Download presentation
Presentation is loading. Please wait.
Published byAlbert Shaw Modified over 8 years ago
1
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting UITF Project Status Meeting Matt Poelker February 23, 2016
2
Thomas Jefferson National Accelerator Facility Page 2 UITF Progress meetingOutline Purpose: to inform Lab Leadership of the UITF status Action Items (from previous meetings) Project Update –Progress Update –Milestones Update –Budget Update –Highlights & Concerns –Next meeting agenda
3
Thomas Jefferson National Accelerator Facility Page 3 UITF Progress meeting Proposed re-scoping Facilities ITFPTB UITFBL ITFCRY Facilities Cryo Infrastructure including some RF Polarized Target Beamline UITF
4
Thomas Jefferson National Accelerator Facility Page 4 UITF Progress meeting Action Items – November 23, 2015 Minutes New Action Items: Recall new dates: Facilities work complete August 2016, Poelker suggests we install new ¼ CM July 2016. MeV beam milestone pushed to September/October 2016. Is this OK with Team HDIce? Yes Can we wrap up UITF capital equipment project in FY16? Yes Downselect our means to cool HDIce: purchase dewars or connect to CTF Firm up the CTF shutdown schedule Poelker/Areti need to focus more attention on review processes and approvals: Operations and Safety Budget: ~ $55k capital equipment shortfall UITF and ~ $833k labor shortfall ITFCRY, ITFPTB and RSR
5
Thomas Jefferson National Accelerator Facility Page 5 UITF Progress meeting Major components Facilities Engineering Mech Design Installation Cryo Safety Systems I&C DC Power Low Level RF systems High Power RF Survey & Alignment SRF Build new ¼ CM Commission with RF Operations Network and communications Progress Update Green means we can see progress
6
Thomas Jefferson National Accelerator Facility Page 6 UITF Progress meeting Major components Source Group Reliable 350kV ops Beam to cup in front of ¼ CM Beam to cup in front of HDIce EHSQ Shielding approval, ODH assessment Global hazard review FSAD Accel Readiness Review Commissioning Plan HDIce Installation at Cave Beam on HDIce Progress Update Green means we can see progress
7
Thomas Jefferson National Accelerator Facility Page 7 UITF Progress meeting Cave 1 electric and network complete NEXT: Clean off ledge and move IPC Status Facilities
8
Thomas Jefferson National Accelerator Facility Page 8 UITF Progress meeting Status Facilities Precast concrete bids to arrive soon – this package includes bracing and means to secure 2 nd layer
9
Thomas Jefferson National Accelerator Facility Page 9 UITF Progress meeting Facilities Tasks and Timeline February 2016 Cave1 electrical work complete Facilities has issued PR for Cave2 concrete and bracing, out for bids March Installation Group willing to secure Cave2 structure, install other utilities April Facilities moves IPC outside Cave2 Concrete for Cave2 arriving on site, installing it Physics installs 2nd layer of concrete, adds bracing May Cave2 including labyrinth complete, roof not yet installed June Facilities focus shifts to utilities inside Cave2: electricity, lights, fire suppression, gate July Facilities continues to work on utilities inside Cave2: electricity, lights, fire suppression, gate August Facilities completes utilities inside Cave2: electricity, lights, fire suppression, gate, entire Cave2 roof installed. All bracing complete Facilities provides power to big Bertha from diesel generator (this could happen later, since no Beam to HDIce until Jan 2017)
10
Thomas Jefferson National Accelerator Facility Page 10 UITF Progress meeting Installed transfer line, leak checked OK Purchased a turbo pump for leaky shield line Building the heat exchanger Controls getting worked Status Cryo Group
11
Thomas Jefferson National Accelerator Facility Page 11 UITF Progress meeting Status Engineering I&C building stripline bpm electronics DC power prep-ing magnet racks RF control boards in fab RF group building second water skid RF group building the klystron control panel Safety System Group on track, ODH and PSS Installation Group done with Cave1, can help with Cave2 when it makes sense
