Project Initiation, Selection, and Planning
2
2 “There are two ways for a business to succeed at new projects: doing projects right, and doing the right projects.” R.G. Cooper, S. Edgett, E. Kleinschmidt. 2000. Research and Technology Management. Importance of Project Selection Good project selection makes the later job of running projects much easier. Also, poorly selected projects may be doomed from the start. On average, companies are less good at project selection than they are at project operation.
3
3 Different Approaches to Project Selection There are two fundamentally different approaches to project selection. In the first approach, projects are evaluated individually, and that information is used to make a go / no go decision. In the second approach, project selection is viewed as a portfolio planning problem, and the go /no go decisions for all projects are made simultaneously. The second approach, where possible, is much better, since it controls risk through diversification, utilizes resources more efficiently, and optimizes overall performance. Some hybrid approaches may also be useful.
4
4 Individual Project Selection - Overview 1. Strategic factors Competitive necessity: keep a foothold in the market, not get left behind Market expansion opportunities: not yet profitable, but need to establish a presence Consistency: in line with overall organization’s mission statement Image: potential impact of project on corporate image
5
5 Individual Project Selection - Overview 2. Project portfolio factors Diversification: reduce market and other risks by maintaining a mix of projects Cash flow constraints: balance available cash over time and across projects Resource constraints: plan available resources (facility, personnel) over time
6
6 Analyzing Project Portfolios: Bubble Diagram Expected NPV Prob of Commercial Success High Zero Low High Bubble diagrams are useful for representing a set of projects and visualizing a project portfolio. Shapes Shading Color Size
7
7 Individual Project Selection - Overview 3. Project risk factors Probability of research being successful Probability of development being successful Probability of project success w.r.t. scope Probability of commercial success Overall risk of project Competitors in market and their reactions
8
8 Individual Project Selection - Overview 4. Quantitative factors Payback period Net present value / internal rate of return Expected commercial value Real options Multifactor scoring
9
9 Payback Period Analysis Number of years needed for the project to repay its initial fixed investment. Example: A project costs $100,000 and is expected to save the company $20,000 per year Payback Period = $100,000 / $20,000 = 5 years
10
10 Comments on Payback Period Easy to calculate and explain, and sometimes can be used to achieve a common purpose throughout an organization. Ignores the time value of money, including interest rates and inflation. Ignores money earned after the payback period.
11
11 Net Present Value (NPV) Let F t = net cash flow in period t (t = 0, 1,..., T), where F 0 = initial cash investment at time t = 0 and r = discount rate of return (hurdle rate)
12
12 Internal Rate of Return (IRR) Find a value of r such that NPV is equal to 0 (but this value may not be unique) Example (with T = 2): Find r such that Note that, in a typical project, early cash flows are negative.
13
13 NPV Example Phase I Research and Product Development: $18 million annual research cost for 2 years. Phase II Market Development: $10 million annual expenditure for 2 years to develop marketing and distribution channels. Phase III Sales: All cash flows are after-tax and occur at year's end.
14
14 NPV Example The results of Phase II (available at the end of year 4) identify the product's market potential as indicated below:
15
15 NPV Example YearExpected Cash Flow ($m) 1-18 2 3-10 4 5 10 … 24 10 If the discount rate is 5 percent, the discounted expected cash flow at the end of the 4th year (from years 5 to 24) is $124.62m.
16
16 NPV Example The internal rate of return is 49.12%. Expected cash flows (with sale of product at end of year 4) Cash OutflowCash InflowNPV Year 118.00-18.00/(1+r) Year 218.00-18.00/(1+r) 2 Year 310.00-10.00/(1+r) 3 Year 410.00124.62+114.62/(1+r) 4 This is the discounted value of future sales at the end of year 4
17
17 Criticisms of NPV Analysis Assumes that cash flow forecasts are accurate; ignores the “human bias” effect Does not take into account the possibility that decisions (and therefore cash flows) may adapt to changing circumstances over time Ignores project portfolio issues Use of a single discount rate for the entire project is problematic, since risk is typically reduced as the project evolves
18
18 A Reasonable Practical Approach Since several quantitative measures for evaluating projects, a reasonable procedure is needed for using this information. Many companies use a two step approach that starts with “filtering”. In the first step, project selection is simplified by eliminating projects that fail any of several tests, e.g. a payback period of 5 years or less, or an IRR of 15% or less. In the second step, a smaller set of remaining projects is then studied in greater detail, possibly including the consideration of both quantitative and qualitative factors. This two step approach is simple, efficient and justifiable. How successful this approach is depends greatly on the details, such as how accurately the filters are set. This approach also largely ignores project portfolio issues.
19
19 Expected Commercial Value (ECV) Develop New Product Technical Failure Technical Success Probability = p t Probability = 1 - p t Launch New Product Commercial Failure (with net benefit = 0) Commercial Success (with net benefit = NPV) Probability = p c Probability = 1 - p c Risk class 1Risk class 2 ECV is the expected NPV of the project, calculated by using the probabilities of the various alternatives.
