Download presentation
Presentation is loading. Please wait.
Published byArnold Shanon Chase Modified over 8 years ago
1
Introduce of Linac Control System Xiangcheng.Kong Control Group
2
Architecture
3
Main Function n PS control n Vacuum monitor n Modulator monitor n Step/DC Motor control n safe system n
4
Hardware developer
5
Remote IO feature
6
IO Statistics n Vacuum PS Step Motor Total DA4x161x84 148 AD8x16+62x84 302 DI8x16 1x84+7 219 DO1x161x84+218 102 System estimate : ¥350,000 approximate $42,000
7
Special treatment for RS-422 Extra UART reception schematic diagram *Double port out for RS-422
8
Software environment n Windows 98/NT n Visual c++ n Turbo c n NI LabView n ASM51
9
Console n Trace Ball used as PS regulator n MDI Alarm n www Server for diagnosis n Channel Scan
10
Data Exchange Process Control Program TCP/IP UDP/IP 232 Intermediate transceiver for Intranet 232/CAN & 232/422 Bus Driver
11
The feature of 232 transceiver Intermediate n 10 user if TCP Link n Provide UDP Link Access Method n User ID Verify n FIFO Array n Re-transmit while error occur n Home Made
12
(Continue) The feature of 232 transceiver Intermediate
13
(Continue) the 232 transceiver Intermediate for intranet
14
Diagnosis Tool: Channel Access
15
Threshold value Adjustment App.
16
Klystron Output Display
17
Klystron Output Display for Intranet
18
Discuss n Reliable Link is not guarantee in TCP/IP for a long time because of noise. increate main nodes for data exchange. UDP link for monitor system n Local DataBase establish for physics beam tune and them interface. use commerce DB. server/client Architecture
19
Conclusion n Control system is flexible and open. n System diagnosis perfect include. n Only 2~3 person to do all hardware and software. n Graphics class is developing because of less human resource. n EPICS will start basing on the fieldbus lay.
20
Thank You Very Much
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.