12
Thomas Jefferson National Accelerator Facility Page 12 UITF Progress meeting Met with Cryo, SRF, RF, and Kazimi of Ops Discussing relief valves from ODH point of view Who does what? e.g. Cryo makes u-tubes and SRF stabs them, Cryo pulls cables, SRF provides connectors Expect 8 MeV beam with available klystrons Status New ¼ CM Test at CMTF June Install at UITF July
13
Thomas Jefferson National Accelerator Facility Page 13 UITF Progress meeting Cryo, SRF, RF and new 1/4 CM Recall, we agreed on means to “park” the ¼ CM when not accelerating beam: circulate 80K LN2 through 35K shield line. UITF should not be a burden on CTF 34 wks per year LN2 temp could fluctuate 80 to 100 K, no problem for parking but…. How to cool HDIce? I think we are leaning toward CTF connection… Nagging ODH assessment is “nagging” because some issues were ill-defined: parking strategy and relief valves New ¼ CM requires waveguide tuners Chad Seaton building the high power rf control board Next biggest issue: designing the waveguide layout
14
Thomas Jefferson National Accelerator Facility Page 14 UITF Progress meeting Gun HV power supply installed inside SF6 tank, very little corona at 60 psi Gun table and 80/20 keV beamline structure moved into place NEXT: add gun HV chamber, install big beamline elements, buy stuff…. Status Gun Group buncher HV power supply Barrel polished in 2 days
15
Thomas Jefferson National Accelerator Facility Page 15 UITF Progress meeting Yan Wang’s POISSON simulations validated by Fay Hannon using CST 3D field mapper Status Gun Group 11 MV/m 8 MV/m
16
Thomas Jefferson National Accelerator Facility Page 16 UITF Progress meeting Gun and Beamline at GTS
17
Thomas Jefferson National Accelerator Facility Page 17 UITF Progress meeting Status Operations Network switcher hardware installed Computer terminals installed in control room 6100 IOCs ordered, but we can use older IOCs if needed sooner Groups are installing hardware in racks, and conversations have started with Software (Scott Higgins our POC)
18
Thomas Jefferson National Accelerator Facility Page 18 UITF Progress meeting Status Reviews UITF Accelerator Review: where beamline design is reviewed by Ops/CASA/SRF, March 15, 2016 Geoff Krafft, Mike Spata, Reza Kazimi, Arne Freyberger, Todd Satogata, Bob Rimmer Need to send out pre-review material soon: beamline design, optics envelope, machine protection Safety Systems Review, May 2016 Machine and Personnel, including radiation protection SCMB? UITF Readiness Review, August 2016 Commissioning and Operations plans Experimental Readiness Review, December 2016 Focused on HDIce Documents: FSAD, mini-AOD, ESAD
19
Thomas Jefferson National Accelerator Facility Page 19 UITF Progress meeting Status HDIce Stripline BPMs see 7nA beam with 1 Hz integration time. But we want to see 1nA beam, or even less at UITF. Don’t want to fly blind
20
Thomas Jefferson National Accelerator Facility Page 20 UITF Progress meeting Status HDIce Need to work out details with HDIce and T. Allison, J. Musson I peak I baseline Acceptable duration of high peak current: long enough to see but not long enough to depolarize
21
Thomas Jefferson National Accelerator Facility Page 21 UITF Progress meeting Milestones Update WBSItemMilestone DescriptionStart Date Projected Finish % Complete Days Float? Change (%) Change (Days) 1.04.xx x FacilitiesCivil work complete6-4-15August 2016 50% GunDemonstrate gun ok at 200 kW at FEL GTS December 2015 100%done CMCommission cold ¼ CM, no beam July 201620%10 to 20% Beam from Gun to Cup in front of ¼ CM September 2016 20%10 to 20% Beam thru ¼ @ MeV energy delivered to cup in front of HDIce October 2016 0 Beam to HDIceApril 20170 Facilities work complete by August RF applied to new ¼ CM July Beam at MeV during Fall 2016 Physics preparing for installation of HDIce November, 2016
22
