Download presentation
Presentation is loading. Please wait.
Published bySuzan West Modified over 8 years ago
1
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair 20 Jan 2016
2
Outline Recap Participation Document outline proposal Discussions Distributions-Assignments Forward Plans Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM2
3
Recap Gap analysis performed and identified: Cement placement, applications Cementing materials, applications Circumferential coverage envelope Risk categorization and requirements TP&A requirements, monitoring program, decommissioning Areas of interest not well documented: Highly deviated or near horizontal placement HT-HP, Corrosive, or other environments Liner laps and liner hanger types influence Long term zonal isolation requirements 3Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
4
Recap Create industry referenced document for “P&A” Onshore and offshore applications Jan 2016, Austin, Texas Initial kick-off/working meeting for WG05 Outline proposal based on literature review Create leads for each section with members 4Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
5
Participation Chevron BP ConocoPhillips Repsol Southwestern Shell Oxy ExxonMobil Saudi Aramco Baker Hughes Schlumberger Halliburton Cement Testing Equipment Jerry Calvert Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM5
6
Document outline proposal Life cycle approach Currently five (5) “working” sections Section I – Well status and operations Section II – Applications and operating variables Section III – Material consideration for barriers Section IV – Installation and laboratory testing Section V – Evaluation and verification criteria Section VI - Appendix 6Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
7
I. Well status and operations a.Drilling b.Work-over/re-entry c.TP&A/P&A d.Decommissioning e.Risk categorization/management 7Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
8
II. Applications and operating variables a.Formation types (flow zones, hydrocarbons, aquifers) b.Length/positions (risk categorization) c.Temperature and pressure d.Wellbore profile/deviation e.Long term zonal isolation f.Well location (onshore, offshore) g.Radioactive sources 8Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
9
III. Material consideration for barriers a.Cementitious b.Non-cementitious c.Mechanical (packers - all, liner laps, hangers) d.Natural (geo-formations, etc.) e.Environment (corrosive, HT-HP, etc.) 9Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
10
IV. Installation and laboratory testing a.Circumferential coverage (define) b.Wellbore geometry (OH, CH, stubs, liner laps) c.Placement methods/best practices i.Plugs ii.Squeezes d.Placement simulations (software) e.Laboratory testing 10Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
11
V. Evaluation and verification criteria a.Circumferential coverage (success criteria) b.Wireline logs c.Pressure matching d.Physical/mechanical testing e.Hydraulic testing (positive, negative) 11Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
12
Discussions 12Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
13
Distribution-Assignments Based on current outline proposed… Each section to have one “lead” Operator or cementing service company Reporting to chair Collect from participating WG members: information, data, knowledge and points of interest Work with chair: Compile/populate/build out each sub sections 13Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
14
Distribution-Assignments Volunteers I – Well status and operations (?) II – Applications and operating variables (?) III – Material consideration for barriers (?) IV – Installation and laboratory testing (?) V – Evaluation and verification criteria (?) 14Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
15
Forward Plans Conference call with WG leads Re-visit section outline, scope Determine methods for populating sections Begin workgroup operations 15Joe Shine - WG WA - 2015 E&P Summer Std Mtg – SC10 - CSOEM
16
WG Charge “Identify literature and gaps associated with well plugging and abandonment for both offshore and onshore environments. Present findings to serve as foundation to develop a RP” 16Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM
17
17Joe Shine - WG WA - 2015 E&P Summer Std Mtg – SC10 - CSOEM
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.