Download presentation
Presentation is loading. Please wait.
Published byBrett Clarke Modified over 8 years ago
1
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK
2
- is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand sq.km, or 0.5% of the whole territory of Russia; - is located on the crossing of highways that run from the North to the South and from the West to the East 2 Chelyabinsk region
3
3 The regional long-term rating is – BB+ According to the national scale - «ruAA+» prognosis - «Stable» (rating agency Standard & Poor's ) Among the Russian Regions: 1 st place as to production of finished steel and macaroni 3d place as to poultry products 4 th place as to production of steel pipes 5 th place as to shipments volume in processing industries 6 th place as to foreign investments 12 th place as to agriculture products volume and retail turnover Economic Potential Of The Chelyabinsk Region The enterprises output 27% of all-Russian steel and roll stock, 10% of steel pipes and 22% of macaroni
4
Information On The Ground Area in “Malaya Sosnovka” Industrial Innovations Park There is no encumbrances or restrictions on the grounds available here. Within the framework of IIP there is no sanitary zone and permanent structures and forest Legal category is «Settlement Area». 4
5
5 Advantages Of The Industrial Innovations Park “Malaya Sosnovka” Close Proximity to the regional centre (the distance of 2 km to the borders of Chelyabinsk) Total Area – 200 Hectares Facilities Availability (Gas, Water/Sewerage, electric energy supply) Federal highway М5 is at the distance of 1 km Railway (Trans-Siberian main) near by – the main adjoins the Park 15 thousand people live within the distance of 5 km, 200 thousand people – 10 km, 800 thousand people – 15 km
6
6 Engineering Facilities «Malaya Sosnovka» Industrial Innovations Park
7
#Resources TypeResources In Use 1.Gas supply17124.Cubic нм a day 2. Water supply/ Sewerage 2059 cubic metres a day/ 1940 cubic metres a day 3.Electric energy supply38 mW 4.Heat supply102.144 gCal a hour Infrastructure Aggregates of «Malaya Sosnovka» Industrial Innovations Park 7
8
Infrastructure Of “Malaya Sosnovka” Industrial Innovations Park Electric Energy Supply 1. from the substation “Asphaltnaya” of 110/10 kW, 2×6,3 МВА, (power transformer will be substituted for 2×25 МВА). Power capacity is 38 mW 2. During the period of construction electric energy supplying will be carried out according to the temporary scheme of 1mW. 8 Gas Supply From Gas Distribution Station-3 through gas pipeline of high pressure (P=0.6 mPa, D700 to Chelyabinsk ). The gas maximal consumption estimate to cover requirementsx of heating and ventilation and hot water supplying (boilers) and technological ones is 17124.2 cubic.hm a hour. The gas high pressure distribution pipe (P=0.6 mPa) is 2,780 m. The necessity to install gas regulating stations in the zones of industrial enterprises will be determined within gas supply designing process by those enterprises.
9
Installations Boilers capacity considering Losses and own requirements Boiler # 1 (for the lots #1, #2)30 mW (25.8 gCal/h) Boiler #2 (for the lots #3, # 4 and # 5)22 mW (18.92 gCal/h) Boiler # 3 (for the lots #6, # 7 and # 8)8,0 mW (6.88 gCal/h) Boiler # 4 (for the lots # 9)31 mW (26.7 gCal/h) Boiler # 5 (for the lots # 10, # 11, # 12, # 13, # 14 and # 15)17.4 mW (14.96 gCal/h) Boiler #6 (for the lots #16, #17 и # 18)11.0 mW (9.5 gCal/h) Installations Measure unit Quantitatve index Sewerage station №2, Q=30-50 cubic m./hpiece1 Automatic Flow Tank D300 Constructionkm2.22.2 Pressure header D200 construction (from SS №2 to SS «Serazak») km1.41.4 Heat Supply Sewerage Infrastructure Of “Malaya Sosnovka” Industrial Innovations Park 9 Water Supply Строительство сетей водоснабжения D200 – 5,2 км
10
10 Danieli – Metallurgical equipment works (agreement for investment cooperation is signed) North Neoplan – auto and bus assembly plant The First Residents in “Malaya Sosnovka” Industrial Innovations park «Russkiy Basalt» L.L.C. – works to output basalt fibre and composite materials based upon them
11
Measures to Support Investors Lots in the Industrial Innovations park with ready-made infrastructure 11 Support in regulating all permissive documentation Start-Up Office for Foreign Investors offers consulting and translation and interpreting services as well as premises and office equipment use free-of- charge Tax deductions for the period of 5 years: ▪ profit tax reduced to 4,5 % points; ▪ property tax reduced to 50% Municipal authorities provide land lease preferences Rendering state guarantees in investment projects
12
Start-Up Office For Foreign Investors Within The Framework Of The Ministry For Economic Development Of Chelyabinsk Region Mail Address: office 609, 159 Kirov str., Chelyabinsk Phone: 007-351-7793083 Fax: 007-351-7793084 E-mail: invest.chel@gmail.com 12
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.