Patrick MacLeamy, FAIA HOK CEO buildingSMART International Chair
2
Part One Design and Build Diverge
3
Building (n)
4
Building (v)
5
Guilds Built Buildings
8
Brunelleschi Florence Cathedral Dome 1400s Guild Master = Master Builder
9
Architect >>> Builder Christopher Wren St. Paul’s Dome 1600s Guild Master = Master Builder
10
Architect >>> Contractor Architect >>> Builder Thomas U. Walter US Capitol Dome 1800s
11
Architect >>> Contractor Design separated from Build Thomas U. Walter US Capitol Dome 1800s
12
Part Two Buildings are Assembled not Built
13
Auto Assembly – 1900s
14
Window Assembly - Today
15
Today Buildings are Assembled - Not Built
16
AssemblyBuildingPlant
17
To Summarize: 1 Design separated from Build 2 Buildings are Assembled not Built
18
Part Three Reinventing the Building Process
19
organization Information exchange design What is ?
20
organization What is ?
21
Architect Owner Contractor Information Exchange Risk Gap Construction Mgr Insurance Lawyers Traditional Organization
22
organization Architect Owner Contractor Shared Information & Shared Risk / Reward
23
organization Information exchange What is ?
24
StructuralEngineerStructuralEngineer HVACEngineerHVACEngineer CityCity Constr.ManagerConstr.Manager FacilitiesManagerFacilitiesManager BuildingOwnerBuildingOwner CivilEngineerCivilEngineer ArchitectArchitect Traditional Information Exchange StructuralEngineerStructuralEngineer HVACEngineerHVACEngineer CityCity Constr.ManagerConstr.Manager FacilitiesManagerFacilitiesManager BuildingOwnerBuildingOwner CivilEngineerCivilEngineer ArchitectArchitect StructuralEngineerStructuralEngineer HVACEngineerHVACEngineer CityCity Constr.ManagerConstr.Manager FacilitiesManagerFacilitiesManager BuildingOwnerBuildingOwner CivilEngineerCivilEngineer ArchitectArchitect BuildingInformationModel(BIM)BuildingInformationModel(BIM) Information exchange
25
Program Design Through all Phases Documents Construction Operation
26
organization Information exchange design What is ?
27
CDDesignDD Construction Prog Effort Time Traditional Design
28
CDDesignDD Construction Prog Effort Time Traditional Design Ability to cost control of Design Changes Cost
29
Litigation Phase CDDesignDD Construction Prog Effort Time Traditional Design Ability to cost control of Design Changes Cost
30
Design Litigation Phase CDDesignDD Construction Prog Effort Time Ability to cost control of Design Changes Cost
31
Litigation Phase CDDesignDD Construction Prog Effort Time of Design Changes Cost Ability to cost control Design
32
Litigation Phase CDDesignDD Construction Prog Effort Time of Design Changes Cost Ability to cost control Design
33
AssembleOperate BIM BAM BOOM! Benefit Time
34
Australasia Australia New Zealand Asia Singapore China Korea Japan North America United States Canada Europe Italy Portugal Spain Switzerland Germany Finland Sweden NorwayAustria Netherlands Denmark Belgium France Great Britain Ireland Africa S. Africa
35
Goals - Promote efficiency in the building industry - Support open standards for information exchange - Develop a universal data translator
36
organization Information exchange design What is ?
37
Thank you