Presentation is loading. Please wait.

Presentation is loading. Please wait.

Development of Information System using OOA for Abdulhadi Bohligah Establishment Prepared by: Group # 3 1.Mohammed Al Ashoor 2.Abdullah Bohligah.

Similar presentations


Presentation on theme: "Development of Information System using OOA for Abdulhadi Bohligah Establishment Prepared by: Group # 3 1.Mohammed Al Ashoor 2.Abdullah Bohligah."— Presentation transcript:

1 Development of Information System using OOA for Abdulhadi Bohligah Establishment Prepared by: Group # 3 1.Mohammed Al Ashoor 2.Abdullah Bohligah

2 Introduction This project for Abdulhadi Bohligah Establishment Aims to provide Employee Management System

3 Establishment Background Name: Abdulhadi Bohligah establishment Established: in 1977. Owner: Abdulhadi Bohligah. Location: in Al-Hufuf, Al-Ahsa, Saudi Arabia. Business type: Trading and contracting. No. of branches : two branches. No. of workers: 24 workers.

4 How did we pick this business? This est. is owned by my father The est. is growing and it gets more difficult to manage the employees This System will be very helpful

5 Contact Person My brother: – Name: Hussain Abdulhadi Bohligah – Job: executive manager.

6 Organizational Chart:

7 Phase I: Project Planning Phase 1. Defining the Problem: –all the operation was done manually –Top Manager decides to automate the est. operations starting with Employee IS –Help to manage the operations related to the employees 2.Anticipated Business Benefits: –Reduce Errors caused by their current manual system. –Ease their processes and safe time. –Manage the employees' salary. 3- System Capabilities Keep track with the employees' records Manage the payroll system electronically Performance Evaluation for bonuses or deductions. Be able to handle the increase in the number of employees.

8 Planning Phase WBS:

9 Planning Phase Gantt Chart For the Whole Project :

10 Planning Phase PERT/CPM for the Planning Phase:

11 Planning Phase 4- Confirming Project Feasibility –Economic Feasibility: Developing the system will be relatively costly because the est. doesn’t have an existing system which means purchasing hardware will have the major weight. Other costs : Software and license Training the users Travel Utilities and tools But this won’t be very effective because the system will be relatively small

12 Planning Phase – Technological Feasibility: As in the Economic Feasibility, we need to purchase almost all hardware – Schedule Feasibility: The dead line will be after 6 months from starting the project, which is very suitable for this system – Resource Feasibility: Because of the distance between the est. and our group project, we will face a problem in meeting the users. So we need to be accurate in gathering the info.

13 Planning Phase 5- Staffing the project: The project will be organized between the members of the group project( Mohammed & Abdullah ). 6- Lunching the project: The scope is defined, feasibility, team members and detailed schedule has been developed. We can start with the analysis phase.

14 Phase II: Analysis Phase 1- Gathering information: We get the information needed in two meetings with Mr. Hussain Bohligah. The System should: –Allow the HR employees to enter a data of all employees and for any new employee. –Be able to search for an employee by entering his name or ID. –Allow HR employees to update employees information –Automatically produce a detailed report salary –Automatically produce a vacation message notification to HR The HR Employees: 1.Mr. Hussain Bohligah : the manager 2.Mr. Tariq : an HR employee.

15 Analysis Phase

16 2- Define System Requirements: From the event table: –Creating New Employee –Look up an employee –Update employee info –Produce salary report –vacation announcement 3- Prioritize Requirements:

17 Analysis Phase Models used in the Analysis Phase 1- Class Diagram:

18 Analysis Phase 2. Activity Diagrams: Look Up Employee Creating New Employee

19 Analysis Phase Updating Employee information

20 Analysis Phase Producing a Vacation Message Notification Producing a Detailed Salary Report

21 Analysis Phase 3- Descriptions for Activities:

22 Analysis Phase

23

24 4- SSD: Creating a New Employee

25 Analysis Phase Look Up an Employee

26 Analysis Phase Update Employee Information

27 Thank You for Listening Now, I’ll leave you with Mr. Al Ashoor

28 The Design Phase

29 Design Phase Design the application architecture

30 Design Phase Design the application architecture

31

32 Design Phase Design the user interface

33 Design Phase Design the user interface

34 Design Phase Design the user interface

35 Design Phase Design the user interface

36 Design Phase Design the user interface

37 Design Phase Design the user interface

38 Thank You


Download ppt "Development of Information System using OOA for Abdulhadi Bohligah Establishment Prepared by: Group # 3 1.Mohammed Al Ashoor 2.Abdullah Bohligah."

Similar presentations


Ads by Google