Download presentation
Presentation is loading. Please wait.
Published byArline Simmons Modified over 8 years ago
1
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter 3
2
ITE PC v4.0 Chapter 1 2 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Purpose of a Site Survey Documents existing network structure –Shows physical layout to determine if new equipment can be installed Will also help show... –What is already on site –What type of equipment may be needed –Floor plan of structure Determine obvious issues –Unlabeled cables –Poor physical security –Lack of power –Lack of UPS
3
ITE PC v4.0 Chapter 1 3 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Perform a Customer Site Survey What does the technician look for... – Number of hosts or users how many will be added over the next 12 months how many network servers and/or printers are needed – Internet Service and Equipment if upgrading speed, may need to upgrade equipment – Existing network devices type of network equipment installed configurations loaded on devices – Security are additional firewalls needed – Applications VoIP or video conferencing – Wireless or Wired amount of square feet between access points
4
ITE PC v4.0 Chapter 1 4 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Determine the Topologies Physical topology – actual physical layout of devices Logical topology – documents what paths are taken through the network – includes: IP addresses device names – workstations – routers – servers
5
ITE PC v4.0 Chapter 1 5 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Perform a Customer Site Survey Documentation on current hosts and devices Includes: – device name – location – brand and/or model – operating system – IP addressing – connectivity method – security
6
ITE PC v4.0 Chapter 1 6 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Coming up with a Game Plan A good plan will help identify the following: – Strengths – Weaknesses – Opportunities – Threats AKA SWOT
7
ITE PC v4.0 Chapter 1 7 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Phases of the Network Upgrade Requirements Gathering – analyze data from on-site visit to determine network requirements – done by the design team creates Analysis Report Selection and Design – selection of devices & cabling – weaknesses of design are identified and addressed here – creation of a prototype Implementation – overlooked tasks are corrected – constant customer communication is CRITICAL Operation Review and Evaluation
8
ITE PC v4.0 Chapter 1 8 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Examining the Physical Environment Examine existing facilities and existing cabling Find MDF (Main Distribution Facility) – houses network devices – all network cable concentrate here – may also contain POP of ISP Any IDFs? (Intermediate Distribution Facility) – additional wiring closets – connect to MDF
9
ITE PC v4.0 Chapter 1 9 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Cabling Considerations Check cable types needed – STP – UTP – Coaxial – Fiber Check cable specifications – Straight Through – Crossover – Rollover – Serial TIA/EIA 568A/568B standard
10
ITE PC v4.0 Chapter 1 10 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Check Out the Cabling Patch Cable – from PC to wall plate Horizontal cable – from wall plate to IDF Vertical cable – from IDF to MDF Backbone cable – handles major traffic Wiring closet location Cable management system – protects cables/cable runs Cable labeling Electrical
11
ITE PC v4.0 Chapter 1 11 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Purchasing Equipment for the Network Managed services – equipment obtained from ISP through a lease – all updates, maintenance, etc. of equipment are the responsibility of the ISP In-house services – all responsibility falls on the customer
12
ITE PC v4.0 Chapter 1 12 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Selection of Network Devices Selection of LAN devices – hubs could be used with smaller LANs – switches more efficient managed switch – control over individual ports which is better? (one 24 port switch or 2-12 port switches) Selection of a WAN device (router) – fixed or modular expansion? fixed – specific number/type of ports modular – includes expansion slots – breaks up collision and broadcast domains
13
ITE PC v4.0 Chapter 1 13 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Cisco Devices Router – 1841 ISR (Integrated Services Router) – used for medium-sized business – different connectivity options Switch – 2960 switch – used for Fast Ethernet and Gigabit connectivity
14
ITE PC v4.0 Chapter 1 14 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Network Reliability and Availability Reliability – can be achieved by adding redundancy to the network – use of two routers instead of one Five-9’s of availability – network operational 99.999% of time Use of fault tolerance helps to ensure reliability – a network will continue operating properly in the event of a failure – Use of the following devices will help ensure fault tolerance UPS multiple power supplies hot-swappable devices
15
ITE PC v4.0 Chapter 1 15 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public IP Addressing Plan The following devices will need IP addresses – user PCs – servers – printers, IP phones – router LAN interfaces – router WAN (serial interfaces)
16
ITE PC v4.0 Chapter 1 16 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public Summary A site survey including extensive documentation of both physical and logical network information must be performed before a network upgrade can be planned. The five phases of a network upgrade include requirements gathering, selection and design, implementation, operation, and review and evaluation. Structured cabling deals with the placement of cables, location of wiring closets, cable management, and electrical considerations. Cost and expandability are important considerations when planning equipment upgrades.
17
ITE PC v4.0 Chapter 1 17 © 2007 Cisco Systems, Inc. All rights reserved.Cisco Public
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.