The applications of linear programming in life د. عبدالمنعم عبد الحميد مجاهد بسم الله الرحمن الرحيم
2
The Problem Model Problem Non –linear programming Linear programming
3
Some problems 1-Bank Loan Policy - personal loans, car loans, home loans, farm loans commercial loans. 2-Transportation Model 3-The Assignment Model 4-Land Use and Development
5
Land Use and Development The Birdeyes Real Estate Co. owns 800 acres of prime, but undeveloped, land on a scenic lake in the heart of the Ozark Mountains. In the past, little or no regulation was applied to new developments around the lake. The lake shores are now lined with clustered vacation homes. Because of the lack of sewage service tanks, mostly improperly installed, are in extensive use. Over the years, seepage from the septic tanks has resulted in a severe water pollution problem.
6
To curb further degradation in the quality of water, county officials introduced and approved some stringent ordinances applicable to all future developments. Only single-, double-, and triple-family homes can be constructed, with the single-family homes accounting for at least 50% of the total. To limit the number of septic tanks, minimum lot sizes of 2, 3, and 4 acres are required for single-, double-, and triple-family homes. Recreation areas of 1 acre each must be established at the rate of one area per 200 families. To preserve the ecology of the lake, underground water may not be pumped for house or garden use.
7
The president of Brideyes Real Estate is studying the possibility of developing the company's 800 acres on the lake. The new development will include single-, double-, and triple-family homes
8
The constraints of the problem include Limit on land use. Limit on the requirements for single-family homes relative to other styles. Limit on the requirements for recreation areas. Capital requirement for connecting water service. Limit on peak-period daily water consumption.
12
single-family homes relative to other styles
14
مرحلة حفر الأساسات
15
مرحلة الإنشاءات
16
استكمال الإنشاءات
17
- Connecting water service and water consummation The cost of connecting water service to the area is proportionate to the number of units constructed. However, the county stipulates that a minimum of $100,000 must be collected for the project to be economically feasible. Additionally, the expansion of the water system beyond its present capacity is limited to 200.000 gallons per day during peak periods. The following data summarize the cost of connecting water service as well as the water consumption assuming an average size family: Housing UnitsSingle Doubl e Triple Recreati on Water service cost per unit ($) Water consumption cost per unit (gal/ day) 1000 400 1200 600 1400 840 800 450
18
Housing UnitsSingleDoubleTripleRecreation Water service cost per unit ($) Water consumption cost per unit (gal/ day) 1000 400 1200 600 1400 840 800 450
20
Housing UnitsSingleDoubleTriple Net Return per Unit ($)10,00012,00015,000
21
The mathematical model of the problem
22
The optimal solution
23
مرحلة التسليم
24
النهاية هذا ما أعننا الله عليه فإن أصبت فمن الله سبحانه وتعالى وإن أخطأت فمن نفسى والشيطان وشكراً د. عبد المنعم عبدالحميد مجاهد قسم الرياضيات كلية العلوم بالزلفى