20
20 ECV Example The design of a new product is expected to take 3 years, at a cost of $6m/year There is a.8 probability that the product will be technically feasible If feasible, the product can be launched in year 4 with an estimated cost of $5.5M If launched, the product will be a commercial success with probability 0.6, earning gross revenues of $15M per year for 5 years If it is a commercial failure, then the revenue is only $2M per year for 5 years The discount rate is 10 percent
21
21 ECV Example Discount rate r 1 =10% Discount rate r 2 =10% Research & Product Development Development Succeeds Probability = 0.8 Development Fails Probability = 0.2 Launch New Product One-time cost of $5.5M 3 Years 5 Years Drop Product Annual Cost: $6M Commercial Success Revenue $15M/yr Probability = 0.6 Commercial Failure Revenue $2M/yr Probability = 0.4 No Cost
22
22 ECV Example YearWhat’s Happening Commercial Success Commercial Failure Expected Annual Cash Flow Discounted Cash Flow 1Technical development (6.00)(5.45) 2Technical dev.(6.00)(4.96) 3Technical dev.(6.00)(4.51) 4Product sales$15$23.442.35 5Product sales$15$27.844.87 6Product sales$15$27.844.43 7Product sales$15$27.844.02 8Product sales$15$27.843.66 $M Example calculation:.8[(.6)(15)+(.4)(2)-5.50]+.2(0)=3.44 10% Total = 4.40
23
23 Criticisms of ECV Analysis Using expectation does not capture worst case risk The possibility of changing decisions in the future changes the risk characteristics of the project. Consequently, the use of the same discount rate may be inappropriate. However, it’s not clear what other discount rate should be used.
24
24 Project Selection The Rating Checklist Approach Checklist construction Identify the criteria or the set of requirements Score each project according to how well it does with respect to each criterion. Words such as “ excellent ”, “ good ”, “ poor ”, etc., are usually assigned with numerical values. Garrison Keillor, “ A Prairie Home Companion ” : “ Lake Wobegon, where all the women are strong, all the men good-looking and all the children are above average ”.
25
25 An Example of rating checklist
26
26 The Scoring Approach The built-in assumption in the rating checklist approach is that each criterion is equally weighted. Scoring models extend this approach by assigning a weight to each criterion to indicate its relative importance. 1. Assign a weight w i to criterion i in accordance with its relative importance. 2. A total score is computed for each project j: T j = i w i s ij, where s ij is the rating of project j under criterion i. 3. Projects with low total scores will be eliminated.
27
27 An example of a scoring model for screening projects
28
28 Multifactor Project Scoring Example AttributeScaleWeight Will the project increase market share? unlikely 1 2 3 4 5 likely30% Is new facility needed?yes no (2) (4) 15% Are there safety concerns? likely unsure no (1) (3) (5) 10% Likelihood of successful technical development? unlikely 1 2 3 4 5 likely20% Likelihood of successful commercial development? unlikely 1 2 3 4 5 likely25%
29
29 Multifactor Project Scoring Example To convert various measurement scales to a [0,1] range. LINEAR SCALE: EXPONENTIAL SCALE: Note that the exponential scale places a premium on being “acceptable”, but not on “excellence”.
30
30 Multifactor Project Scoring Example Weight0.300.150.100.200.25Project score (V j ) Attribute#1#2#3#4#5 Project A5Yes (2)Likely (1)42 Project B2No (4)Unsure (3)34 Linear Scale Project A1.000.2500.750.250.550 Project B0.250.750.50 0.750.525 Exponential Scale Project A1.000.640.000.970.640.751 Project B0.640.970.88 0.970.845 Note that the linear scale recommends Project A, whereas the exponential scale recommends Project B.
31
31 The Scoring Approach Various formulas have been proposed for deriving the relative weights. For example, Uniform or equal weights: Given N criteria, the weight for each of them is assigned as w i =1/N. Rank sum weights: If R i is the rank position of criterion i (with 1 as the highest rank) and there are N criteria, then: w i =(N- R i +1)/ k (N- R k +1) Rank reciprocal weights: w i =(1/R i )/ k (1/R k ) Analytic Hierarchy Process (AHP) is a good methodology that computes weights and scores together.
32
32 Project Screening and Selection Project screening by checklist and scoring models Ratings subjective? Project selection by NPV Only concerned with monetary value? Risk? Uncertainty?
33
33 Project selection using decision trees Decision trees are a powerful approach for decision making problems involving sequential decisions and variable outcomes over time. Project selection problem often involves uncertainties about the future. The outcomes of a project may change depending on which future scenario occurs. A decision tree is a graphical method of expressing the alternative actions that are available to the decision maker and the outcomes that may occur by chance.
34
34 Project Selection by Decision Analysis Example - To determine whether a project to automate a manufacturing process should be launched or not. Depending on the extent of success of the project, the performance of the process after the automation project may turn out to be poor, fair, or excellent.
