Download presentation
Presentation is loading. Please wait.
Published byNorma Bradley Modified over 8 years ago
1
PLEASANT VIEW PARK DRAFT MASTER PLAN Neighborhood Meeting, November 16, 2010
2
Welcome to the presentation of the Draft Master Plan for Pleasant View Park. Agenda Welcome & Introductions Review Parks History Public Process Design Workshop Review & Results Presentation of Draft Master Plan Phasing & Costs Next Steps Public Comment Comment Form & Plans PLEASANT VIEW PARK DRAFT MASTER PLAN
3
Design Workshop Review and Results
4
PLEASANT VIEW PARK DRAFT MASTER PLAN Design Workshop Review Guiding Principles Goal = Consensus All may not agree 100% but all can support enough to not sabotage.
5
PLEASANT VIEW PARK DRAFT MASTER PLAN Design Workshop Review Basic Assumptions
6
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work VALUES Something For Everyone (4 dots) Safety (3 dots) Aesthetics (2 dots) Public (1dot) Diversity (1dot) Themed (1dot)
7
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work INTERESTS Neighborhood – Picnic Areas (7 dots) Hikers – Thru Trails (5 dots) Dog Folks – Neat & Contained (5 dots) Families & Kids – Rec. at Park not HGS (4 dots) Sports – Established Facilities Needed (4 dots) Kids – Play (4 dots)
8
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work DESCRIPTIVE WORDS Water feature – fountain, drinking fountain (7 dots) Trees (7 dots) Walking Trails (4 dots) Multi Use (3 dots) Relaxing (2 dots) Meadow-like (2 dots)
9
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work IMPORTANT QUESTIONS Plan of action Schedule Costs Funding Safety Facilities
10
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Blank Plan
11
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 1
12
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 2
13
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 3
14
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 1 Plan
15
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 2 Plan
16
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Master Plan Concepts Group 3 Plan
17
PLEASANT VIEW PARK DRAFT MASTER PLAN Small Group Work Kid’s Workshop
18
PLEASANT VIEW PARK DRAFT MASTER PLAN
19
Project Phasing Phase 1 Final Design & Construction Drawings Demolition & Salvage Grading & Drainage Create berms & mounds Walkways Irrigation Turf & Trees
20
PLEASANT VIEW PARK DRAFT MASTER PLAN Project Phasing Phase 2 – Completion Final Design & Construction Drawings Fence Gazebo & Restrooms Tennis & Multi-sport Courts Backstop Playground Infrastructure, Equipment & Fall Zone Park Furnishings Trees & shrub beds
21
PLEASANT VIEW PARK DRAFT MASTER PLAN
22
Thank you for participating Please: Fill out a Comment Form Make Comments on the master plans provided PLEASANT VIEW PARK DRAFT MASTER PLAN
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.