Presentation is loading. Please wait.

Presentation is loading. Please wait.

Wegmans Commercial Roll Line Shrink Reduction P09712 Project Leads: Levi Stuck Evan DeCotis

Similar presentations


Presentation on theme: "Wegmans Commercial Roll Line Shrink Reduction P09712 Project Leads: Levi Stuck Evan DeCotis"— Presentation transcript:

1 Wegmans Commercial Roll Line Shrink Reduction P09712 Project Leads: Levi Stuck lns1392@rit.edu Evan DeCotis epd4595@rit.edu

2 The Project Waste elimination and process improvement on the hot dog and hamburger roll line 5% to 10% of daily production run is waste Brooks Ave. bakery location 5 person team 22 week time frame

3 Wegmans Awards 2007 Fortune Magazine: #3 Best Company to Work For 2006: #2 2005: #1 2004: #9 2003: #10 Size/Location 72 Stores 1 Bakery 18 in Rochester Area 12 in Pennsylvania 11 in Buffalo Area 9 in Syracuse 7 in New Jersey 6 in Finger Lakes 4 in the Southern Tier 4 in Virginia 1 in Maryland

4 Why Project P09712? Obvious visual progress Easy access to information Customer support Feasible Hands on Limited restriction High responsibility High product connectivity Foot in the door Process not a product Close to home Large scale It’s food! How its Made TV Easy to make a difference Applicable skill set Quick results Cheap Solutions “Real life” experience Cost-benefit budget Resume addition Knowledgeable team High project support Guaranteed satisfaction Twice the opportunity for solution implementation Challenging

5 Obvious Visual Progress Waste bin emptied 4 times a day Precise monetary savings with finished product defect reduction Project progress = less bin waste

6 Product Connectivity

7 Knowledgeable Team RIT engineering Required skills provided Access to project support High accessibility to important information

8 Feasible Not simple but absolutely doable “Why P09712” list High accessibility to necessary information, resources, materials and support, all combined with team eagerness Make a dent in the huge defect rate

9 The Commercial Roll Line Shrink Reduction Project will be a Success with Your Help!


Download ppt "Wegmans Commercial Roll Line Shrink Reduction P09712 Project Leads: Levi Stuck Evan DeCotis"

Similar presentations


Ads by Google