEASANT VIEW PARK DRAFT MASTER PLAN

22 Thank you for participating Please: Fill out a Comment Form Make Comments on the master plans provided PLEASANT VIEW PARK DRAFT MASTER PLAN


Download ppt "PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010."

Similar presentations


Ads by Google