www.iid.com Accelerating the Deployment of Clean Renewable Generation
2
www.iid.com 2 Battery Energy Storage System Strategic Partnership IID procured over 150 MW of solar generation to meet its renewable portfolio standard requirement. Does not include over 30 MW of demand-side generation IID is experiencing the impacts of managing intermittent resources. Through a competitive request for proposal process IID selected Coachella Energy Storage Partners (CESP) to construct and integrate to its resource portfolio a 33- MVA/20MWh BESS; project specifics: Building 40ft. x 220ft. 360 battery racks; 5,760 total batteries Thirty 1.25-MVA inverters and thirty 1.275-MVA transformers CESP developed a partnership which included General Electric, Samsung and Chula Vista Electric
3
www.iid.com BESS Benefits A more efficient grid that is more responsive to disruptions: Frequency response (up and down) Voltage response (up and down) Instantaneous generation and transmission outages Black-start capable (4-MW) Intermittency Impacts: Solar /wind real-time fluctuations Increase in the economic value of wind and solar power: Energy “shifting” (mid-peak) Enhances existing generation assets 3
4
www.iid.com 4
5
Commercial Operation Date: September 2016 5
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.