ANAB AQMS Accreditation Programs 2007
2
Overall AQMS Accreditations 37 AS9100 6 AS9110 23 AS9120 AQMS Applicants 2 AS9100 8 AS9110 1 AS9120 AQMS Suspensions 1 suspension 3 rd quarter (lifted 4 th quarter) 1 voluntary suspension 2 nd quarter (lifted 3 rd quarter) AQMS Withdrawals None in 2007
3
Complaints Complaints against CB’s and ANAB by type and source can be found at www.anab.org. www.anab.org Summaries for past years (back to 2003) are available
4
Aerospace Complaints against ANAB 2002 - 2007
5
Aerospace Complaints against CBs 2002 - 2007
6
2007 Aerospace Complaints 164 – OASIS not updated in a timely manner Closed with corrective action 169, 171, 183, 184, 186, 197, 205 – CB did not respond in a timely fashion with acceptable corrective actions to an OEM’s NCR’s Closed with corrective action (except 184, 197 & 205) Addressed the OEM NCR’s and put a process in place to handle OEM NCR’s in the future. Open with correction required (closing out NCR’s) (184 & 205) Open with correction required (audits taking place) (197) 190 – AS9100 certified organization is not in conformance to the requirements and just passed an audit by the CB. Closed withdrawn Complainant withdrew the complaint when requested for more information. ANAB followed up and found the CB had not certified the organization yet and the auditors in question had been witnessed and were found competent to conduct AS9100 audits.
7
2007 Aerospace Complaints 192 - An industry stakeholder is concerned about organizations that are certified to AS9100 and do not use English as their preferred language and the AS9100 audits are being done by English speaking auditors. Closed, unable to be substantiated ANAB requested more information and it was not received 223 – A CB went to transfer an AS9100 client and NCR’s from 2006 were not closed and new NCR’s from 2007 were not closed. “Old” CB took the client back and re-issued the cert (without NCR’s being closed and without an 2007 audit) Open under investigation (just received)
8
2007 Aerospace Complaints Investigative witnessed audit – A required audit in response to a complaint alleging nonconformance by a certified organization. ANAB shall outline the expectations to the CB prior to the audit and if the CB does not meet those expectations ANAB shall intervene and facilitate the direction of the audit and if necessary to adequately investigate the allegations the ANAB audit team may pursue audit trails of the organization’s system.
9
2007 Aerospace Complaints ANAB was going to submit a complaint on an auditor to RABQSA Auditor decided to withdrawal his auditor certification; ANAB did not pursue the complaint New IAQG resolution from Oct 2007 Stakeholders to submit complaints to auditor authentication bodies (AAB) if issues with an auditor
10
2007 Aerospace Appeals NCR Appeal from witnessed audit (Nov 2007) NCR 1, major – Not utilizing the checklist NCR 2, major – Organization design responsible? CB appealing NCR 1 CB appealing major category for NCR 2 Conclusion: Downgrade both NCR’s to minor
11
ANAB QMS Internal Audit ANAB conducted six internal audits throughout 2007 21 (3 major) NCR’s issued 6 in regards to corrective action process 2 in regards to preventive action process 5 in regards to non-AS (other industry sectors) assessor records 1 in regards to file review objectives for office assessments (TL, not AQMS) 3 in regards to document control 1 in regards to translators 1 in regards to complaint process 2 in regards to internal audit process
12
AAQG Oversight Audit of ANAB On-site witnessed audit on 26-27 March 2007 Rolls Royce ANAB’s office was audited on 11-12 December 2007 Rolls Royce and Boeing There were 2 minor NCR’s generated Completion of AQMS checklist Closure of NCR’s (without evidence) CA Plans are due 01 Feb 2008
13
ANAB QMS IAF Peer Evaluation ANAB was audited by IAF ANAB QMS on-site witnessed audit ~ May 2006 (witnessed by AAQG) ANAB Office ~ 21-25 August 2006 QMS & EMS ~ does not include industry sectors Conducted by SAC (Singapore AB) and EMA (Mexico AB) 5 [minor] NCR’s issued & 6 Concerns Concerns must be responded to All NCR’s are closed Overall conclusion; ANAB to continue as a IAF MLA signatory
14
ANAB QMS IAF Peer Evaluation Minor NCR’s and Concerns Internal auditor qualification evidence not available Internal NCR’s not closed on-time During on-site assessment assessors did not audit to sufficient depth Certificates for accreditation do not reference accreditation standards (e.g. ISO Guide 62) nor do they reference the accompanying schedule of accreditation CB’s date of accreditation & expiration date not publicly available Not clear how assessors have sufficient knowledge of local regulations (EMS). ANAB’s process for multi-site CB’s is not consistent with ISO 17011 ANAB did not submit an accreditation package to the Council in a timely fashion. An additional office of a CB has the word “consulting” in it’s name. Obligation that CB must provide access to certification documents is not addressed. During on-site assessment assessor classified a major NCR as a minor.
15
AS Office Assessments 41 conducted for 35 CBs 1 CB’s assessment was re-scheduled for Jan 08 (due and scheduled for Dec and was canceled due to weather) 1 CB gained AS accreditation in Oct 07 (office assessment was initial) 4 CB’s had follow-up assessments 1 CB had two assessments in 2007 AS Witnessed Audits 42 conducted for 35 CBs 2 CB had re-audits 4 CB’s had multiple assessments 1 CB gained AS accreditation in Oct 07 and 1 gained AS accreditation in Jun 07 (no annual maintenance witnessed audits required in 2007) 2007 ANAB Assessment Activity
16
NCR’s issued during AQMS Maintenance Witnessed Audits ~ 2005, 2006, 2007 lessons learned from 2005 – certificates, corrective actions, in depth lessons learned from 2006 – audit time, OASIS, auditing in depth
17
WITNESSED AUDIT NCR’s 2007 42 audits 98 NCR’s (2.3 NCR’s per audit) 27 Major 17 Escalated to Major 2006 35 audits 61 NCR’s (1.7 NCR’s per audit) 6 Major 7 Escalated to Major 2005 37 audits 67 NCR’s (1.8 NCR’s per audit) 6 Major 7 Escalated to Major
18
Aerospace NCR’s issued during Office Assessments 2005, 2006, 2007 lessons learned from 2005 – certificates, corrective actions lessons learned from 2006 – audit reports, corrective actions, internal audit not including AS, scoring
19
Office Assessment Aerospace NCR’s 2007 41 assessments 43 NCR’s against aerospace requirements (1.04 NCR’s per assessment) 4 Major 1 Escalated to Major 2006 37 assessments 29 NCR’s against aerospace requirements (.78 NCR’s per assessment) ?? Major ?? Escalated to Major 2005 34 assessments 27 NCR’s against aerospace requirements (.79 NCR’s per assessment) 6 Major 0 Escalated to Major
20
2008 CB/AB Auditor Workshop Research top NCR’s to find detail for training Areas not being audited to sufficient depth Train on industry/AB expectations for specific processes / requirements Audit Report Issues NCR’s (generating / closing) Is it documenting NCR’s or closing out NCR’s?