Data Center Infrastructure Total System Effectiveness Matt Gleason, CoreSite Jim Hughes, Mitsubishi Electrical Power Products
2
CoreSite | Who We Are 2 NYSE traded with a strong balance sheet Scalable, broad platform in Tier-1 markets Dense network connectivity and ecosystems Product, services and operational excellence Founded in 2001 by The Carlyle Group NYSE: COR (2010); REIT status Equity market cap $1.1 billion Growth capacity 11% debt to enterprise value at 9/30/12 14 data centers 9 top North American data center markets located in network, financial, cloud and commerce hubs Global expansion available through alliance network 2+ million square feet Ability to nearly double data center footprint 300+ employees Over 275 network deployments Over 750 customers and 15,000 cross- connects Key ecosystems of customers and partners consisting of 30% service providers, 21% cloud, 49% content and enterprise Global alliances offering reach to EMEA, AsiaPac, and LatAm markets Cabinet, standard or custom cage, computer rooms, full building XCs, Any2 Internet exchange, Cloud Exchange – Ethernet Breakered and metered power Partner enabled value- added services
3
Nine markets – leading network, cloud, financial and commercial hubs Highly Scalable Data Center Platform 3 Los Angeles San Francisco Bay Area Northern Virginia Washington, DC Boston Chicago New Jersey New York Miami Denver
4
99.9999% UPTIME TIER III INFRASTRUCTURE LEED GOLD CERTIFIED BY USGBC ENERGY STAR RATED ENERGY INNOVATOR AWARD SSAE 16 TYPE 2 COMPLIANCE 24 HOUR CoreSite Commitment to Quality 4 DATA CENTER MONITORING OPERATIONS SUPPORT CENTER
5
Santa Clara Project Goals – Conceptual Minimize initial infrastructure costs Minimize footprint Minimize operating costs Minimize time-to-completion Maximize flexibility Maximize reliability 5
6
Santa Clara Project Goals – Tangible Install and test base infrastructure equipment in less than 90 days from time of order Achieve 99.9999% uptime Create configurations that can quickly adapt to N+1 or 2N Reach PUE of 1.35 regardless of the load at the facility Reduce initial costs and operating costs from our previous designs 6
7
Santa Clara Project Results Data centers are ready for customers 90 days from time of order Interconnecting installation time reduced from 2 weeks to 2 days for 1.5 MW UPS PUE of 1.35 achieved 5 year TCO reduced by $273K per 1.5 MW of Critical Load Design Customers have a choice of N+1 or 2N power 7
8
Confidential UPS Power
9
Confidential UPS Power Start with the UPS 9900B-500kVA UPS 3X500 kVA capacity system expandable to a 4X500 kVA redundant system True On-Line Double Conversion UPS system 1.1 : 1 generator compatibility ratio Proven design in the industry with excellent specifications and reliability factors Energy Star Certified
10
Confidential UPS Efficiency Start with the UPS 9900B-500kVA UPS - efficiency
11
Confidential UPS Batteries Batteries Eastpenn HR7500 Front terminal VRLA design (2) strings to provide 5 minute runtime at full load Compact design using high quality battery cabinets Batteries tank formed to reduce warranty claims and increase reliability Include battery monitoring and IFC 608 Compliance
12
Confidential UPS Power Batteries
13
Confidential UPS Switchboards Switchboards Uses Square D breakers Designed by Mitsubishi with assistance from factory engineering UL891 listed Includes: Input switchboard, bypass input switchboard, UPS isolation breakers, 2 breaker bypass and output distribution
14
Confidential UPS : Small Footprint Next step – Lineup To minimize footprint, the UPS will be installed back to back with the switchboard Benefits Installation time is reduced
15
Confidential UPS: Final Results
16
Confidential UPS Power
17
Confidential UPS Power
18
Confidential Success: TCO Results MegaPOD®
19
Confidential Successful Outcome Results MegaPOD® installed in 2 days versus 2 weeks with the previous design 5 year TCO reduced by $273,334 Initial costs reduced by $93,607 Operating costs reduced by $179,730 Other Benefits Smaller footprint Less Heat Rejection 1.1:1 Generator compatibility
20
Confidential UPS Power-Next Generation Next step – Lineup – Second Generation
21
Confidential Thank You