2
Storage Activities Nov. 2012 1
3
Preparation for transportation of Turbines 2
4
handing over Gas Turbine unit 22 3
5
handing over Generator unit 21 4
6
Preparation for transportation of Turbines 5
7
handing over Generator unit 23 6
8
7
9
8
10
loading turbines GT24 & Generator GT23 on from MOE stores to site 9
11
10
12
loading turbines GT24 & Generator GT23 on from MOE stores to site 11
13
loading turbines GT24 & Generator GT23 on from MOE stores to site 12
14
loading turbines GT24 & Generator GT23 on from MOE stores to site 13
15
loading turbines GT24 & Generator GT23 on from MOE stores to site 14
16
loading turbines GT24 & Generator GT23 on from MOE stores to site 15
17
handing over the stands for GT’s and GEN’s 16
18
handing over the stands for GT’s and GEN’s 17
19
loading turbines GT24 & Generator GT23 on from MOE stores to site 18
20
loading turbines GT24 & Generator GT23 on from MOE stores to site 19
21
Accomplishment moving GT21 & GT 22 from storage close to foundation at site 20
22
Accomplishment moving GT21 & GT 22 from storage close to foundation at site 21
23
Accomplishment moving GT21 & GT 22 from storage close to foundation at site 22
24
Accomplishment moving GT21 & GT 22 from storage close to foundation at site 23
25
Accomplishment moving GT23 & GT 24 from storage close to foundation at site 24
26
Accomplishment moving GT23 & GT 24 from storage close to foundation at site 25
27
Accomplishment moving GT23 & GT 24 from storage close to foundation at site 26
28
Accomplishment moving GT23 & GT 24 from storage close to foundation at site 27
29
Accomplishment moving GT23 & GT 24 from storage close to foundation at site 28
30
Inventory and visual inspection for the load coupling and handling tool of GT-21 29
31
Inventory and visual inspection for the load coupling and handling tool of GT-21 30
32
Inventory and visual inspection for the load coupling and handling tool of GT-21 31
33
Inventory and visual inspection for the load coupling and handling tool of GT-21 32
34
Inventory and visual inspection for the load coupling and handling tool of GT-21 33
35
Inventory and visual inspection for the load coupling and handling tool of GT- 21 34
36
Inventory and visual inspection for the load coupling and handling tool of GT-21 35
37
Inventory and visual inspection for the load coupling and handling tool of GT-21 36
38
Inventory and visual inspection for the load coupling and handling tool of GT-21 37
39
Preparation For install diffuser GT-21 38
40
Preparation For install diffuser GT-21 39
41
Preparation For install diffuser GT-21 40
42
Preparation & inventory For install diffuser GT-21 41
43
Inventory and inspection for rigid load coupling ( GT21 ) 42
44
Inventory and inspection for rigid load coupling ( GT21 ) 43
45
Inventory and inspection for COUPLING SHAFT HANDLING TOOL 44
46
Inventory and inspection for COUPLING SHAFT HANDLING TOOL 45
47
Inventory and inspection for Expansion Joint ( GT22 ) 46
48
Inventory and inspection for Expansion Joint ( GT22 ) 47
49
Inventory and inspection for Expansion Joint ( GT22 ) 48
50
Inventory and inspection for Expansion Joint ( GT22 ) 49
51
Handing over lifting beam 50
52
Receiving wooden Cubic's for heavy lifting from local market 51
53
Receiving wooden Cubic's for heavy lifting from local market 52
54
inspection for Damaged materials with GE representative 53
55
inspection for Damaged materials with GE representative 54
56
inspection for Damaged materials with GE representative 55
57
inspection for Damaged materials with GE representative 56
58
inspection for Damaged materials with GE representative 57
59
inspection for Damaged materials with GE representative 58
60
inspection for Expired date chemical materials with GE representative 59
61
inspection for Expired date chemical materials with GE representative 60
62
Handing over Expansion joint boxes 61
63
Handing over Expansion joint boxes 62
64
Handing over Expansion joint boxes 63
65
Handing over Expansion joint boxes 64
66
inspection for Damaged materials and chemical materials with GE representative 65
67
inspection for Damaged materials and chemical materials with GE representative 66
68
inspection for Damaged materials 67
69
inventory and inspection for cable trays boxes GT21 68
70
inventory and inspection for cable trays boxes GT21 69
71
Handing over Diffuser GT21 70
72
Handing over Diffuser GT21 71
73
Handing over Diffuser GT23 72
74
Handing over Diffuser GT24 73
75
Handing over Diffuser GT24 74
76
Receiving ninth box of Missing parts from transportation company 75
77
Receiving ninth box of Missing parts from transportation company 76
78
Handing over load coupling GT21 77
79
Handing over load coupling GT24 78
80
Handing over hardware for load coupling GT21 + GT24 79
81
Inventory and inspection for cable trays boxes 80
82
Inventory and inspection for cable trays boxes 81
83
Inventory and inspection for cable trays boxes 82
84
Inventory shims 83
85
Inventory shims 84
86
Inventory shims 85
87
Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 86
88
Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 87
89
Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 88
90
Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 89
91
Receiving the Gas Turbine Containers GT21 + GT22 + GT23 + GT24 from MOE Store to Baghdad Store 90
92
91 Arrived missing Materials on 20/11/2012
93
92
94
93
95
94
96
95
97
96
98
97
99
98
100
99
101
100
102
101
103
102
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.