AIM To provide FRS H&S practitioners with an outline of the proposed inspections of the FRS by HSE in 2009/10.
3
Overview 1. Drivers for inspection 2. Outline plan 3. Outcomes 4. Questions
4
Key drivers No recent HSE inspections Police Services inspected last year High level discussions Timely to do so – work on HSWA & Ops Perceived background noise – ‘something not right’ Operational assessment of service delivery (AC) Fatal accidents
5
Outline Plan - Inspection arrangements National inspection team* Lead manager (liaise with sector) Inspectors - experience of fire and rescue services 8 FRS (within GB) Management inspection (HSG65) Time – preparation - 2008/09 inspections – After April ‘09 follow up - 2010
6
Outline plan – Selection of FRS by the Sector Different governance arrangements (Met / County etc) Variety of duty systems (full time/retained) Riddor accident data Inspector / Sector knowledge Liaison with FRS stakeholders (CFRA / AC etc)
7
Outline plan – Inspection topics (general) Will look at some firefighter operational issues but from a HSG65 health & safety view We are liaising with stakeholders about the topics. Approach is largely to check compliance with individual FRS policies & procedures
8
Outline plan – Possible inspection topics An overview of health & safety arrangements (HSG 65) Incident commander training (H&S) Breathing apparatus training (H&S) Hot fire/compartment fire training (H&S) Maintenance of general F/F competence (H&S) Provision of safety critical risk information
9
Outline plan- Pre planning Collate relevant national guidance Secondee from fire service Determine benchmarks Finalise inspection protocol* Explanatory letter to all Chief Fire Officers Ongoing communication with FRS
10
Outline plan – If you are to be inspected Initial contact by lead inspector Provision of requested paperwork / procedures Inspection arrangements firmed up Inspection phase Debrief / report back phase
11
Outline plan – General inspection outcomes ‘Hot’ debrief to FRS (FOD) Bespoke written summary report to FRS (FOD) Collation & analysis of all bespoke reports (Sector) National summary report (Sector) Presentation of national report (Sector) Follow on work – tbc
12
General We are not a panacea. Focused inspection – H&S processes (HSG65). Other local issues via local HSE. We do not aim to be burdensome. H&S should be part of normal mgt.