Predictive Maintenance Technologies Spirit AeroSystems Inc. Ed Fenn- –Twenty-eight years with Spirit/Boeing –Electrical background –Twenty-four years facilities management –Responsibilities include machine tool retrofit, facilities network, industrial controls and reliability- centered maintenance –Retrofitted over 385 machines and responsible for one patent Don Chrisman –Thirty-one years with Spirit/Boeing –Twenty-years experience maintenance mechanic –Twenty-years experience as a vibration technician –Level 2 vibration certification Todd Shepherd –Twenty-nine years with Spirit/Boeing –Twenty-five years experience maintenance electrician –Four years experience thermography technician –Level 2 thermography certified
2
Predictive Maintenance Technician Spirit AeroSystems Inc. Oil Analysis Vibration Analysis Laser Alignment Ultrasonic Thermography
3
Mission Statement To communicate accurate information through the use of trend analysis, pattern recognition, statistical process analysis and device limit ranges to aid in increasing machine life cycle and machine availability.
4
Oil Analysis Affects on Machine Devices 1.Pumps 2.Oil tank 3.Flow control value 4.Pressure relief valve 5.Cylinders (counter balance) 6.Directional control valves 7.Throttle valve 8.Heat exchangers
5
Oil Analysis (cont.) What we measure Fluid Properties –Viscosity analysis –FTIR – Fourier transform infrared spectroscopy –Element analysis Contamination –Particle count –Moisture analysis –Patch Test Wear Debris –Wear debris density –Analytical ferrography –Elemental analysis
6
Vibration Analysis Periodically collect and analyze vibration data on machine tools and components Install remote collection boxes and permanent mount accelerometers Field balancing on fans and blowers In Shop balancing (Balance Stand) on fans, blowers and rotating components
7
Vibration Analysis (cont.) Laser shaft alignment on rotating equipment (except process pumps) Laser sheave to sheave alignment Acceptance Testing on new equipment and components Assist shop personnel in troubleshooting suspect bearing and alignment problems Ultrasonic testing
8
Thermography Periodically inspect electrical components and control cabinets for heat related issues Assist shop personnel in troubleshooting suspect electrical problems New equipment acceptance testing
9
Thermography (cont.) Aids in identifying bearing and coupling problems in rotating equipment Identify heat exchanger problems Identify problems in heating and cooling coils Identify insulation problems with ovens and furnaces Identify problems with oven and furnace door seals
10
Effects of Vibration on Equipment
11
Vibration Issues - Loop Pump Definition of resonance and demo Base resonance - causing vibration limits to be exceeded during New Equipment Acceptance Testing
12
Vibration Issues – Loop Pump First attempt to qualify new loop pump, concrete pad not adhered to floor Second attempt, resonant condition in pump base identified & eliminated by creating animation to identify flexing points Reasons for animation before adding gussets
13
Vibration Issues w/ Loop Pump First Attempt – Concrete not adhered to floor, noticed base moving during data collection. Contractors corrected by bolting concrete pad to concrete floor.
14
Vibration Issues – Loop Pump
15
Second Attempt – After flexing in pump base was identified with the help of the animation, contractors corrected by welding gussets in proper location.
16
Vibration Issues w/ Sump Cover Resonance condition in sump cover causing premature failure of pump bearings
17
Laser Alignment Shaft to Shaft
19
Laser Alignment Sheave to Sheave
20
Balance Stand Balance rotating components
22
Thermography
23
LIEBERT UPS
24
MILL Fuse
25
STRECH PRESS Pump
26
COLD BOX
27
Questions