Download presentation
Presentation is loading. Please wait.
1
Jean Vieille www.syntropicfactory.info j.vieille@syntropicfactory.info Research community www.controlchainmanagement.org Consulting group www.controlchaingroup.com This work is licensed under a Creative Commons Attribution-ShareAlike 3.0 Unported License.Creative Commons Attribution-ShareAlike 3.0 Unported License Attribution: Jean Vieille Work:ISA8895 Implementation Section:Interoperability Chapter : B2O Examples : Operations Schedule Language:English Version:V3 - 05/2011
2
Production Operations Schedule 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule2 Operations Request Production Segment Requirement Production 0..n Segment Requirement Production Segment Requirement Production 0..n (Unit Procedure) (Production order) (Operation) Operations Schedule Production 0..n (Phase) Material Specification Being Produced 0..n Material Specification Being Consumed 0..n Operations Type attribute Resource Use attribute 0..n Equipment Specification Contributing Personnel Specification Contributing
3
Quality Operations Schedule (for Material) 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule3 Operations Request Quality Segment Req Quality 0..n Segment Req Quality Segment Req Quality 0..n (Inspection) (QA Test Operation) (Sampling) Operations Schedule Quality 0..n (Testing) 0..n Material Spec Being Tested 0..n Material Property Equipment Spec Contributing Personnel Spec Contributing Material Spec Being Consumed Reagents 0..n LaboratorianAnalyzer Sample Tested characteristic
4
Example of mapping SAP Inspection Lot (Physical Sample) 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule4 Inspection Lot Operation Characteristic Segment (Operation) Segment (Sampling) Operation Request Work Center Material Number Material Property Method Physical Sampling 1 1..m 1..n 1 1 Segment (Testing) Material Spec Equipment Spec Material Spec 1..m 1..n 1 1 ERP ISA-95
5
Quality Operations Schedule (for Equipment) 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule5 Operations Request Quality Segment Req Quality 0..n Segment Req Quality 0..n (Inspection) (Equipment Test program) Operations Schedule Quality 0..n (Testing) 0..n Equipment Spec Being Tested 0..n Equipment Property Equipment Spec Contributing Personnel Spec Contributing 0..n Testing deviceInspector Machine under testing Tested characteristic
6
Quality Operations Schedule (for Personnel) 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule6 Operations Request Quality Segment Req Quality 0..n (Examination) Operations Schedule Quality 0..n (Test) 0..n Personnel Spec Being Tested Personnel Property Personnel Spec Contributing 0..n Examinator Examinee Tested skills
7
Maintenance Operations Schedule 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule7 Operations Request Maintenance Segment Req Maintenance Segment Req Maintenance 0..n (Maintenance Order) (Maintenance Request) Operations Schedule Maintenance 0..n Physical Asset Spec Being Repaired 0..n Equipment Spec Contributing Personnel Spec Contributing Material Spec Contributing Lubricant, cleanser 0..n RepairmenTools Machine under maintenance Equipment Spec Being Repaired 0..n Machine to be repaired (Maintenance Request Subject)
8
Inventory Operations Schedule 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule8 Operations Request Inventory Segment Requirement Inventory 0..n (Transfer Operation) (Transfer order) Operations Schedule Inventory 0..n Material Specification Being Moved To 0..n Equipment Specification Contributing Personnel Specification Contributing Material Specification Being Moved From 0..n
9
Mixed Operations Schedule 5_11_ISA8895_Interoperability_B2O_Example-OperationsSchedule9 Operations Request mixed Segment Requirement Mixed 0..n Operations Schedule 0..n Material Spec Being Tested 0..n Equipment Spec Contributing Material Spec Being Consumed 0..n Operations Request Production Operations Request Maintenance Operations Request Quality Operations Request Inventory Segment Requirement Production Segment Requirement Maintenance Segment Requirement Quality Segment Requirement Inventory Material Spec Being Moved From Material Spec Being Produced 0..n Machine allocated To production Raw Material dispensing From Warehouse to production area Material incorporated Material Spec Being Moved To 0..n Sample and QA results Inventory Operations Production Operations Quality Operations Material created
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.