Presentation is loading. Please wait.

Presentation is loading. Please wait.

Predevelopment Plan Review 167 E. Walnut Street City Council January 24, 2011.

Similar presentations


Presentation on theme: "Predevelopment Plan Review 167 E. Walnut Street City Council January 24, 2011."— Presentation transcript:

1 Predevelopment Plan Review 167 E. Walnut Street City Council January 24, 2011

2 Site Location

3 Project Description Parcel fronts onto intersection of Chestnut Place and Townsend Place; Five-story 72,335 sq. ft. housing project consisting of 100 market-rate residential units with 125 parking stalls over three levels of parking; and Property is owned by Walnut Marengo LLC, easement granted to Metropolitan Transportation Authority (MTA) for maintenance and support for abutting MTA light rail tracks.

4 City-Owned Parcel Abuts site, access from Walnut Street. City-owned parcel is 22,692 sq. ft. Provides vehicle access to MTA’s equipment.

5 Discretionary Reviews

6 Height Variance 60’ 93’ Measurement from lowest point along existing grade Measurement from Walnut Street 60’

7 Bird’s Eye View looking North

8 View from Holly St. Apartments

9 Birds Eye View from 210 Freeway

10 Birds Eye View from Memorial Park

11 Next Steps The following steps will be considered in conjunction with entitlement process: –Project will be reviewed through the Preliminary Design Review process; –Possible sale of city parcel will require City Council approval via the City Surplus Sale process; and –Traffic Analysis will be reviewed by Transportation Department.


Download ppt "Predevelopment Plan Review 167 E. Walnut Street City Council January 24, 2011."

Similar presentations


Ads by Google