Past Present Future The High Energy Frontier R.-D. Heuer, CERN Joint EPS-ECFA meeting, July 18, 2009
2
Courtesy Peter Reid
3
“Discovery” of Standard Model through synergy of hadron - hadron colliders (e.g. Tevatron) lepton - hadron colliders (HERA) lepton - lepton colliders (e.g. LEP) Past few decades
4
possible due to precision measurements known higher order electroweak corrections LEP Test of the SM at the Level of Quantum Fluctuations indirect determination of the top mass prediction of the range for theHiggs mass
5
Today’s knowledge: only through combination of results from different accelerator types in particular: Lepton and Hadron Collider together with highly developed theoretical calculations Time evolution of experimental limits on the Higgs boson mass Synergy of colliders M H between 114 and ~200 GeV LEP,SLD, Tevatron… indirect direct top
6
origin of mass/matter or origin of electroweak symmetry breaking unification of forces fundamental symmetry of forces and matter unification of quantum physics and general relativity number of space/time dimensions what is dark matter what is dark energy Key Questions of Particle Physics today addressable at the energy frontier first step: LHC
7
LHC but it will take time...
8
1.Is there a Higgs? 2.What is the Higgs mass? 3.Is the Higgs a SM-like weak doublet? 4.Is the Higgs elementary or composite? 5.Is the stability of M W / M P explained by a symmetry or dynamical principle? 6.Is supersymmetry effective at the weak scale? 7.Will we discover DM at the LHC? 8.Are there extra dimensions? Are there new strong forces? 9.Are there totally unexpected phenomena? 10.What is the mechanism of EW breaking? Standard Nearly Standard Not at all Standard Initial phase of LHC will tell which way nature wants us to go Restart of the LHC: November this year
9
Initial Phase of LHC will tell the way to go Possible ways beyond LHC hadron - hadron collider (sLHC / DLHC) lepton - lepton collider (ILC / CLIC) lepton - hadron collider (LHeC) The next decades
10
sLHCL~10 35 one possible way : luminosity upgrade The European Strategy for particle physics 10
11
Two Phase Luminosity Upgrade: gradually increase performance of LHC, i.e. towards luminosity upgrade (L~10 35 ) sLHC: - New inner triplet -> towards L~2*10 34 - New Linac (Linac4) -> towards L~4*10 34 construction started earliest implementation~ 2013/14 - New PS (PS2 with double circumference) - Superconducting Proton Linac (SPL) start design now, ready for decision ~ 2012 aimed for L~10 35 if physics requires - Detector R&D Important: international collaboration 11 sLHC
12
~2009 2011 2013 // arbitrary scale sLHC: extending the physics potential of the LHC
13
Higgs Couplings
14
Supersymmetry
15
Detector R&D for sLHC mandatory Concerted efforts have started
16
The European Strategy for particle physics
17
ILC Baseline Design 250 250 Gev e+ e- Linear Collider Energy 250 Gev x 250 GeV # of RF units 560 # of cryomodules 1680 # of 9-cell cavities 14560 2 Detectors push-pull 2 10 34 peak luminosity 5 Hz rep rate, 1000 -> 6000 bunches IP : x 350 – 620 nm; y 3.5 – 9.0 nm Total power ~230 MW
18
FALC July 09 Mike Harrison Global Design Effort Toward Industrialization Global status of IndustriesGlobal status of Industries –Research Instruments and Zanon in Europe –AES, Niowave, PAVAC in Americas –MHI in Asia Industrial Capacity: status and scopeIndustrial Capacity: status and scope –No company currently has required ILC capacity –Understand what is needed (and cost) by 2012 Project Scope Euro XFEL~8002 years~1 cavity / day Project X~4003 years~2 cavities/ week ILC~15,5004 years~20 cavities / day ( 3 regions ~7 cavities / day) Call for ender out
19
FALC July 09 Mike Harrison Global Design Effort GDE Timeline Design studies 20092010 New value cost estimate R&D Demonstrations TDP Baseline Technical Design 201120122013 RDR Baseline New baseline inputs TDR TDP-1 TDP-2 Project Proposal
20
The CLIC Two Beam Scheme Two Beam Scheme: Drive Beam supplies RF power 12 GHz bunch structure low energy (2.4 GeV - 240 MeV) high current (100A)
21
CLIC Accelerating Structures 21 Drive Beam Main Beam Objective: Withstand of 100 MV/m without damage breakdown rate < 10 -7 Strong damping of HOMs Technologies: Brazed disks - milled quadrants much progress within the CLIC Collaboration: 33 Institutes involving 21 funding agencies and 18 countries
22
Tentative long-term CLIC scenario Shortest, Success Oriented, Technically Limited Schedule Technology evaluation and Physics assessment based on LHC results for a possible decision on Linear Collider with staged construction starting with the lowest energy required by Physics First Beam? Technical Design Report (TDR) Conceptual Design Report (CDR) Project approval ?
