Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.

Similar presentations


Presentation on theme: "Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by."— Presentation transcript:

1 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by teleconference Ricardo Moyano, DEIMOS Space Reuben Wright, DEIMOS Space Philippe Merigot, SPOT Image

2 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 2  Schedule  Deliverables Software Requirements Software Design  Work in progress SPS Specification SPS Library DEIMOS Development SPOT Development

3 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 3 Schedule : HMA “short” schedule shall be applied

4 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 4 Deliverables: Overview DescriptionPlanned Delivery Actual Delivery SPS mandatory I/F Requirement Baseline (KO+1,5m) SPS mandatory I/F Software Specification Document PM1 (KO+3m) 2/10/2008 SPS mandatory I/F Software Design DocumentPM1 (KO+3m) 6/10/2008 Software Validation Testing Specification of the SPS mandatory I/F PM2 (KO+5m) Validated SPOT SPS mandatory I/F softwarePM2 (KO+5m) Validated DEIMOS SPS mandatory I/F softwareAR-1 (KO+7m) SPS mandatory I/F Validation Test ReportAR-1 (KO+7m) Progress reports and management documentation-

5 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 5 Deliverables  Software Requirements DEIMOS standard Software Requirements Document References the Statement of Work, and OGC standards Review version delivered to Wiki  Software Design DEIMOS standard Architecture Design Document Traceability matrices back to SRD Covers both DEIMOS and SPOT developments  Review versions delivered to Wiki http://wiki.services.eoportal.org/tiki-index.php?page=HMA-T+Deliverables

6 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 6 Work In progress: SPS specification  SPOT SPS Specification still under construction by the editor - planning to be discussed during next TC (December) - UML & Schemas relatively stables available here: http://dev.igsi.eu SPS EO - draft uploaded on the twiki (Nov. 18th) - final version after SPS 2.0 has been released

7 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 7 Work In progress: SPS library  SPOT Release Candidate version delivered to Deimos on Oct 8 th Readers and writers for SPS 2.0 requests and responses: GetCapabilities, DescribeTasking, GetFeasibility, Submit, GetStatus, DescribeResultAccess Helpers to handle Optical and SAR tasking parameters as well as corresponding feasibility study responses  Remaining Work (SPOT) Helpers for GetStatus and GetCapabilities responses Keep adjusting to latest SPS 2.0 schema changes

8 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 8 Work In progress: DEIMOS SPS development  Axis 2 webservices environment on Tomcat  Contract first approach WSDL created DescribeTasking XML written Automated code generation  Code extended to: extract SOAP contents, write return SOAP messages access SPS library to extract parameters  Simple test environment set up in Eclipse

9 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 9 Work In progress: SPOT SPS development  Done Environment set (apache/tomcat, Axis2) WSDL and classes generated DescribeTasking response Feasibility library  To be implemented SPS EO operations Notification server

10 Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 10 RIDs  YC-11 – YC-20: OGC 07-018 v2.0 draft  YC-31 – YC-38: HMAT-DMS-ADD-0001 issue 1.0  YC-39 – YC-47: HMA-T-DMS-SRD-001 issue 1.0


Download ppt "Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by."