Download presentation
Presentation is loading. Please wait.
Published byValerie Eaton Modified over 8 years ago
1
20152017 Today AprAugDec2016AugDec2017Aug Phase 1 Kickoff 4/10/2015 Project Start 5/1/2015 Project Approved 7/31/2015 Implementation Finished 6/16/2016 Testing Finished 10/15/2016 Phase 1 Close 1/1/2017 0.2 months Requirements Gathering 13 months Business Requirements Alignment 0.4 months Analysis 1.5 months Alignment with Other Departments 0.8 months Design Comparisons 15 months Vendor Selection 19.2 months Maintenance 13 months Effort Estimation 13 months PM Preparation 13.4 months Protoyping 8 months Implementation 13 months API Dev 6 months Customization 13.2 months User Interface 1.1 months Usability 12.5 months Testing Matrix 4 months Testing 1 13.5 months Testing 2 2.2 months Documentation 2.1 months Production
2
To change and update this template automatically, download the free Office Timeline PowerPoint add-in! Office Timeline is a free, award winning, Gantt chart maker that's easy to use. Simple, easy-to-use wizards. Professional, quick results. Built directly into PowerPoint
3
Download Now www.OfficeTimeline.com/download Get the Free Edition Now Easily edit this template or create your own beautiful Gantt chart, quickly, right inside PowerPoint! Copyright © 2012, Office Timeline, LLC. All rights reserved.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.