History The Baton Rouge, Louisiana SBR/NBR facility was built and brought online by the US Government during WWII to supply synthetic rubber for the war effort. For more than 70 years East West Copolymer’s Baton Rouge facility has been an integral player in synthetic rubber manufacturing. East West Copolymer was formed in 2014 as the investment platform to purchase the Lion Copolymer SBR/NBR business. This group is comprised and led by Greg Nelson, the former Lion CEO & President, Dean Willard & Alto Cheung, both former business partners, and the East West Copolymer Management team. Our longevity and ISO 9001 certification attest to the quality of our products, our commitment to customer service, the character of our people, and the durability of our values. 2 Proprietary and Confidential
3
Community 3 Proprietary and Confidential East West Copolymer employs roughly 160 company and contract personnel to operate their facility in Louisiana. East West Copolymer is a member of Baton Rouge Area Mutual Aid (BRAMA) Active/management members of International Institute of Synthetic Rubber Producers (IISRP) A member of the Louisiana Chemical Industry Alliance (LCIA) & Louisiana Chemical Association (LCA) Participates in “Adopt a School” programs with local schools. Participates and supports several charities, most notably are ones that directly affect our associates and surrounding community.
4
Location 4 Proprietary and Confidential
5
Site Layout 5 Proprietary and Confidential 13 Acres 5 Acres12 Acres
6
Operations 6 Proprietary and Confidential Plant Information: Operations began in 1943 with a hot emulsion polymerization process. The site was built and owned by the United States government, but run by a consortium of seven tire manufacturers. In 1948 the site retooled its process and developed the first cold emulsion polymerization plant in North America. In 1965 Copolymer started production of NBR The Baton Rouge Plant is a continuous process facility The production units operate 24 hours per day, 365 days per year utilizing a12 hour shift schedule. The site produces Synthetic Rubber comprised of SBR and NBR grades. The site is ISO 9001 certified The site also houses East West Copolymer’s Corporate Headquarters and R&D facilities. Around the clock site security Around the clock site medical responders, fire brigade, and hazardous materials response Raw Material Sourcing Pipeline Rail service Truck Site Data Infrastructure:70 Acres Total Land: 95 Acres
7
Facility 7 Proprietary and Confidential Examples of Facilities and Materials available on site: Nitrogen Natural Gas Sulfuric Acid Caustic Acrylonitrile Styrene Butadiene Steam (30 PSIG to 150 PSIG) Process Water Potable Water Firewater Cooling water Rail Access and Rail Car Unloading Track Mobile for Rail Car Moving Tank Truck Unloading Electrical Feeders and Substations Waste Water Treatment 30 Acres of green/brown field 15,000 sqft office space
8
Utilities 8 Proprietary and Confidential Production of 250 PSIG steam for the facility Waste water treatment facility Recovery and recycle of waste rubber Providing cooling for the facility Provide instrument and plant air for the facility Provide firewater for the facility
9
Co-Location 9 Proprietary and Confidential Experienced in Co-Location East West Copolymer, LLC Will Consider: Land Lease Joint Venture Independent Ownership and Operation Contract Operation Surrounded by Large Chemical Plant Complex in North Baton Rouge, LA 30 Acres of “Greenfield” and “Brownfield” facilities 15,000 sqft of office space Shared Onsite Services and Resources Available Including: EH&S, HR, Contract Services, Facility Management, IT, R&D, etc.