Download presentation
Presentation is loading. Please wait.
Published byClinton Morrison Modified over 8 years ago
1
Collaboration With DTTN 30 Aug 2007
2
Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure Connectivity Implementation Schedule 01 Jul 2007 – 31 Dec 2008 Funding Agent Logistics and Supply Chain Management R&D Center
3
Challenges to Meet We target to deal with the following challenges: How can we make the development and maintenance of data mappings easier? How can we make it easier to integrate DTTN with the users’ legacy systems?
4
We Have a Box – B2B Connector, exchanges documents through shared folders The base is built, exchanges documents through shared folders The next challenge is: Building Applications electronic documents Compliance to supported by DTTN Compliance to B2B standards supported by DTTN including ebXML, UBL, and AS2
5
Applications for DTTN
6
Message Conversion Service
7
Message Staging Service
8
More Applications
9
Proposed Next Steps Form a project steering group to Set out project direction Monitor project status Allocate resources Form a joint team to Develop project schedule Confirm requirement on the deliverables Develop pilot cases
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.