1
Measures of ecological patency on River Lieser and Moselle
2
Structure Project at river “Lieser“ Conversion of weirs – Fish pass – Rock ramp Barrage near “Koblenz“ Reason for water management Water management office – Fields of activity
3
Project at river “Lieser“ “Lieser“ – 74 km long – flows into “Mosel“ project – conversion or removal of 16 weirs – building of fish passes and rock ramps
4
Field trip to the River Lieser in cooperation with the Water Management Authorities of Rhineland-Palatinate Along the River Lieser there were 15 barrages (weirs) to supply water energy to the mills fish and other aquatic organisms could not move upstream.
5
Weir before conversion weir 50 m long 2.20 m high inefficient fish pass 5 m long
6
Construction of fish pass fish pass 42.50 m long 17 small dams of regular length fall step between dams 10 cm series of small dams
7
After conversion with fish pass
8
Weir before conversion 1.70 m
9
Construction of rock ramp rock ramp – 47 m long – large rocks (2.50 t) – system of rocks (so they don´t move in case of floodings)
10
After conversion
11
The barrage near “Koblenz“ 3 locks hydroelectric power plant fish pass “Mosel“
12
Fish pass
13
Water is a precious resource Water shortage exist -> water management needed Water management involves principles for the careful use of water – protection and pollution control in all waters – maintenance and improvement of the ecological condition of streams and rivers – sustainable use of water resources
14
Water management office Main tasks: – Water management planning – Supervision of waters – Administration of public water resources – Promotion of water management – Preparation of expert reports on the following: water supply, wastewater disposal, water protection, river control, industrial pollution control