Thomas Jefferson National Accelerator Facility Page 22 UITF Progress meeting Budget Update: Getting into Target $55k UITF capital equipment shortfall, $833k labor shortfall ITFCRY, ITFPTB and RSR Engineering will donate money from one of their accounts to solve the UITF capital equipment shortfall of ~ 50k$. I believe this money will come from an account managed by Anthony Dipette. CEBAF won't suffer because we don't believe the work assigned to this account needs to get done this year. To help address the 833k$ labor shortfall in Accelerator NP accounts ITFCRY and ITFPTB, there are three possible paths forward: 1) Engineering will take a look at their ENGINF accounts to see if they can reduce scope and donate funds to Accelerator 2) Engineering staff who would normally charge RSR will work opportunistically on ITFCRY and ITFPTB when CEBAF does not require assistance. 3) Arne can reduce all RSR accounts by ~ 7% and we can assign this labor to ITFCRY and ITFPTB
23
Thomas Jefferson National Accelerator Facility Page 23 UITF Progress meetingBudget Gun Group procurements reduced by $55k to get capital into target, money moved to ITFPTB in defensible manner (yes, gun group will charge labor to UITFBL)
24
Thomas Jefferson National Accelerator Facility Page 24 UITF Progress meeting Budget UITFBL
25
Thomas Jefferson National Accelerator Facility Page 25 UITF Progress meeting Budget ITFCRY
26
Thomas Jefferson National Accelerator Facility Page 26 UITF Progress meeting Budget ITFPTB
27
Thomas Jefferson National Accelerator Facility Page 27 UITF Progress meeting Schedule Ramifications Current status: Need to revisit Cryo costs, and especially costs related to connecting HDIce to CTF Fill the racks and start loading software – success will depend on groups working opportunistically on UITF ¼ CM – where the work of many groups converge…. Designer Shaun Gregory oversubscribed: moveable supports for “big” beamline items, waveguides, “songsheets”, stripline BPM can, chopper chamber, MeV beamline and 80/20 girder structure Gun Group tech support occupied at LERF GTS right now Have to get SCMB to weigh in on UITF shielding and means by which we limit beam current (e.g., PSS BCM(s)) RadCon: installing CARMS, is that a big job?
28
Thomas Jefferson National Accelerator Facility Page 28 UITF Progress meetingSummary There’s continued progress….
29
Thomas Jefferson National Accelerator Facility Page 29 UITF Progress meeting Backup Slides Backup slides from past meetings, P&C meetings
30
Thomas Jefferson National Accelerator Facility Page 30 UITF Progress meeting To refresh your memory… What we started with… UITF as imagined
31
Thomas Jefferson National Accelerator Facility Page 31 UITF Progress meeting Design work was stopped…would like it to continue
32
Thomas Jefferson National Accelerator Facility Page 32 UITF Progress meeting Status HDIce Lots of scattering at MeV energy. Beam size very large at target. Decided to flip the orientation of the target Cave2 design seems fine either way, need a Physics designer to be responsible for installation at UITF Target here Upstream radiation baffle blows up beam In this configuration, we can achieve desired small beam size at target Target here, better e-beam
33
Thomas Jefferson National Accelerator Facility Page 33 UITF Progress meeting Facilities (T. Renzo)
34
Thomas Jefferson National Accelerator Facility Page 34 UITF Progress meeting
35
Thomas Jefferson National Accelerator Facility Page 35 UITF Progress meeting Combine the two features that provided incremental success: shed and doped insulator Next test late September
36
Thomas Jefferson National Accelerator Facility Page 36 UITF Progress meeting The new gun happy at 325 kV, stopping at this voltage for now. Shifting focus to building the beamline and photocathode deposition chamber (LDRD magnetized beam tests) Building the electron gun at LERF GTS
37
Thomas Jefferson National Accelerator Facility Page 37 UITF Progress meeting Status SSG ODH system relatively simple: but need the power box removed from Cave2 PSS system more complicated: need Cave2 with a door, to install maglocks Henry thinks his group can do the work if CEBAF work doesn’t get in the way (Hall A ion chambers, Hall C in spring?)
