Presentation is loading. Please wait.

Presentation is loading. Please wait.

Start – Stop - Continue Feedback 2014-15. START Facilities – Construct covered loading area at JDPS – Restrooms & concessions at JDMS – Repair old gym.

Similar presentations


Presentation on theme: "Start – Stop - Continue Feedback 2014-15. START Facilities – Construct covered loading area at JDPS – Restrooms & concessions at JDMS – Repair old gym."— Presentation transcript:

1 Start – Stop - Continue Feedback 2014-15

2 START Facilities – Construct covered loading area at JDPS – Restrooms & concessions at JDMS – Repair old gym for a multi-purpose facility – Pave road between HS & PS Technology – Allow students to take Chromebooks home – Formalize process for new and exiting employees

3 START Personnel – Offer a Health Savings Account – Employee discounts at local businesses – Increase clerical and paraprofessional salaries – Increase classified sick days – Add a local supplement – Drug test teachers and paraprofessionals – More professional learning opportunities – Pre-K nurse and counselor – ½ day Math & Science teacher at JDCLA – Local policy to NOT use personal days before/after holidays

4 START Instruction – More $$$ for classroom supplies, more resources in inclusion classrooms – Add more Read 180 & System 44 – Add Math 180 – Increase field trip opportunities – Saxon Math in Grades 1 & 2 – Start each day at all schools with Reading time – Increase offerings with Technical College and add CTAE offerings – Lower class sizes for low level classes

5 START Student Interest – Soccer, Cross-country – Elementary/Middle Art & Technology electives – Student ID badges – Standardized dress code / uniforms – More incentives for students “doing right” – Create a Brag Board at each school – Improve transitions for JDCLA students – Having Honors Programs during the day so all students can see the success of their peers

6 START Other – Start a system-wide activity in Winter & Spring – Pay bonus in mid-January, not November – Offer SACS stakeholder feedback survey every year – Increase the size of teacher lunches – Consider a 4-day week

7 STOP Personnel – Teacher lunch duty – Teacher of the Month – Kelly services for subs – Making teachers pay for breakfast & lunch – Investment groups speaking to teachers – Unnecessary paperwork – TKES & LKES Students – Bullying – Ban on student cell phones

8 STOP Instruction – Oversized classes – Mendez drug program – Ability grouping – AP Classes – Jacket Time – Any Unnecessary Testing Other – Fundraisers – Late updates to Infinite Campus – Observing Veterans Day in middle of week

9 CONTINUE Personnel – System-Wide Communication – All forms of recognition for students & staff – Pre-K Pay – Dress down days for all staff – Faculty Tailgate – Aspiring Leaders program – Experience bonuses at Thanksgiving – Current administrative teams

10 CONTINUE Instruction – System 44 and Read 180 – Block scheduling at high school – Band programs – Quia – Letting students write in Coach books – Move on When Ready / Accel Operations – Copiers in the schools – Pick up and release times – Cutting back on the number of meetings

11 CONTINUE Technology – Updates to technology – Phones in rooms – Cameras and safety Other – Early release – Veterans Day Holiday – Service projects that involve students – Choices Learning Academy

12 CONTINUE Other – College Tour – High School Advisement Program – Curb appeal improvements – Positive PR for System – Prayers for Success – Good TEACHERS and supportive LEADERSHIP


Download ppt "Start – Stop - Continue Feedback 2014-15. START Facilities – Construct covered loading area at JDPS – Restrooms & concessions at JDMS – Repair old gym."

Similar presentations


Ads by Google