NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.

Similar presentations


Presentation on theme: "NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at."— Presentation transcript:

1

2 NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at 500 kV Sheikh Muhammadi 1x450-Mar, 2011 2Ext. at 500 kV Tarbela.1x237-Mar, 2011 3Ext. at 220 kV Bannu 1x160- Jun, 2011 4Augmentation of 220 kV at N.K.L.P Lahore 3x250- T2 & T3 Commissioned T1: Dec. 2011 5Upgradation of existing 132 kV to new 220 kV GIS Wapda Town Lahore. 3x160220 kV Lahore - K.L.P D/C In/Out at Wapda Town. (10+10 km) G/station commissioned T/Line by Mar. 2011 6New 220 kV GIS Bandala 2x160220 kV Gatti - K.S.K D/C In/Out at Bandala. (5+5 km) Dec, 2011 7Installation of SVCs at 220 kV N.K.L.P. Lahore. SVCsStatic Var Compensators of appropriate capacity. Dec, 2011 1

3 SR.NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 8Looping In/Out of 220 kV G/Barotha- S/Bagh T/L at Mardan - Looping in & out of one circuit of Ghazi Barotha – Shahi Bagh at Mardan (30 km) June, 2011 9Extension/Augmenta tion at existing substations: - Dec, 2011 500 kV Dadu 1x450 1x160 220 kV Burhan 1x160 220 kV Mardan 1x250 500 kV Sheikh Muhammadi 1x160 500 kV New Rewat 1x250 220 kV Shikarpur 1x160Commissioned 10220 kV Okara 3x250 220 kV Yousafwala - Sarfaraz Nagar D/C In/Out at Okara. (5 + 5km) Dec, 2011 11220 kV Toba Tek Singh/Gojra 3x250220 kV Faisalabad-Multan D/C In&Out at T.T.Singh/Gojra. (1+1 km) Dec, 2011 NTDC ONGOING DEVELOPMENT PROJECTS 2

4 SR. NO. NAME OF NEW SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 12Installation of SVC at Quetta SVCStatic Var Compensators of appropriate capacity Jun, 2012 13Ext. at Ghazi Brotha for addition of 600 MVA 500/220 kV T/F. 1x600- Jun, 2011 14220 kV Loralai2x250 220 kV D.G Khan – Loralai (250 km) Dec, 2012 15Augmentation of 220 kV Ravi at Lahore. 3x250 March, 2011 16500kV D.G Khan Substation. 2x600 2x250 500kV Guddu-Multan 2 nd cct In/Out at D.G. Khan substation(20+20) km Dec, 2012 NTDC ONGOING DEVELOPMENT PROJECTS 3

5 SR. NO. NAME OF NEW SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 17220 kV Rohri New for interconnection of IPPs at Engro Energy PP and Mari (Dharki) CCPP 2x250220 kV D/C T/L Dharki CCPP– Rohri New (115 km) Dec, 2011 132 kV D/C T/L for In/Out of Rohri-Khairpur/Gambat D/C T/L at Rohri New (1+1 km) 220kV D/C Rohri New-Shikarpur T/L (50 km) 220 kV D/C T/L for In/Out of Dharki -Rohri New at Engro CCPP (5+5 km) 132 kV Rohri New-Gambat D/C T/L (53 km) 18220 kV Gridstation at Khuzdar, 2x160 220kV D/C Dadu – Khuzdar Transmission Line (300 km) Dec, 2011 19220 kV Grid Station at Ghazi Road, Lahore 3x160 220 kV D/C T/L for In&Out of NKLP – Sarfraz Nagar at Ghazi Road. (30 km) Dec, 2012 220 kV D/C T/L for In&Out of Ravi– KSK at Ghazi Rd. (30 km) NTDC ONGOING DEVELOPMENT PROJECTS 4

6 SR. NO. NAME OF NEW SUBSTATIONS T/F CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 20220 kV Grid Station at Kassowal along with associated 220kV D/C T/Lines. 2x160 220 kV D/C Transmission Line for In&Out of Vehari – Yousafwala at Kassowal. (45+45 km) Jan, 2012 21220 kV GIS substation at Gwadar 2x160220 kV D/C T/L from Pak-Iran border to Gwadar (100 km) Jun, 2012 22500 kV R.Y.Khan2x600 500 kV Guddu - Multan 3rd Circuit In/Out at R.Y.K (30+30 km)Jun. 2012 23 220 kV GIS Shalamar (Mehmood Buti) 3x250 220 kV Ravi-KSK D/C In/Out at Shalamar (9km long overhead T/L) & (3+3km) cable Jun.2012 NTDC ONGOING DEVELOPMENT PROJECTS 5