23
Precision Higgs physics LHC + LC Determination of absolute coupling values with high precision
24
Dark Matter and SUSY
25
LC Detector challenges: calorimeter ZHH qqbbbb red: track based green: calorimeter based High precision measurements demand new approach to the reconstruction: particle flow (i.e. reconstruction of ALL individual particles) this requires unprecedented granularity in three dimensions R&D needed now for key components Detector R&D mandatory and well under way
26
FALC July 09 Mike Harrison Global Design Effort An example of an LOI - The ILD group http://www.ilcild.org/documents/il d-letter-of-intent 695 authors, 148 institutions 32 counties Introduction Detector Optimization Physics performance Sub-detector system DAQ and computing Detector integration and MDI Costing The group R&D plan Conclusion
27
Particle Flow LC design goal
28
FALC July 09 Mike Harrison Global Design Effort Slide 28 Linear Collider Collaboration Prompted by the observation that there is significant synergy between the ILC & CLIC programs (electrons, positrons, high brightness beams, collision regions, beam dynamics ….) and a desire to effectively use existing resources several common working groups were set up in 2008.Prompted by the observation that there is significant synergy between the ILC & CLIC programs (electrons, positrons, high brightness beams, collision regions, beam dynamics ….) and a desire to effectively use existing resources several common working groups were set up in 2008. –Conventional facilities –Cost & schedule –Beam dynamics –Machine-Detector Interface & Beam delivery system –Physics & Detectors A recent management meeting at CERN reviewed collaborative status and looked at possible areas for additional co-operation.A recent management meeting at CERN reviewed collaborative status and looked at possible areas for additional co-operation.
29
FALC July 09 Mike Harrison Global Design Effort Slide 29 Linear Collider Collaboration Conclusions from that meeting include: The existing working groups were deemed a success and we added two more (damping rings & positron production)The existing working groups were deemed a success and we added two more (damping rings & positron production) Jean-Pierre Delahaye (CLIC Project Director) will join the GDE EC, and Brian Foster (European Regional Director) will join the CLIC steering committee.Jean-Pierre Delahaye (CLIC Project Director) will join the GDE EC, and Brian Foster (European Regional Director) will join the CLIC steering committee. We will hold a joint annual meeting in 2010.We will hold a joint annual meeting in 2010. There were some discussion about the viability of creating a linear collider program strategy which would encompass both the ILC and CLIC programs. Such a strategy needs to be a win-win for both sides and also create something that is more than the sum of the parts. A joint statement is under consideration.
30
ring-ring solution: L ≤ 10 33 linac-ring solution: L few 10 31 Large Hadron electron Collider: possible layouts Would be the successor of HERA at higher cms 40 - 140 GeV on 1 - 7 TeV
31
Large Hadron electron Collider Goal: CDR late 2010 2010/12 new physics around 2010-12 ?
32
Key Messages Need to clear the cloud of TeV-scale physics to obtain clear views Synergy of colliders sLHC dual purpose luminosity increase and ‘juvenation’ of accelerator complex ILC could be constructed now CLIC more R&D needed Converge towards one LC project Detector R&D mandatory for all projects LHC results decisive 32 Great opportunities ahead at the TeV scale Window of opportunity for decision on the way forward around 2012 (?)