Download presentation
Presentation is loading. Please wait.
Published byGordon Lamb Modified over 8 years ago
1
WEST DES MOINES LIBRARY ADDITION Team North 2014 2013-2014 Final Presentation Team North The Ace Mentor Program career direction for students in architecture, construction and engineering
2
Architecture career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
3
Overall concept career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
4
Landscape Plan career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
5
Landscape Materials career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
6
Floor Plans 1 st Floor career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
7
Floor Plans 2 nd Floor career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
8
Building Materials career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program Interior Finishes Exterior Finishes
9
Building Section career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
10
Architectural Rendering career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
11
Foundation Deep Foundations Piles 60ft or more into the ground to reach gray clay shale formation Drilled concrete piers and pile caps to match existing career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program picture of 60ft pile
12
Framing into Existing Building 5 inch slab on grade ½ inch expansion joint- roof deck 2 nd floor will need a cantilever with a kicker career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
13
Framing Long span girders, 40 inches deep Cantilever framing to support the study rooms Sloped metal joist and metal roof deck to match existing career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
14
Lighting career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
15
Lighting career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
16
Daylight Harvesting career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
17
Alternative Energy Estimated Output: 30kW Covers lighting electrical load (20kW) plus a little extra Estimated yearly savings of approximately $5000 career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
18
career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
19
career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
20
career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
21
Staging Site Utilization Plan career directions for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
22
Project Budget career directions for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program Total Construction Budget: $3,919,847
23
Project Schedule career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program Total Construction Duration: 0 Months
24
Mock Bid Recap Mock Bid Project Medicap Pharmacy, Urbandale, IA Original Contractor – Edge Construction Team North Estimate 874, 990 (closest estimate to winning bid) Construction Schedule – 4 months career direction for students in architecture, construction and engineering 2013-2014 Final Presentation Team North The Ace Mentor Program
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.