3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.

Similar presentations


Presentation on theme: "3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly."— Presentation transcript:

1 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting November

2 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service  Schedule  Deliverables  Work in Progress sweCommon (OGC 08-094) SPS 2.0 (OGC09-000) SPS for EO Application profile (OGC 07-018) SFRE Requirements Baseline Document

3 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule 1/2

4 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Schedule 2/2

5 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Documentation Deliverables

6 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Proposal Information: List of Software Deliverables Software

7 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: DEIMOS 1/2  WP 1000: Project Office [Begun – PMP and PAP delivered]  project management, product assurance and configuration management  DEIMOS participation in OGC Technical Committee meetings  WP 3000: Sensor Feasibility Reference Environment  SFRE Requirement Baseline generation  Overall SFRE Technical Specification Generation  Overall SFRE design  4 different configurations. Will include the modelling of Sensor unavailability, Weather conditions, Station unavailability  SFRE server coding and unit testing  SFRE Client/server integration

8 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: DEIMOS 2/2  WP 4000: SPS App. Profile for EO - Conformance Testing  Abstract Test Suite creation [Begun – Guidelines from HMA-T for ATS structure compared with existing SPS information]  As part of the SPS EO Application profile specification  Executable Test Suite creation  a set of scripts written in CTL (Compliance Test Language). Process as established in HMA-T  Conformance Testing of the SFRE  the SFRE Server components and use of the TeamEngine (Test, Evaluation And Measurement), an open source compliance test engine extended during the HMA-T project  Overall SFRE Acceptance  aligned to ESA ECSS, the terminology and new approach used within OGC, and new TEAM engine  Acceptance Test Report generation  WP 6000: Warranty

9 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: SPOT 1/2  OGC Technical Committee meetings participation [Begun - At Darmstadt in SweCommon DM 2.0, SPS 2.0] - SweCommon Data Model 2.0 WG - SPS 2.0 WG  WP 2000: Completion of the SPS Specification  SweCommon specification completion [Begun – V2 Data Model work - schemas have been generated from UML] - Finalization of the specification : GML 3.2.1, Schemas, examples… - OGC submission and follow-up  Support iGSI to SPS specification completion [Begun] - Contribute to the SPS specification document  SPS EO specification completion - Finalization of the specification : GetSensorWorkload, validation of acquisitions, ATS… - OGC submission and follow-up

10 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: SPOT 2/2  WP 3000: Sensor Feasibility Reference Environment  Support to SFRE coding and UT - Update the SPS EO library - Provide a Notification library  Support to SFRE Acceptance  WP 5000: Additional Server Environments Demonstration - SPS Server with Optical Mission Feasibility analysis  WP 6000: Warranty

11 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: ASTRIUM  OGC Technical Committee meetings participation - Support DEIMOS and SPOT as necessary  WP 3000: Sensor Feasibility Reference Environment  SFRE RB Generation  SFRE TS Generation  SFRE Design - Contribution to the design of the SFRE system focussing on the client components  SFRE Client coding and testing  WP 4000: SPS App. Profile for EO - Conformance Testing  SFRE Acceptance - Contribution to the Acceptance of the SFRE  WP 5000: Additional Server Environments Demonstration - SPS Server with Radar Mission Feasibility analysis  WP 6000: Warranty

12 3 November 2009 HMA-FO Task 2: Feasibility Analysis Service Work Packages: iGSI  WP 2000: Completion of the SPS Specification  Overall SPS specification completion [Begun – The modeling part of SPS 2.0 (and corresponding SweCommon and SweServiceCommon relevant for SPS) are completed. Specification writing in progress]  SPS 2.0 development (current standard: SPS 1.0)  Main work items:  Harmonization with SweCommon / SweCommon services  New interaction models and patterns  New state transition model  Updated bindings & information models  OGC SPS 2.0 Standards Working Group already formed  Timing: M1-M4 (SPS uses SweCommon, therefore depends on [WP2100] SweCommon specification completion)  Presentation at OGC TC Meeting (Fall/Winter 2009). Submission to OGC Voting Process  IGSI support to SPS EO Specification completion