Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services
2
Essex County Highways 2016 Construction Program Highlights –$23,289,000 expenditure level –Includes approx. $2,100,000 from 2015 –Rehabilitation Program ($10 M) –Capacity Improvement Program($10.3M) –CWATS Implementation ($2.9 M)
3
Rehabilitation Program 28 Planned Projects –6 Bridges ( 4 Construction, 2 Engineering) –8 Culverts ( 4 Construction, 4 Engineering ) –14 Roads –Miscellaneous Maintenance Projects
4
Capacity Improvement Program County is continuing a multi year capacity improvement program for the network Senior level funding includes –Federal Gas Tax $2M –Ontario Community Infrastructure Fund $195,000
5
Essex County Highways Bridge Projects ($1,907,000) –4 Structure RehabilitationsLow eTender Bidder CR 8 @ Silver CreekIntrepid General CR 2 @ Pike CreekFront Construction CR 8 @ Bow StringFront Construction CR 27 @ Belle RiverSLR –2 Engineering projects for 2017 construction: CR 42 @ Tremblay Creek CR 14 @ Ruscom River
6
Essex County Highways Culvert / Drainage ( $2,326,000 ) –CR 42 @ 8 th Concession culvert replacement (SLR) –CR 42 @ CR 35 culvert rehabilitation (SLR) –CR 23 @ Wismer Arch Taylor culvert replacement –CR 31 Malden drain culvert replacement –4 - Culvert Engineering projects for 2017 construction CR 11 @ Webster Drain CR 34 @ Wilkinson Shilson Drain CR 12 @ Craig’s Creek Bundle 3 culverts on CR 2, CR 8, CR 27
7
Essex County Highways Road Projects ($5,915,000) –Recycling/Resurfacing 31.5 km: CR 29- Kingsville CR 1 - Lakeshore CR 10 - Amherstburg CR 11 - Essex CR 14 - Kingsville CR 15 - Essex CR 18 - Leamington CR 22/ Lesperance - Tecumseh CR 31 roundabout – Kingsville, Leamington CR 42 - Tecumseh CR 43 - Tecumseh CR 45 – Kingsville CR 46 - Lakeshore
8
Essex County Highways Road Projects ($5,915,000) –Recycling/Resurfacing 31.5 km –Cold in place asphalt works (eTender bid Coco) –Surface asphalt over Cold in Place –Mill and pave works –Partial pave shoulder works –Intersection works
9
Essex County Highways Pavement Preservation ( $300,000 ) –Route and Seal – various locations –Surface Treatment – CR 37 - 4 km Bridge / Culvert Preservation ($245,000) –Various deck and expansion joint repairs –Various guiderail repairs / upgrades Estimated Quantities –32,000 tonnes of Hot Mix Asphalt –137,000 sm. of Pavement Recycling –34,000 tonnes of Granular A
10
Essex County Highways Capacity Projects ( +/- $10 M) –CR 22 Phase 6 (I. C. Roy intersection) –CR 19/22 Improvements –Various Connecting Link projects with Towns CR 6 (Todd Lane) – LaSalle CR 40 (Sprucewood) – LaSalle
11
Essex County Highways EA’s / Engineering in Process: –CR 20 EA, Kingsville –CR 23 widening @ CR 18 (3 km) –CR 42 detailed design, City limit to CR 19 –Proposed roundabouts CR 9/18 and CR 11 South Talbot intersections –Transportation Master Plan Update –Lauzon Parkway Extension – MTO/CoW /CoE –Active Transportation System ($52M)
12
Essex County Highways Thank you for your interest, Thank you for your support in delivering our annual programs, Looking forward to working safely through the 2016 construction season.