Download presentation
Presentation is loading. Please wait.
Published byFrederica Watson Modified over 8 years ago
1
TREND 963 Basic Operation Course Helpful hints for running your Trend system
2
Possible Items which can be controlled Boilers Pumps Hot Water Systems Air Conditioning Utility meters Outside lighting Slide 1
3
Important Components of controlled heating system Time Schedules Optimiser Compensator Slide 2
4
Accessing the system Type these numbers into Address bar GCC Corporate sites 192.168.220.201 External Address all Schools, (except Pupil Referral Units), 195.188.220.204 Type into Address Bar NOT Search Engine Slide 3
5
Agenda item 5 Logging in Slide 4
6
Slide 5
7
Menu Page To adjust temperatures Click schematics Slide 6
8
Alternative home page To Make Adjustments Slide 7
9
Click services you want to adjust Slide 8
10
Adjusting temperatures Slide 1 Click green tab Slide 9
11
Adjusting temperatures Slide 2 Slide 10
12
Adjusting temperatures – increase to 20.0C Slide 3 Larger version Slide 11
13
Slide 12
14
Adjusting temperatures Slide 4 Complete Slide 13
15
Adjusting times Slide 1 Click diary Slide 14
16
ALL SITE DIARIES WILL BE SHOWN HIGHLIGHT TO VIEW EACH DIARY Slide 15
17
CREATE NEW TIME SCHEMES AND EDIT OR DELETE EXISTING TIMES Slide 16
18
Slide 17
19
Slide 18
20
Slide 19
21
Slide 20
22
Slide 21
23
Slide 22
24
Slide 23
25
Slide 24
26
Slide 25
27
Adjust times by using sliders Slide 26
28
Slide 27
30
Slide 28
31
Slide 29
32
Slide 30
33
Slide 31
34
Hover over option – turns blue then Click here to return to normal diary Slide 24 Slide 32
35
Larger version Slide 25 Slide 33
36
Exception – slide 1 Click ‘new special day’ Slide 34
37
Exception – slide 2 Select label and colour for ‘new special day’ and times for whole day Slide 28 Slide 35
38
Slide 36
39
Slide 37
40
Slide 38
41
Slide 39
42
Slide 40
43
Slide 41
44
Slide 42
45
Slide 43
46
Slide 44
47
Slide 45
48
Slide 46
49
Slide 47
50
Slide 48
51
Main page To view schematics click here Slide 49
52
Grey Box = Sensor showing the data held on sensors – slide Slide 50
53
Click on Grey box for Outside Temp – 24 hours data held in 15 minute intervals Click on line to see actual data at a specific time Available as graph or list Slide 51
54
Click on List to see data in table format Slide 52
55
Select Space Temp for inside temperature graph or list Slide 53
56
Space (inside) Temp Graph Slide 54
57
Coffee Break
58
Common faults and control management on site Summer/winter switch Duty cycle pumps not working Manual settings Location of sensors Doors and windows left open Obstacles in front of radiators Changes of use in rooms Secondary heat from servers Extensions to buildings Extended loss of power Slide 55
59
Support that will be available to you at your premises:- Direct telephone support Property Care Support (if purchased via ‘Buy back’) Slide 56
60
Contacts:- Jason Gregory 01452 425776 jason.gregory@gloucestershire.gov.uk Fax 01452 425792 Building helpdesk building.helpdesk@gloucestershire.gov.uk Property Care Engineers (Buyback option) Slide 57
61
Energy Team Chris Bewley 01452 425250 chris.bewley@gloucestershire.gov.uk Rachel Clarke 01452 425829 rachel.e.clarke@gloucestershire.gov.uk Contacts:- Slide 46
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.