Download presentation
Presentation is loading. Please wait.
Published byTracey Jackson Modified over 8 years ago
1
Employment Re-designations Accommodating more jobs inside the UGB Planning Commission 7.29.13
2
Jobs Vision New Employment Designation New Mixed Use Employment Zone Flexible Zoning
3
Plan Designations
4
Add West 11 th Employment Designation Map
6
Rezoning
8
Staff seeks policy direction from the Planning Commission on the 4 areas, below (see 4 questions on following slide).
9
Rezoning Options 1. R-1 Residential area on Stewart Road Re-zone to E-2 or ?? Now or later? Planning Commission directed staff to work with the property owners to reach a solution to the current plan-zone conflict. 2. South side of West 11 th, Amazon Creek to Garfield Mix of C-2, C-4 and I-2. Re-zone I-2 and C-4 to C-2 or E-2 zone? Planning Commission favored C-2 Community Commercial zone. 3. 5 th Avenue, Chambers, Broadway, and Garfield Area Mix of C-2, C-4, I-2, and Special Chambers C-2. Re-zone I-2 and C-4 to C-2 or E-2 zone? Planning Commission favored C-2 zone on W. 6 th and 7 th Avenues; additional analysis needed on Garfield Street. 4. Heavy Industrial Area (McKinley Street to Seneca, N. of 11th) Re-zone to E-2 Mixed Use Employment now or later? Planning Commission reached no consensus; additional analysis to follow.
10
Employment + Industry Zones Code Amendments to Promote Mixed Use, Office and Manufacturing Employment
11
E-1CampusEmployment
12
Chad Drive
13
Greenhill Technology Park
14
Willow Creek
15
E-1 Campus Employment P ROPOSED C ODE AMENDMENTS 1. Rename E-1 Campus Employment. 2. Liberalize the use list. 3. Remove barriers to employment opportunities. 4. Maintain campus character. 5. Improve residential compatibility. 6. Diversify the suburban business park.
16
E-1 Campus Employment 2. L IBERALIZE THE USE LIST. Examples o Respond to market allow Medical clinics, Office uses outright. o General simplification remove specifics like Healthcare Informatics, allow same use under general use Science & Educational Research Center. o Allow supportive uses gym, day care, restaurant.
17
E-1 Campus Employment 3. A DDRESS B ARRIERS TO E MPLOYMENT O PPORTUNITIES. Examples o Delete note Special Use Limitation 1. 50% of SF must be a single tenant. 50% of SF on ground floor must be industrial use. No more than 50% of SF on ground floor can office or commercial. o Delete “business park” process. Un-mapped zone. Forces coordination among multiple property owners.
18
E-1 Campus Employment 4. M AINTAIN CAMPUS CHARACTER. o Retain 20% landscape area. o Allow outdoor storage with screening. o Large Commercial Facility standards. Does not comply with Large Commercial Facility standards.
19
E-1 Campus Employment L ARGE C OMMERCIAL F ACILITY STANDARDS. Orientation to the Street. 25% transparency at ground level. Articulation; No long, blank walls. Colonnade, Covered entry Weather protection X Parking at side or rear Due to the suburban location, Planning Commission directed staff to allow some parking in the front.
20
E-1 Campus Employment 5. I MPROVE RESIDENTIAL COMPATIBILITY. Examples o Introduce height limit 80 feet ≈ 6 stories o Stepdown transition next to residential zones. o Retain L-3 High Screen Landscape standard. o Parking location to the side and rear.
21
E-1 Campus Employment S TEPDOWN TRANSITION NEXT TO RESIDENTIAL ZONES. Proposed Code text “…in the E-1 and E-2 zones, no portion of a building located within 50 feet of a residential zone shall exceed the maximum building height permitted in the abutting residential zone.”
22
E-1 Campus Employment S TEPDOWN TRANSITION NEXT TO RESIDENTIAL ZONES. Abutting Residential Zone E-1 Campus Employment zone 50-feet stepdown R-1 = 30 feet R-2 = 35 feet
23
E-1 Campus Employment R ETAIN L-3 H IGH S CREEN L ANDSCAPE STANDARD. o Parking location to the side and rear.
24
E-1 Campus Employment P ARKING LOCATION TO THE SIDE AND REAR. Abutting Residential Zone Increased separation + Additional landscaping Due to the suburban location, Planning Commission directed staff to allow some parking between buildings and the street.
25
E-1 Campus Employment 6. D IVERSIFY THE SUBURBAN BUSINESS PARK. o Small-scale retail & restaurant: 2,000 s.f. Planning Commission requested staff reevaluate the small scale retail allowance to allow larger retail establishments. o Comparables:
26
E-2GeneralEmployment
27
W. 11 th Avenue
28
Garfield-Chambers-Whiteaker
29
E-2 General Employment A NEW ZONE FOR A CHANGING ECONOMY. 1. Concept – mix of commercial, industrial and residential uses. 2. Do no harm to existing business. 3. Provide clarity and consistency in standards. 4. Pedestrian friendly and transit supportive.
30
E-2 General Employment 1. C ONCEPT – MIX OF COMMERCIAL, INDUSTRIAL AND RESIDENTIAL USES. Planning Commission approved of the mixed-use concept, but directed staff to provide more flexibility (i.e., greater retail s.f.) along the key transit corridors and arterial roads SVDP Lamb Building
31
E-2 General Employment 2. D O NO HARM TO EXISTING BUSINESS. o Retain C-4 permitted uses. o Retain I-2 permitted uses. o Development standards apply to new construction & redevelopment. o Goal is no non-conforming uses or structures!
32
E-2 General Employment 3. P ROVIDE CLARITY AND CONSISTENCY IN STANDARDS. o Create similar urban form + street face o Replicate existing standards (e.g., C-2) in corridor
33
E-2 General Employment 4. P EDESTRIAN FRIENDLY AND TRANSIT SUPPORTIVE o Parking to side or rear. o Building orientation to the street. o Vertical mixed-use higher bar to entry, employment remains predominant. o Front setbacks analysis is ongoing. Planning Commission expressed concern about 0’ front setback in Commercial zones and potential conflicts caused with EmX or future wider sidewalks. Need larger setbacks.
34
E-2 General Employment P EDESTRIAN FRIENDLY AND TRANSIT SUPPORTIVE. o Revise drive-through standards to balance automotive needs and improved pedestrian access. The drive aisle cannot circle the building. o Along the W. 11 th corridor, TacoTime, Arby’s, Jack in the Box, Home Federal Bank, Hawaiian Time, & SELCO would comply with proposed concept.
35
E-2 General Employment P EDESTRIAN FRIENDLY AND TRANSIT SUPPORTIVE. o Revise drive-through standards.
36
E-2 General Employment
37
E-2 Mixed Employment S TEPDOWN TRANSITION NEXT TO RESIDENTIAL ZONES. Abutting Residential Zone E-2 Mixed Employment zone 50-feet stepdown R-1 = 30 feet R-2 = 35 feet
38
Stakeholders 2 public open houses o West Eugene o Chad Drive News to interested parties & EE List (500pp) 35+ interviews o Private property owners o Commercial real estate brokers o Business owners o Design + development professionals Working Group to Review Code: August Planning Commission: Sept. 16 th work session
39
Employment + Industry Zones Code Amendments to Promote Mixed Use, Office & Manufacturing Employment
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.