3
Objectives Update you on the status of this project Identify the challenges to be faced Clarify the project schedules Hear your input
4
Project Background This project is a part of the JTAMobilityWorks program, which is funded from bonds issued against the 2014 extension of the Local Option Gas Tax. Work on the project was previously completed through the City of Jacksonville's Better Jacksonville program.
5
4 Program Map
6
Project Overview Girvin Road project involves approximately 2.9 miles of roadway reconstruction from Atlantic Boulevard to Wonderwood Drive Upon completion, the roadway will feature a five lane urban section south of Ashley Melisse Boulevard to Atlantic Blvd. and a three lane urban section north of Ashley Melisse Boulevard to Wonderwood Dr. Design-Build Cost: $17,485,890.99
7
Project Scope Scope of work includes: Curb and gutter Closed drainage system Center turn lanes and grassed medians Lighting Sidewalks Utility relocations ► JEA Water and Sewer
8
Project Status RB Baker Construction will complete final design and construction ► The original design plans were prepared for CoJ under the Better Jacksonville Plan The project is being completed through Design-Build Right-of-way was acquired by CoJ Original permits have expired and new permits must be obtained
9
Typical Section (Atlantic to Ashley Melisse)
10
Typical Section (Ashley Melisse to Wonderwood)
11
Schedule Anticipated Project Schedule: March 2016 Summer 2016 Spring 2018 Begin ConstructionProject Completion Begin Design
12
Project Challenges 100% plans previously completed for CoJ Plans were returned to 60% level due to lapsed time and permitting issues ► Survey to confirm existing elevations ► Existing utilities may require adjustments ► Drainage design ► New permitting requirements
13
Project Challenges Roadway design adjustments required to meet current standards ► 40 mph design speed ► Lane widths and cross-slope adjustments ► Elevation changes Drainage design must be fully reviewed and may require rework in some areas Final utility design for relocation and coordination Temporary construction easements
14
Design Modifications and Improvements Traffic signals and intersection improvements at two intersections: Girvin Road @ Atlantic Blvd Girvin Road @ Joeandy Road
15
Contact Information Wendy Morrow Events/Projects Coordinator Jacksonville Transportation Authority 121 W. Forsyth Street, Suite 200 Jacksonville, FL 32202 wmorrow@jtafla.com 904-598-8733