38
Thomas Jefferson National Accelerator Facility Page 38 UITF Progress meeting Schedule Ramifications Commission ¼ CM (no beam), scheduled for Feb 2016 Electric/FM – ($78k + $23k for com. conduit) 101 k$ Control room – - SRF checkout of ¼ CM present condition – - Low Level RF – 16 k$ High Power RF – 25 k$ Network controls – 33 k$ Software control of RF – - adequate shielding (Cave2 with a roof) – - Cryo – (controls and pipe) 68 +/- k$ Installation group 9 k$ ODH - SSG 2 k$ EHS&Q approvals… - Total 254 k$
39
Thomas Jefferson National Accelerator Facility Page 39 UITF Progress meeting FY16 Procurements? ~ required spent in FY14 FY15 To purchase in FY16 Facilities:30056.2245 Cryo90.80 waiting for update RF252.5121.4131.1 Gun451.2265.5130includes beamline components + contract designer I&C219.57.6211.9Hope to reduce this number using PLC technology SSG45.7144.7 DC power144.51008Trim cards… Magnets120119.30 shop to make quads, assumed 100k but could be less Still need three dipoles Network58 0 Total1682671862Of course, hope the number comes in lower: 750 k$
40
Thomas Jefferson National Accelerator Facility Page 40 UITF Progress meeting Original vs Current Cost Estimate Presented at UITF meeting May 13, 2015: Total cost estimate. The specific allocations for FY15 and 16 are not correct Original Est. by Hari Areti FTEsLaborProcTotalLaborProcTotal on 2-7- 2014FY143.7 462.54 478.95 941.49 682.70 671.23 1,353.94 FY152.5 312.08 557.10 869.18 465.00 830.07 1,295.07 FY160 - - - - - - Total6.2 774.62 1,036.05 1,810.66 1,333.458 1,501.306 2,649.011 Revised Est. FTEsLaborProcTotalLaborProcTotal by Matt PoelkerFY141.2 160.32 189.48 349.80 233.08 274.29 507.3747.6% on 5-13- 2015FY158.6 937.36 611.17 1,548.53 1,396.67 907.95 2,304.6249.0% FY167.9 940.39 881.33 1,821.72 1,422.80 1,333.46 2,756.2651.3% Total17.7 2,038.07 1,681.98 3,720.05 3,052.56 2,515.70 5,568.26 Dfference from original estimate (11.5) (1,263.46) (645.93) (1,909.39) (1,719.10) (1,014.40) (2,919.25) Loaded $Direct $
41
Thomas Jefferson National Accelerator Facility Page 41 UITF Progress meeting Revised Estimates Breakdown Original request to DOE: $2.6M (loaded) Current estimate for completion: $5.6 M (loaded) Delta increase of $2.9M (loaded) Labor estimates Underestimated effort by 11.5 FTEs Increased labor by $1.7M (loaded) Procurements Underestimated by ~$1M (loaded) Several sub-system components were not included in the original estimate and later determined were necessary to complete the scope
42
Thomas Jefferson National Accelerator Facility Page 42 UITF Progress meeting Comparison Procurement Estimates (Direct $) SystemPrevNowDeltaComment Facilities305300-5(numbers are Proc and Labor) Safety System5946-13 RF Systems125253+128rf control boards, klystron PS Cryogenics4091+51Pipe, heat exchanger Polarized Source255262+7Gun insulators, beamline parts I&C131220+89BPMs, viewers, picoammeters DC Power0145+145Trim cards and parts Magnets58120+62Addl. quads, correctors, dipoles SRF500-50 HDIce50-5 Network, IOCs058+58 CIS FY14 Actuals0189+189FY14 actuals Total1,0281,684+656
43
Thomas Jefferson National Accelerator Facility Page 43 UITF Progress meeting FY14 and FY15 UITF Procurements FY14FY15 Addl. expected FY15 procurements Solid Works CAD2.2Insulator flange1 Contract Mech Designer~ 30 450kV HV power supply31.1bpm components7.6 stairs~ 20 semiconducting R30 insulators52.6 semiconducting R30 insulators_v222.3 trim cards~100 gun HV chamber7.8 Klystron HV power supply55.5 quad magnets (machine shop)70 to 130 ion pumps15.1concrete wall removal32 Chopper rf amplifiers (x2)44 beamline Y chamber5LLRF parts15.1 water skid for chopper3 photocathode prep chamber4.5steering magnets19.3 keV beamline support structure6.5 drill penetrations in concrete4.2SF6 tank11.3 Addl. FY15 procurement total303.5 assorted3.9waveguide3.8 Credit card21.8SSG sensor1 Machine shop40.8assorted9.4 total189total178.3 FY14 + FY15 Procurements: 670.8 UITF Total Procurements 1682
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.