Download presentation
Presentation is loading. Please wait.
1
DAY 2 Haifa Abulaiha hmabulaiha@mix.wvu.edu January 13, 2016 1
2
OBJECTIVES COVERED Data Analysis Microsoft Excel. 2
3
DATA ANALYSIS Search using phrases Restrict searches to a specific website: e.g. cs101 site:wvu.edu Restrict searches to a specific file type: e.g. cs101 filetype:pdf Exclude results from a search: e.g. cs101 - site:cs101.wvu.edu Search for images Search for newspaper articles using LexisNexis Academic database. 3
4
4
5
DOWNLOAD DATA AND EXTRACT ZIP FILE CONTENTS Download data files onto your computer. Extract the zip data files to convenient location. You will have the following four files: –coalmined.xml –employment.csv –coalperemployee.xml –forecasts.xml 5
6
CREATE A NEW WORKBOOK AND ADJUST SHEETS Start Microsoft Excel. Create New Microsoft Excel Workbook named Mining.xlsx Rename sheets (right click rename): –Sheet 1 to Coal Mined –A new sheet 2 to Employment. –A new sheet 3 to Coal per Employee. –A new sheet 4 to Forecasts 6
7
IMPORT XML AND CSV DATA Import data files starting at cell A3 or A4 as indicated in the instructions. For XML files: DATA ribbon from other sources From xml data import For CSV files: DATA ribbon from text 7
8
CREATE AND FORMAT TABLES On Coal Mined sheet: 1.Enable total row 2.Change table style On Forecasts Sheet: 1.Enable total row To enable total row: Design tab Total Row To change table style: Design tab Table styles 8
9
CREATE AND FORMAT TABLES On Employment sheet: –Create a table based on cells A3 through K58: Select Cell Range Insert Tab Check my table has header. 9
10
INSERT ROWS AND/OR COLUMNS On the Coal Mined sheet: –Add column to store the 2010 value of the coal mined in each county to the right of existing column M. On the Employment sheet: –Add column to display the production efficiency for each county to the right of existing column K. To Insert A new column: Click on the column Home Tab Cells Insert Insert Table Column to the Right 10
11
ENTER DATA On the Coal Mined sheet: – Enter text in the cells as following: A1: Tons of Coal Mined per County N3: 2010 Value in 2010 c. A60: Minimum A61: Maximum A62: Average A63: Median A64: Correlation 11
12
ENTER DATA On the Employment sheet: – Enter text in the cells as following (Click on the cell): A1: Employment by County b. L3: Production Efficiency c. A59: Total 16. On the Coal per Employee sheet: – Enter text in the cells as following: A1: Tons of Coal Mined per Employee On the Forecasts sheet, – Enter text in the cells as following: A1: Forecasts A3: 2010-2020 Production Rate Change: B3: 0% 12
13
SORT DATA On the Coal Mined sheet: – Sort the data by county in ascending order. To sort data: Click A3 Sort A to Z 13
14
MYITLAB COURSE ID Section 6 and 8 s’ Course ID is: powell50855 14
15
SUBMIT ASSIGNMENTS Submit your file using the Grades and Submissions section of the CS101 website at http://cs101.wvu.edu/tools/.http://cs101.wvu.edu/tools/ 15
16
ASSIGNMENT DUES AssignmentDue MyITLab Lesson AFriday 01/29 Homework # 1Friday 02/05 16
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.