35
35 Decision Tree Representation 1a $27K 1 Automate $27K Don’t automate Poor(0.5)$-90K Fair(0.3)$40K Excel.(0.2)$300K Include operational cost savings, increased revenue from better quality.
36
36 Decision Analysis More about this topic later ….
37
37 Project Selection as a Portfolio Planning Problem A project is a multi-period investment problem. In each time period, the resources that are available, such as a budget to cover the costs of all projects in the portfolio, are limited. If the company is considering many (say 50 or 100) projects, the number of possible combinations of selected projects is huge. In order to select an “optimal” or even good combination, we need a methodology that can quickly and accurately compare all these possible combinations. The only methodology that can achieve this is 0-1 programming, which can be implemented in Excel. Microsoft Project and other project management packages do not provide this capability.
38
38 Project Selection Example Revenue by Year 1 2 3 4 Project A($40) $10$20 Project B($65)($25)($50) Budget Limit $90 $20$40$55 Overall score of Project A:.751 Overall score of Project B:.845 We want to maximize the total overall score, or value delivered, of the portfolio
39
39 0-1 Program for Project Selection Maximize 0.751a + 0.845b Subject to 40a + 65b ≤ 90 (Year 1) -10a + 25b ≤ 20 (Year 2) -20a + 50b ≤ 40 (Year 3) -20a + 50b ≤ 55 (Year 4) a, b = 0 or 1 where a = 1 if project A is selected 0 if not and b similarly.
40
40 A Dynamic Cash Management Model Winston-Salem Development Corporation (WSDC) is trying to complete its investment plans for the next two years. Currently, WSDC has $2,000,000 on hand and available for investment. The following table gives the cash income from previous investments: Income Income $500,000 $400,000 $380,000 6 MONTHS 12 MONTHS 18 MONTHS There are 2 development projects in which WSDC is considering participation along with other non- WSDC investors.
41
41 1. Foster City Development: If WSDC participated at a 100% level, the projected cash flow would be: Income Income $- 1,000,000 $- 700,000 $ 1,800,000 $ 400,000 $ 600,000INITIAL 6 MONTHS 12 MONTHS 18 MONTHS 24 MONTHS In order to participate at the 100% level, WSDC would have to lay out $1,000,000 immediately and $700,000 again in 6 months.
42
42 2. Take over the operation of an old Middle- Income Housing on the condition that certain initial repairs be made. At 100% participation, the cash flow would be: Income Income $- 800,000 $ 500,000 $- 200,000 $- 700,000 $ 2,000,000INITIAL 6 MONTHS 12 MONTHS 18 MONTHS 24 MONTHS WSDC can participate in either project at a level less than 100%. The cash flows would be adjusted proportionally and outside investors would make up the difference.
43
43 Now WSDC must decide how much of the $2,000,000 on hand should be invested in each of the projects and how much should simply be invested in a 6- month CD for the 7% semiannual return. The goal (objective function) is to maximize the cash on hand at the end of 24 months. The decision variables are: F = fractional participation in Foster City project M = fractional participation in Middle-Income Housing project S1 = initial surplus funds to be invested in a 7% CD S2 = 6 mts. surplus funds to be invested in a 7% CD S3 = 12 mts. surplus funds to be invested in a 7%CD S4 = 18 mts. surplus funds to be invested in a 7%CD
44
44 The constraints in this model must say that at the beginning of each of the four 6-month periods: cash invested < cash on hand The first constraint must say: Initial investment < initial funds on hand 1,000,000F + 800,000M + S1 < 2,000,000 Because of the interest paid, S1 becomes 1.07S1 after 6 months, and similarly for S2, S3, and S4: 700,000F + S2 < 500,000M + 1.07S1 + 500,000 200,000M + S3 < 1,800,000F + 1.07S2 + 400,000 700,000M + S4 < 400,000F + 1.07S3 + 380,000 These constraints provide material balance of the cash flows from one time period to another.
45
45 Here is the symbolic model for this LP dynamic cash management model: Max 600,000F + 2,000,000M + 1.07S4 s.t. 1,000,000F + 800,000M + S1 < 2,000,000 700,000F - 500,000M – 1.07S1 + S2 < 500,000 -1,800,000F + 200,000M – 1.07S2 + S3 < 400,000 - 400,000F + 700,000M – 1.07S3 + S4 < 380,000 F < 1 and M < 1 F > 0, M > 0, Si > 0, i = 1,2,3,4
46
46 Here is the optimal solution: Here are the formulas and Solver Parameters:
47
47 Here is the partial Sensitivity Analysis: As can be seen from these results, both investment projects are attractive with WSDC participating fully, and from the Sensitivity Report, the marginal return to WSDCs initial funds is 31% over 24 months.
48
Decision Support for Project Selection Tutorial on Linear Programming with Excel for Project Selection