3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting November
2
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule Deliverables Work in Progress sweCommon (OGC 08-094) SPS 2.0 (OGC09-000) SPS for EO Application profile (OGC 07-018) SFRE Requirements Baseline Document
3
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule 1/2
4
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule 2/2
5
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Documentation Deliverables
6
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Software Deliverables Software
7
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: DEIMOS 1/2 WP 1000: Project Office [Begun – PMP and PAP delivered] project management, product assurance and configuration management DEIMOS participation in OGC Technical Committee meetings WP 3000: Sensor Feasibility Reference Environment SFRE Requirement Baseline generation Overall SFRE Technical Specification Generation Overall SFRE design 4 different configurations. Will include the modelling of Sensor unavailability, Weather conditions, Station unavailability SFRE server coding and unit testing SFRE Client/server integration
8
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: DEIMOS 2/2 WP 4000: SPS App. Profile for EO - Conformance Testing Abstract Test Suite creation [Begun – Guidelines from HMA-T for ATS structure compared with existing SPS information] As part of the SPS EO Application profile specification Executable Test Suite creation a set of scripts written in CTL (Compliance Test Language). Process as established in HMA-T Conformance Testing of the SFRE the SFRE Server components and use of the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project Overall SFRE Acceptance aligned to ESA ECSS, the terminology and new approach used within OGC, and new TEAM engine Acceptance Test Report generation WP 6000: Warranty
9
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: SPOT 1/2 OGC Technical Committee meetings participation [Begun - At Darmstadt in SweCommon DM 2.0, SPS 2.0] - SweCommon Data Model 2.0 WG - SPS 2.0 WG WP 2000: Completion of the SPS Specification SweCommon specification completion [Begun – V2 Data Model work - schemas have been generated from UML] - Finalization of the specification : GML 3.2.1, Schemas, examples… - OGC submission and follow-up Support iGSI to SPS specification completion [Begun] - Contribute to the SPS specification document SPS EO specification completion - Finalization of the specification : GetSensorWorkload, validation of acquisitions, ATS… - OGC submission and follow-up
10
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: SPOT 2/2 WP 3000: Sensor Feasibility Reference Environment Support to SFRE coding and UT - Update the SPS EO library - Provide a Notification library Support to SFRE Acceptance WP 5000: Additional Server Environments Demonstration - SPS Server with Optical Mission Feasibility analysis WP 6000: Warranty
11
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: ASTRIUM OGC Technical Committee meetings participation - Support DEIMOS and SPOT as necessary WP 3000: Sensor Feasibility Reference Environment SFRE RB Generation SFRE TS Generation SFRE Design - Contribution to the design of the SFRE system focussing on the client components SFRE Client coding and testing WP 4000: SPS App. Profile for EO - Conformance Testing SFRE Acceptance - Contribution to the Acceptance of the SFRE WP 5000: Additional Server Environments Demonstration - SPS Server with Radar Mission Feasibility analysis WP 6000: Warranty
12
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: iGSI WP 2000: Completion of the SPS Specification Overall SPS specification completion [Begun – The modeling part of SPS 2.0 (and corresponding SweCommon and SweServiceCommon relevant for SPS) are completed. Specification writing in progress] SPS 2.0 development (current standard: SPS 1.0) Main work items: Harmonization with SweCommon / SweCommon services New interaction models and patterns New state transition model Updated bindings & information models OGC SPS 2.0 Standards Working Group already formed Timing: M1-M4 (SPS uses SweCommon, therefore depends on [WP2100] SweCommon specification completion) Presentation at OGC TC Meeting (Fall/Winter 2009). Submission to OGC Voting Process IGSI support to SPS EO Specification completion